Loading...
ST0102-LR030207 gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: City of Coppell At[n: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Services: Perform Tn-Place Density Test in accordance with ASTM Standards. Report No.: 169480 Project No.: 027176 Date of Service: 01/28/2003 Report Date: 02/07/2003 PROJECT DATA CONTRACTOR: Tiseo Paving Test Methods: ASTM D-2922 ASTM D-3017 Standard Counts Gauge: Troxler 3430 Moisture Density Gauge Serial No: 33305 Current: 554 Current: 2515 'rest Mode: DT Previous: 556 Previous: 2744 M/D No. Description MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Project Requirements Moisture Density 1 Dark Brown Tan Sandy Clay 20.5 102.0 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE NO TEST LOCATION DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pcf} (pc0 (% max) Paving Fill 1 Ruby Road, station 11 +50, North of 6" I 23.8 120.7 97.5 96 centerline, 3' below grade Paving Fill ' 3' 6" 2 Ruby Road, station 11+50, centerhne, 1 28.1 * 116.7 91.I 89 * below grade Paving Fill 3 Ruby Road, station 11+25, South of 6" 1 20.5 120.0 99.6 98 centerline, 3' below grade An asterisk (*) appears next to test results which do NOT meet the project specifications. Technician: Scott Fagan Report Distribution: (1) City of Coppell (1) Tiseo Paving Company (1) Pacheco Koch (1) Wright Construction Company Started: 7:30a Finished: 9:30a nglneers, ~/, / x.._ John Moody Project Manager ! Ltd. LIMITATIONS: Tile test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our [eners and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fldl without the written approval of Rone Engineers, Ltd 07DD Page I of 1 gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9742 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: City of Coppell Attn: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Report No.: 169395 Project No.: 027176 Date of Service: 01/27/2003 Report Date: 02/07/2003 Services: Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Test Methods: ASTM D-2922 ASTM D-3017 Standard Counts Gauge: Trox'~er 3430 Moisture Density Gauge Serial No: 33305 Current: 553 Current: 2744 Test Mode: DT Previous: 556 Previous: 2759 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Dark Brown Clay w/Traces of Gravel 21.5 102.0 Optimum +4 95 min 2 Medium Brown Sandy Clay w/Gravel 15.5 112.0 Optimum +4 95 min FIELD DENSITY TESTS TESI' PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTIt No. (%) (pcb (pcl) (% max) Paving Fill 1 Ruby Road, station 11+50, North of 6" 1 22.9 123.4 100.4 98 centerline, 5' below grade Paving Fill 2 Ruby Road, station 11+50, centerline, 5' 6" I 22.4 122.2 99.8 98 below grade Paving Fill 3 Ruby Road, station 11+12, South of 6" I 21.8 125.1 102.7 101 centerline, 5' below grade Paving Fill 4 Ruby Road, station 10+50, South of 6" 2 15.9 129.2 111.5 100 centerline, 3' below grade LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation ia quality (composi0on, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over whicb we have no control Our letters and reports are 1hr the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Roue Engineers, Ltd. 07DD Page I of 2 Report No.: 169395 RoneEngineers Project No.: 027176 Client: City of Coppell ................... al Test results on this report meet project specification. Technician: Scott Fagan Report Distribution: (I) City of Coppell (1) Tiseo Paving Company (1) Pacheco Koch (1) Wright Construction Company Started: 10:lSa Finished: 12:00p~/~gineers, Ltd. John Moody Project Manager LIMII'ATIONS: The test results presented herein were prepared based upon the specific samples provided for tcsting We assume no responsibility lbr variation in quality (composition, appearance, performance, etc.) or any other I'cature of similar subject matter provided by persons or conditions over wbicb we bave no control Our lelters and reports are tbr the exclusive use of the clients to wbom they are addressed and shall not be reproduced except in fidl without thc written approval of Rone Engiueers, Ltd 07DD Page2 of 2 Ron eEngineers 8908 Ambassador Row Dallas, Texas 7524%4510 (214) 630-974S (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: City of Coppell Attn: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Report No.: 169385 Project No.: 027176 Date of Service: 01/27/2003 Report Date: 02/07/2003 Services: Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Test Methods: ASTM D-2922 ASTM D-3017 Gauge: Troxler 3430 Gauge Serial No: 33305 Test Mode: DT Moisture Carrent: 553 Previous: 556 Standard Counts Density Current: 2744 Previous: 2759 M/D No. Description MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Medium Brown Sandy Clay w/Gravel 15.5 112.0 Project Requirements Moisture Densiiy Optimum +4 95 min FIELD DENSITY TESTS PROBE DEPTII M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pcb (peg) (% max) TEST NO TEST LOCATION Paving Fill Ruby Road, station 11+50, North of centerline, 6' below grade Paving Fill 2 Ruby Road, station 11+50, centerline, below grade Paving Fill 3 Ruby Road, station 11+25, South of centerline, 6' below grade 6~ 6" 1 17.9 130.3 110.5 99 6" I 16.7 12'7.2 109.0 97 6" 1 17.7 128.3 109.0 97 Test results on this report meet project specification. Technician: Scot~ Fagan Report Distribution: (1) City of Coppcll (1) Tiseo Paving Company (1) Pacheco Koch (1) Wright Construcfion Company Started: 7:30a Finished: 9:15a~~~ngineers' Ltd. ~/ / John Moody / Prqject Manager LIMITATIONS: Tile test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation m qualit,/ (composition, appearance, per fonnance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are tbr Ibc exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd 07DD Page I of I RoneEng!neers 8908 Ambassador Row Dallas, Texas 7524%4510 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: City of Coppel[ Attn: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Report No.: 169291 Project No.: 027176 Date of Service: 01/24/2003 Report Date: 02/07/2003 Services: Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Test Methods: ASTM D-2922 ASTM D-3017 Gauge: Troxler 3430 Gauge Serial No: 32687 Test Mode: DT Moisture Current: 670 Previous: 662 Standard Counts Density Current: 2943 Previous: 2978 M/D No. Description MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Medium Brown Sandy Clay w/Gravel 15.5 112.0 Projec! Requirements Moisture Density Optimum +4 95 min 2 Dark Brown Clay w/Traces of Gravel 21.5 102.0 Optimum +4 95 rain 3 [)ark Brown Clay 21.5 98.5 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE NO TEST LOCATION DEPTH Utilities 1 Storm drain, Line 2, Station 10+25, 2' 6" below grade Utilities 2 Storm drain, Line 2, Station 9+25, 2' below 6" grade Utilities 3 Storm drain, Line 2, Station 6+60, 2' below 6" grade M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pc0 (pc0 (% max) 1 18.0 124.1 105.2 94* 1 17.8 121.2 102.9 92 * 2 19.2' 121.0 101.5 100 LIMITATIONS: Tbe test results presented herein were prepared based upon tbc specific samples provided for testing We assume no responsibility fi~r variation in quality (composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are Ibr the exclusive use of the clients to whom they are addressed and shall not be ~eproduced except in lhll without thc written approval ot'Rone Engineers, 07DK Page I of 2 Report No.: 169291 RoneEn~gine~ers Project No.: 027176 Client: City of Coppell TEST PROBE NO TEST LOCATION DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSrI'Y No. (%) (pcf) (pcO (% max) Utilities 4 Storm drain, Line 2, Station 5+40, 2' below 6" 2 21.6 118.2 97.2 grade Utilities 5 8" waterline, Station 3+l 5, 2' below grade 6" 3 23.5 114.2 92.5 An asterisk (*) appears next to test results which do NOT meet the project specifications. 95 94* Technician: Marshall Knox Report Distribution: ( 1 ) City of Coppell (1) Tiseo Paving Company (I) Dacbeco Koch (1) Wright Construction Company Started: 10:15a Finished:12 00~A~ngineers' Ltd ~/ / "~ JohnMoody Project Manager LIMITATIONS: The test results presented hereto were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in qualit} (compos o , appearance, pc~ formance, etc.) or ally other fca ute of similar subject matter provided by persons or conditions over wh ch we have no control Our letters and reports are for thc exclusive use of'the clients to whom they are addressed and shall not be r. eproduced except in fidl wdbout tile written approval of Roue Engineers. Ltd 07DK Page 2 of 2