Loading...
ST0102-LR0301301~4 i4 03 q · 13:16 FAX 21463(19819 Client: City of Coppell Arm: Ms. Suzan Taylor PO Box 478 Coppell IX 7.5019 Project: Ruby Road (ST 01-02) Coppell, TX LEIGH ENGINEERING [~] 003 MOISTURE DENSITY REI ATIONS Report No.: 169434 Project No.: 027176 Date of Service: 01/28/2003 Report Date: 01/30/2003 Services; Obtain a sample of material from thc jobs/re, bring the sample hack to thc laboratory and perform a moisture density relahonship test m accordance ~th ASTM Standards. PROJECT DATA CO,NIP. ACTOR: Tiseo Paving rEST FOR: Paving Subgrade MATEP. LaL: Daxk Brown Tan Sandy Clay CL~ssrHCAT~O.~: Paving Subgrade TEST ~¥1E'I'HOD: ASTM D-698 ASTM D-4318 Method A DATE SAMPLED: 01/28/2003 MATI~RIAL PRI~PARATION: Moist P. xtw. mEa TreE: Mechanical SAMI'LED BY: S.Fagan SAMPLE LOCAHON: Ruby Road, Station 11+50 REPORT OF TEST IVI~XXTMIlM DRY DENSITY, pcf: 102.0 OPTLMI~] MOISTURE CONq'ENT, %: 20.5 LIQUID LL%flT: 60 PLASTIC LiMTT: 17 PLA STICITY I.N1)EX: 43 MOISTURE DEN$1T¥ RELATIONS . Specific Ch-am ~ 2.60 102 100 Density (peO 15 17 19 21 23 25 27 MOISI'URIi; CONTENT (%) Teclmieian: $00~ Fagan Report Distribution: (!) City &Coppe, U (I) Tisco Paxa,ng Company (I) ?acheco Koch (I) Wright COUStYUCbOn Company one En ' eers, Ltd. ood y Project Ma.n%er a6 Page 1 of I