ST0102-LR0301301~4 i4 03 q · 13:16 FAX 21463(19819
Client:
City of Coppell
Arm: Ms. Suzan Taylor
PO Box 478
Coppell IX 7.5019
Project: Ruby Road (ST 01-02)
Coppell, TX
LEIGH ENGINEERING
[~] 003
MOISTURE DENSITY REI ATIONS
Report No.: 169434
Project No.: 027176
Date of Service: 01/28/2003
Report Date: 01/30/2003
Services; Obtain a sample of material from thc jobs/re, bring the sample hack to thc laboratory and perform a moisture density relahonship test m
accordance ~th ASTM Standards.
PROJECT DATA
CO,NIP. ACTOR: Tiseo Paving
rEST FOR: Paving Subgrade
MATEP. LaL: Daxk Brown Tan Sandy Clay
CL~ssrHCAT~O.~: Paving Subgrade
TEST ~¥1E'I'HOD: ASTM D-698 ASTM D-4318
Method A
DATE SAMPLED: 01/28/2003
MATI~RIAL PRI~PARATION: Moist
P. xtw. mEa TreE: Mechanical
SAMI'LED BY: S.Fagan
SAMPLE LOCAHON: Ruby Road, Station 11+50
REPORT OF TEST
IVI~XXTMIlM DRY DENSITY, pcf: 102.0
OPTLMI~] MOISTURE CONq'ENT, %: 20.5
LIQUID LL%flT: 60
PLASTIC LiMTT: 17
PLA STICITY I.N1)EX: 43
MOISTURE DEN$1T¥ RELATIONS
. Specific Ch-am ~ 2.60
102
100
Density
(peO
15 17 19 21 23 25 27
MOISI'URIi; CONTENT (%)
Teclmieian: $00~ Fagan
Report Distribution:
(!) City &Coppe, U
(I) Tisco Paxa,ng Company
(I) ?acheco Koch
(I) Wright COUStYUCbOn Company
one En ' eers, Ltd.
ood y
Project Ma.n%er
a6 Page 1 of I