Loading...
ST0102-LR030701RoneEngineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Attn: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Report No.: 178070 Project No.: 027176 Date of Service: 06/02/2003 Report Date: 07/01/2003 Project: Ruby Road (ST 01-02) Coppell, TX Services: Obtain samples of flesh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Tiseo Paving CONCRETE SUPPLIER: Tiseo Paving PLANT: Dallas SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3"-5" 4% - 6% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C- 1064 ASTM C-138 ASTM C-39 PROJECT DATA MIXDESIGN I.D.: 3 PLACE}lENT DATE: 06/02/2003 WEATHER CONDITIONS: Clear TIME SAMPLED: 4:30pm BATCHTIME: 3:51pm TEMPERATURE (F) - AIR 90 F CONCRETE: 89 F TRUCK NO: 147 TICKET NO: NA AIR CONTENT (%): 4.1 UN1TWEIGHT(pcf): NA OVERALL PLACEMENT LOCATION: Paving - Ruby Road - eastbound lane, Station 18+00 thru 24+00 SAMPLE LOCATION: Station 22+00 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 4.0 1 2 4.0 1 3 4.0 1 4 4.0 DArE AGE TESTED (days) 06/06/2003 4 06/09/2003 7 06/30/2003 28 06/30/2003 28 MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE (tbs.~rce) (psi) TYPE 116385 4120 Unbonded Cap 119230 4220 Unbonded Cap 148805 5260 Unbonded Cap 145400 5140 Unbonded Cap Average 5200 Technician: Shawn Deal Report Distribution: (1) City of Coppell (1) Tiseo Paving Company (1) Pacbeco Koch (I) Wright Construction Company Started: l:30pm Finished: 5:15pm~°~ngineers' Ltd' // ~/ ~ JohnMoody ,O' / Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specitic samples provided ~br testing. We assume no responsibilit~ for variation in quality (composition, appearance, performance, etc.) or any other l~ature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are lbr the exclusive use of the clients o whom they are addressed and shall not be reproduced except in rial without the written approval of Rone Engineers, Ltd. paa_e I of 1 RoneEngineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Attn: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Services: Report No.: 178054 Project No.: 027176 Date of Service: 06/02/2003 Report Date: 07/01/2003 Obtain samples of flesh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Tiseo Paving CONCRETE SUPPLIER: Tiseo VLANT: Dallas SPECIFICA FION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 4% - 6% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 3 PLACENIENT DATE: 06/02/2003 W3EATHER CONDITIONS: Partly cloudy TIME SAMPLED: l:15pm BATCHTIME: 12:24pm TEMPERATURE (F)-AIR 83 F CONCRETE: 93 F TRUCKNO: !47 TICKETNO: NA AIR CONTENT (%): 4.8 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Paving - Ruby Road - eastbound lane, Station 18+50 tt~m 24+00 SAMPLE LOCATION: Station 19+00 REPORT OF TE~qT~q Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 1 1 2.75 1 2 2.75 1 3 2.75 1 4 2.75 DATE TESTED 06/06/20O3 06/09/2003 06/30/2003 06/30/2003 MAX1MUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) (lbs. force) (psi) TYPE 4 104955 3710 Unbonded Cap 7 120450 4260 Unbonded Cap 28 152500 5390 Unbonded Cap 28 149250 5280 Unbonded Cap Average 5340 Technician: Richard Bullion Report Distribution: (1) City o£Coppell (1) Tiseo Paving Company (I) Pachcco Koch (I) Wright Construction Company Started: 12:15pm Finished: 2:30pm../.~ Engineers, Ltd. /y' ~/ Jolm Moody ~ ~// Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc ) or any other tEature of similar sub ect ma er provided bv persons or conditions over which we have no control. Our letters and reports are for the exclasive use of thc clients to ~,hom they arc addressed and shall not be reproduced except in full without the written approval of RoDe Engineers, Ltd. Page I of 1