Loading...
ST0102-LR030225RoneEng!neers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: City of Coppell Arm: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Services: Per/brm In-Place Density Test in accordance with ASTM Standards. Report No.: 170952 Project No.: 027176 Date of Service: 02/18/2003 Report Date: 02/25/2003 PROJECT DATA CONTRACTOR: Tiseo Paving Test Methods: ASTM D-2922 ASTM D-3017 Gauge: Trox!er 3430 Gauge Serial No: 31530 Test Mode: DT Moisture Current: 664 Previous: 674 Standard Counts Density Current: 2595 Previous: 2634 M/D No. I Description MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Dark Brown TaD Sandy Clay 20.5 102.0 Project Requirements Moisture Density Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE NO TEST LOCATION DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pc0 (pcb (% max) Utility Backfill Storm sewer, station 11+00, North side, 2' 6" l 21.9 122.3 below Utility Backfill Storm sewer, station 11+00, South side, 2' 6" 1 22.4 119.6 below Test results on this report meet project specification. 100.3 98 97.7 96 Technician: Chris Webber Report Distribution: (1) City of Coppel[ (1) Tiseo Paving Company (1) Pacheco Koch (1) Wright Construction Company Started: l:15p Finished: 2:45p//~~ngineers' Ltd. ~/' ~// ~ JohnMoody ~// ~' Project Manager LIMITA'I IONS: The test results presented herein were prepared based upon tbe specific samples provided tbr testing We assmne no responsibility lbr variation in quality (composition, appearance, performance, etc) or any other lbature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in tull without the written approval of Rone Engineers, Ltd 07DD Page 1 of 1