Loading...
ST0102-LR030204Ro gineers 8908 Ambassador Row Dallas, Texas 75247 4510 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: City of Coppell Attn: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Report No.: 168813 Project No.: 027176 Date of Service: 01/16/2003 Report Date: 02/04/2003 Services: Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: q,'i~;eo Paving Test Methods: ASTM D-2922 ASTM D-3017 Standard Counts Gauge: Troxler 3430 Moisture Density Gauge Serial No: 24324 Current: 550 Current: 2283 Test Mode: DT Previnus: 581 Previous: 2285 MOISTURE DENSITY RELATIONS Maximum Project Requiremeuts M/D No. Description Moisture % Density pcf Moistm'e Density 1 Medium Brown Sandy Clay w/Gravel 15.5 112.0 Optimum +4 95 mtn 2 Dark Brown Clay w/Traces of Gravel 21.5 102.0 Optimum +4 95 mtn FIELD DENSITY TESTS TEST PROBE NO TEST LOCATION DEPTH M/D MOIS'IURE WET DENSITY DRY DENSITY DENSITY No. (%) (pcf} (pcO (% max) General Fill i Station 11+00, south right-of-way, 7' below 6" 2 23.5 124.9 101.1 99 grade General Fill 2 Station 11+25, north right-of-way, 8' below 6" 2 22.2 127.9 104.7 103 grade General Fill 3 Station 10--50, north right-of-way, 6' below 6" 1 18.5 127.6 107.7 96 grade Test results on this report meet project specification. Density tests over 102% may be due to over compaction. LIMITATIONS The test results presented hereto were prepared based upon the specific samples provided for testing We assume no responsibility lbr variation in quality (composition, appearance, perfbrmance, otc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for file exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without thc written approval of Rone Engineers, Itd 07DF Page 1 of 2