Loading...
ST0102-LR030516RoneEngineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, IX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 IN-PLACE DENSITY TESTING Client: CiD' of Coppell Attn: Ms. Suzan Taylor - . PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Report No.: 176576 Project No.: 027176 Date of Service: 05/09/2003 Report Date: 05/16/2003 Services: perform In-Place Densi .ty Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Test Methods: ASTM D-2922 ASTM D-3017 Gauge: Troxler 3430 Gauge Serial No: 32685 Test Mode: DT Moisture Current: 639 Previous: 630 Standard Counts Density Current: 2957 Previous: 2964 M/D No. Dark Bro'aa~ Clay Description MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf 21.5 98.5 Project Requirements Moisture Density Optimum +4 95 mtn FIELD DENSITY TESTS TEST PROBE NO TESTLOCATION DEPTH MfD MOISTURE W~I DENSITY DRY DENSITY DENSITY NO. (%) ~c0 ~c0 (% max) Utility Backfill I 36" lateral, Ruby Road, Station 8+20, 3' 6" 1 23.7 115.7 below grade Utility Backfill 2 36" lateral, Ruby Road, Station 8+10, 1' 6" I 21.6 115.8 below' grade Test results on this report meet project specification. 93.5 95 95.2 97 Technician: Joe Jemigan Report Distribution: (i) City of Coppell (1) Tiseo Paving Company (1) Pacheco Koch (1) Wright Construction Company Started: 3:00pm .... Rone~}ngineers, Ltd. Finished: LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for Icsting We assume no responsibility for variation in quailD' (composition, appearance, performance, etc) or any other featare of similar subtect lqnatter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except m fulI withom the wmten approval of Roue Engineers, Ltd 07DD Page I of 1