SS9901-PS040619PRO,TECT FACTS by
Ken Griffin, P.E., bit. of Engineering/Public Works
972/304-3686 or e-moil kgriffin ci.copp¢ll.tx.us
PROJECT NAME: DEFOREST ROAD LIFT STATION IMPROVEMENTS
FORCE MAIN LINE 'D' Project # SS 99-01
LIMITS OF PROJECT: MacArthur Blvd. (Deforest Rd to Village Pkwy)
TIMELLIlE OF PROJECT: June 2004 thru March 2005
CONTRACTOR CONTACT NO.: MasTer North America, Inc. 214/571-2568
CITY INSPECTOR & TELEPHONE NO.: Rick O'Dell 972/304-7090
CITY OF COPPELL ENG1NEERLYG DEPT. NO.: 972/304-3679
MasTec North America, Inc., was awarded the contract to install a new sanitary sewer
fi)fcc main in the median of MacArthur Blvd., from Deforest Road to Village Parkway, as
part of the upgrade to our sanitary sewer system. At Village Parkway, it will proceed in an
easterly direction to the city's pump station, and then proceed southerly across Sandy Lake
Road to the existing sanitary sewer lift station, behind the vacant shopping center at the
southeast comer of MacArthur and Sandy Lake.
Directional Drilling is thc technique that the contractor will be utilizing on this project.
The directional drilling option was selected to mininqize the impact on existing trees and
landscaping within the median. The equipment associated with directional drilling is quite
large and at times noisy.
Construction Schedule is anticipated to take 300 days, beginning in June 2004 and
continuing through March 2005. During this time expect delays. You may want to seek
alternate routes. We apologize for any incomenience this may cause.
£f you wouM like to receive per/halle updates on thl~ project and other
projects wl'thlh the city,/o_q on to the c/t)/'s web s/re at cll coppe/Z tx.u$ and Sl~ynup for
Coppe//~ 'Ad)/Coppe//' w//I send )/ou weekl)/ updates on constructlbn projects.
Proposed Sanitary Sewer Force Main
Line "D"
City of Coppell Project SS99-01