Loading...
ST0102-LR030327Ro gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) REPORT OF PULVERIZATION/GRADATION TESTING Client: City of Coppell Arm: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Report No.: 173194 Project No.: 027176 Date of Service: 03/21/2003 Report Date: 03/27/2003 Services: PulverizatiordGradation Testing Report of Testing On this date, a Eone Engineers, Ltd. representative(s) was on site to perform Pulverization/Gradation Testing. The results are attached. Technician Time: Page 1 of 2 Technician: Joe Jemigan Report Distribution: (I) City of Coppell (l) Tis¢o Paving Company (I) Pacheco Koch ( 1 ) Wright Construction Company 10:00 a.m. - 12:30 p.m. ~ngineers, Ltd. LIMITATIONS: The test results presented herein were prepared based upon thc specific samples provided for testing We assume no responsibility for variation ~n quail%' (composition, appearance, per[bnnance, etc ) or any other tbamre of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports arc lbr the exclusive use of the clients to whotn they are addressed anti shall not be reproduced except in ~tll without the written approval of Ronc Engineers, Ltd 99DD Page I of 1 Ro gineers REPORT OF GRADATIONS OF LIME TREATED SOILS Client: City of Coppell Report No.: 173194 Project No.: 027176 Date of Service 3/21/2003 Project: Ruby Road Page 2 of 2 Tiseo Paving Specifications: 100% passing 1 3/4" sieve 60% passing ~ fl4 sieve A B J C D E Location WeightI Percent Weight Percent Sample Retained Passing Retained Passing Weight 1 3/4" Sieve 1 3/4" Sieve fl-4 Sieve ¢/A Sieve I Ruby Road, Station 2+00, left of centerline 11.4 0 100% 3.3 71.0% 2 Ruby Road, Station 5+00, centedine 12.1 0 100% 3.1 74.3% 3 Ruby Road, Station 8+00, right of centerline 11.3 0 100% 2.8 75.2% 4 5 6 7 8 9 10 Additional Comments: Client/Contractor Copied with results: A = Total Sample Weight B = Weight Retained 1 3/4" C = Percent Passing D = Weight Retained 3/4" E = Percent Passing Formula for Percent Passing 1 3/4" C=(A - B) / (A x 100) Formula for Percent Passing 314" E=(A - D) / (A x 100) Example: (9.4 lb - 2.81b = 6.6[b) (6.6 lb / 9.4th = 0.702 x 100 = 70.21b) A B C