Loading...
ST0102-LR030502RoneEngineers 8908 Ambassador Ro'n, Dallas, TX 75247 2696 Gravel Drive, FortWorth, TX 76118 6300 Roth~ay, Ste. 150, ltouston, TX 7?040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Ciw of Coppell Attn:Ms. Suzan Taylor PO Box478 CoppellTX 75019 Project: Ruby Road (ST 01-02) Copp¢ll, TX Report No.: 174272 Project No.: 027176 Date of Service: 04/03/2003 Report Date: 05/02/2003 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast comprcssiYe strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST MEI'IIOD: CONTRACTOR: Tiseo Paving CONCRETE SUPPLIER: Iiseo PLANT: NA SPECIFICATION REQUIREMENTS 3000 psi ~J 28 Days 3"-6" 4% - 65/, ASTM C-172 ASTM C-31 ASTM C- 143 ASTM C-231 ASTM C-t064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 3 PLACEMENT DATE: 04/03/2003 V~EAIIIER CONDITIONS: Cloudy rimE SAMPLED: '10:30am BATCH TIME: 10:04am TEMPERATURE (F)- AIR 71 F CONCRETE: 72 E TRUCK NO: 141 TICKET NO: 240 AIR CONTENT (%): 4.8 UNIT WEIGH l' (Dcf): Nm_ O~%RALL PLACEMENT LOCATION: Paxing Ruby Road, westb¢:und lane SAMPLE LOCATION: Station 15+00 REPORT OF TE,qTS Concrete Compressive Cylinder 6" x 12" (area 2827 sq m.) CYLINDER MARKED SET NO. MEASURED M.4XTMUM COMPRESSIVE SLUMP DhTE AGE LOAD STRENGTH (inches) TESTED (days) (lbs. force) (psi) FRACTURE TYPE 3.0 3.0 3.0 3.0 04/08~2003 5 104550 3700 05/01/2003 28 143495 5070 05/01/2003 28 146170 5170 Average 5120 05/29/2003 56 Unbonded Cap Unbonded Cap Unbonded Cap Unbonded Cap Technician: Ken Stapleton Report Distribution: ( 1 ) City of ( oppell (1)/isco Paving Company (1) Pacheco Koch (1) WA gm Construction Company Started: 7:30am ll'45am Rone ngineers, Ltd. Finished: ./~~~j o Ihll Moody /./ Project Manager RoneEn ineers 8908 Ambassador Row, Dallas, TX 75247 2696 GravelDri~e, Fort Worth, TX 76118 6300 Roth*~ay, Ste. 150, ltouston~ TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppeli Attn: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Report No.: 174272 Project No.: 027176 Date of Service: 04/03/2003 Report Date: 05/02/2003 Services: Obtain samples of fi'esh concrete at the placement locations, perfor~n required field testing, cast compressive s~rength samples and bring samples back to the Iaborato~ for curing and testing in accordance with applicable standards. PROJECT DATA S [RENGTIt: SLUMP (in): AIR (%): TEST ME1 HOD: CONTRACTOR: Tiseo Paving CONCRETE SUPPLIER: Tiseo PLANT: NA SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 4% - 6% ASTM C-172 ASTM C~31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIXDESIGN I.D.: 3 PLACEMENT DATE: 04/03/2003 WEAIHER CONDITIONS: Cloudy TIME SAM~ED: 8:45am BATCH TIME: 8: 19am TEMPERATURE(F)-AIR 70 F CONCRETE: 75 F IRUCK NO: 142 IICKET NO: 2410 AIR CONTENT (%): 4.0 UNIT WEIGHT COCO: NA OVERALL PLACEMENT LOCATION: Paving-Ruby Road, westbound lane SAMPLE LOCATION: Station 11400 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 2827 sq. ~n.) CYLINDER MEASURED MAXIMUM COMPRESSIVE 5U~.RKED SLUMP DATE AGE LOAD STRENGIH FRACTURE SEI NO. (inches) TESTED (days) (Ihs. force) (psi) I'YPE 1 1 2.0 04/08/2003 5 108245 3830 Unbonded Cap 1 2 2.0 05/01/2003 28 133810 4730 Unbonded Cap 1 3 2.0 05/01/2003 28 144005 5090 Unbonded Cap Average 4910 1 4 2.0 05/29/2003 56 Unbonded Cap LIMITATIONS: The test results presented herein x~cre prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality (composit0m, appearance, performance, etc) or anv other lk'arure of similar sub/cot matter pro~idcd by persons or conditions o~cr xvaich we have no control Our letters and 01DK Page 1 of 2 RoneEngineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive. Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Co?pell Atto: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Report No.: 174136 Project No.: 027176 Date of Service: 04/02/2003 Report Date: 05/02/2003 Project: Ruby Road (ST 01-02) Coppell, TX Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratow for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CO','TRACTOR: Tiseo Paving CONCRETE SUPPLIER: Tiseo Paving PLANT: NA SPECIFICAIION REQUIREMENTS 3000 psi ~ 28 Days 4% - 6% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-I064 ASTM C-138 ASTM C-39 511XDESIGN I.D.: 3 PLACEMENT DATE: 04/02/2003 V,~EATItER CONDITIONS: ~unDy TIME SAMP~I~ED: 2:15pm BATCH TIME: l:22pm TEMPERATURE (F)-AIR 84 F CONCRETE: 69 F TRUCK NO: 145 TICKET NO: NA AIR CONTENT (%): 4.9 UNIT WEIGItT (pcf}: NA_ OVERALL PLACEMENT LOCATION: Paving RubyRoad, Station 13'65 toStation 1-08 SAMPLE LOCATION: Station 6e38 REPORT OF TESTS Concrete Co npress~;c Cshnder 6 x 12 lama ~8.-7 sq. in.) CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 1 1 4.25 I 2 4.25 1 3 4.25 i 4 4.25 DATE TESTED MAXIMUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) (lbs. force) (psi) TYPE 04/08,,2003 04/30/2003 04/'30/2003 6 98960 3500 Unbonded Cap 28 120290 4250 Unbonded Cap 28 121305 4290 Unbonded Cap Average 4270 05/28/'2003 56 Unbonded Cap Wa~er added a~ site: 5 gallons Technician: Jeremy Watts Report Distribution: (1) City of Coppell ( i ) Tiseo Paving Company ( ] ) Pachect~ Koch (i) Wright Construction Company Started: l:30pm Finished: 3:15pm~gineers, Ltd. /~/ ~/ John Moody Project Manager LIMITATIONS The test resuhs presented hcreln ~ere prepared based upon the specific samples proxidcd lbr testing. We assume no respop, sibiliur for vanation In quality 01DK Page I of 1