ST0102-LR030610RoneEn
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF CYLINDER COLLECTION
Client:
Ci~ of Coppell
Arm:Ms. Suzan Taylor
PO Box478
CoppeI1 TX 75019
Project: Ruby Road (ST 01-02)
Coppell, TX
Report No.: 178084
Project No.: 027176
Date of Service: 06/03/2003
Report Date: 06/10/2003
Services: Cylinder Collection
Report of Collection
On this date, a Rone Engineers, Ltd. representative arrived on site as scheduled
to pick up compressive strength test specimen cast prior to this date.
Technician Time: 10:45 a.m.
Page ! of 1
Technician: Richard Bullion
Report Distribution:
(1) City of Coppell
(1) Tiseo Paving Company
(1) Pacheco Koch
I.I) Wright Coastmc0on Company
- 12:00 p.m.
Ro~ Engineers, Ltd.
John Moody
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in qualiV,.,
(composition, appearance, performance, e c ) or any other feature of similar subjec matter provided by persons or conditions over which we have no control. Our leriers and
reports are for the exclusive use of the clients to ~horn the3 are addressed and shall not be reproduced except in fall without the wnnen approval of Rone Engineers, Ltd.
99DD Pa~e 1 of 1