ST0102-LR030411RoneE gineers
8908 Ambassador Row
Dallas, Texas 75247
(214) 630-9745
(214) 630-9819 (fax)
REPORT OF CYLINDER COLLECTION
Client:
City of Coppell
Attn: Ms. Suzan Taylor
PO Box 478
Coppell TX 75019
Project: Ruby Road (ST 01-02)
Coppell, TX
Report No.: 174288
Project No.: 027176
Date of Service: 04/04/2003
Report Date: 04/11/2003
Services: Cylinder Collection
Report of Collection
On this date, a Rone Engineers, Ltd. representative arrived on site as scheduled
to pick up compressive strength test specimen cast prior to this date.
Technician Time:
Page 1 of 1
Technician: Kent Reiser
Report Distribution:
(1) City of CoppclI
(1) Tiseo Paving Company
( 1 ) Pacheco Koch
(1) Wright Construction Company
11:30 a.m.
- 12:45 p.m.
Rone Engineers, Ltd.
John Moody
Project Manager
LIMITATIONS: The test results presented herein v, ere prepared based upon the specific samples provided for testing We assume no responsibi iT for variation in qualit>,
(composition, appearance, performance, etc ) or any other feature of similar subject matt:r provided b) persons or conditions o~er which v,e haxe no control Our fetters al/d
reports ale for the exclusive use of the clients to whom the)' are address~-d and shall not bc rcprodt~ccd except m Full without the written approval of Rone Engineers, Ltd
Ron eEngineers
8908 Ambassador Raw
Dallas, Texas 75247
(214) 630-9745
(214) 630-9819 (fax)
REPORT OF CYLINDER COLLECTION
Client:
City of CoppelI
Attn: Ms. Suzan Taylor
PO Box 478
Coppell TX 75019
Project: Ruby Road (ST 01-02)
Coppe]l, TX
Report No.: 174499
Project No.: 027176
Date of Service: 04/09/2003
Report Date: 04/11/2003
Services: Cylinder Collection
Report of Collection
On this date, a Rone Engineers, Ltd. representative arrived on site as scheduled
to pick up compressive strength test specimen cast prior to this date.
Technician Time: 10:O0 a.m. - 11:15 a.m.
Page 1 of i
Technician: Richard Bullion
Report Distribution:
(1) City of Coppell
(1) Tiseo Paving Company
(1) Pacheco Koch
( 1 ) Wright Construction Company
Rone Engineers, Ltd.
John Moody
Project Manager
LIMIT~.TIONS The test results presenled herein were prepared based upon the specific samples provided for testing We assume no responsibility lbr variation in quali~'
(composition, appearance, per fnrmance, etc) c*r any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and
reports are Ibr the exclusive use of the clients to 'Mmm the), are addressed and shalI not bc repraduced except in t'ull wkhout the written approval of Rone Engineers, Ltd.