Loading...
ST0102-LR030224RoneEn gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) REPORT OF CYLINDER COLLECTION Client: City of Coppell Attn: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Report No.: 170604 Project No.: 027176 Date of Service: 02/12/2003 Report Date: 02/24/2003 Services: Cylinder Collection Report of Collection On this date, a Rone Engineers, Ltd. representative arrived on site as scheduled to pick up compressive strength test specimen cast prior to this date. Technician Time: Page 1 of 1 Technician: Joe Jemigan Report Distribution: (1) City of Coppell (1) Tiseo Paving Company (1) Pacheco Koch (1) Wright Construction Company 12:00 p.m. - 1:30 p.m. CEngineers, Ltd. John Moody Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Pat~e I of 1 Ro gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (2141630-9745 (2141630-9819 (fax/ IN-PLACE DENSITY TESTING Client: City of Coppel! Attn: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-021 Coppell, TX Report No.: 171059 Project No.: 027176 Date of Service: 02/19/2003 Report Date: 02/24/2003 Services: Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Test i'vlethods: ASTM D-2922 ASTM D-3017 Gauge: Troxler 3430 Gauge Serial No: 31580 Test Mode: DT Moisture Current: 683 Previous: 664 M/D No. I Description MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Dark Brown Tan Sandy Clay Standard Counts Density Current: 2596 Previous: 2595 Project Requirements Moisture Density 20.5 102.0 Optimum +4 95 min FIELD DENSITY TESTS TEST NO PROBE TESTLOCATION DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO. (%) ~cO ~CQ (% max) Utility Backfill Retest of test #3 from report #169812 6" 1 18.9' 121.6 102.3 An asterisk (*) appears next to test results which do NOT meet the project specifications. 100 Technician: Chris Webber Report Distribution: (11 City of Coppell (11 Tiseo Paving Company (11 Pacheco Koch (11 Wright Constraction Company Started: l:15pm Finished: 2: ~,~//Je~ '45pm ~ R(~'rt~Engineers' Ltd. // / John Moody /~ / Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibiliw for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fall without the written approval of Rone Engineers, Ltd. 07DK Page 1 of 1