Loading...
ST0102-LR030507RoneEngineers 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 IN-PLACE DENSITY TESTING Client: City of CoppelI Atto: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Report No.: 176321 Project No.: 027176 Date of Service: 05/06/2003 Report Date: 05/07/2003 Services: Perform In-Place Densi~ Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Test Methods: ASTM D-2922 ASTM D-3017 Gauge: Troxler 3430 Gauge Serial No: 32685 Test Mode: DT Moisture Current: 640 Previous: 638 Standard Counts Density Current: 2959 Previous: 2959 M/D No. 1 Description Dark Brown Clay MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf 21.5 98.5 Project Requirements Moisture Density Optimum +4 95 min FIELD DENSITY TESTS TEST NO PROBE TEST LOCATION DEPTH I~UD MOISTURE ~,YET DENSITY DRY DENSITY DENSITY No. (%) (pc0 (pcf) (% max) Utility Backfill 1 Storm drain, Line ST-3, Station 8+26, 2' 6" 1 23.8 122.2 below grade Utility Backfdl 2 Storm drain, Line ST-3, Station 8+00, 1' 6" 1 25.0 121.1 below grade Test results on this report meet project specification. 98.7 100 96.9 98 Technician: Joe Jemigan Report Distribution: ( I ) Cily of Coppell (1) Tiseo Paving Company ( I ) Pacheco Koch (1) Wright Construction Company Started: l:30pm Finished: 3:30p~~R~hgineers' Ltd' ~/ ~/ John Moody ,~ Project Manager LIMITATIONS: The test results presented herein v, ere prepared based upon the specific samples provided for testing We assume no responsibiIity for variation in quality. (composition, appearance, perfom~ance, etc ) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and repens are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in thll without the written approval of Rone Engineers, Ltd. 07DD Page I of 1