Loading...
ST0102-LR0301228908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) REPORT OF IN-PLACE DENSITY TESTING CANCELLATION Client: City of Coppell Atto: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Report No.: 168833 Project No.: 027176 Date of Service: 01/16/2003 Report Date: 01/22/2003 Services: In-Place Density Testing Cancellation Report of Cancellation On this date, a Rone Engineers, Ltd. representative arrived on site as scheduled to perform In-Place Density Testing. Upon arrival, the technician was informed of job cancellation due to contractor not being ready. Technician Time: 1:30 pm to 4:30 pm Page 1 of 1 Technician: Jesse Landreth Report Distribution: (1) City of Coppell (l) Tiseo Paving Company (1) Pacheco Koch (l) Wright Construction Company /Johngineers, Ltd. n Moody Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any od~er lbamrc of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99CM Pa~e 1 of I Ro gineers 8908 Ambassador Row Dallas, Texas 75247~4510 (214) 630-9745 (214) 630-9819 (lax) IN-PLACE DENSITY TESTING Client: City of Coppell Attn: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Report No.: 168509 Project No.: 027176 Date of Service: 01/10/2003 Report Date: 01/22/2003 Services: Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA CON~IRACTOR: Tiseo Paving Test Methods: ASTM D-2922 ASTM D-3017 M/D No. Description Gauge: Troxler 3430 Gauge Serial No: 25249 Test Mode: DT Moisture Current: 643 Previous: 644 MOISTURE DENSITY RELATIONS Maximum Moisture % Density per Standard Counts Density Current: 2548 Previous: 2537 Project Requirements Moisture Density Medium Brown Sandy Clay w/Gravel 15.5 112.0 Optimum +5 95 min FIELD DENSITY TESTS TEST NO TEST LOCATION Utility Backfill 54" storm drain, station 3+50, 4' below grade Utility Backfill 2 54" storm drain, station 3+00, 3' below grade Utility Backfill 3 54" storm drain, station 2+50, 3' below grade Utility Backfill 4 54" storm drain, station 2+00, 2' below grade Utility Backfill PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY DEPTH No. (%) (pc0 (pcO (% max) 6" 1 17.5 125.0 106.4 95 6" 1 15.6 123.3 106.7 95 6" I 19.6 128.1 107.1 96 6" 1 19.0 130.1 109.3 98 07DF Page I of 2 Report No.: 168509 RoneEngineers Project No.: 027176 Client: City of Coppell m's~nnn~/ TEST NO I'EST LOCATION PROBE M/D MOISTERE WET DENSITY DRY DENSITY DENSITY DEPTH No. (%) (pcf) (pc0 (% max) 54" storm drain, station 1+50, 3' below 6" 1 14.3' I26.8 110.9 grade An asterisk (*) appears next to test results which do NOT meet the project specifications. 99 Technician: Jarrod Miller Report Distribution: (I) City of Coppell (1) Tiseo Paving Company (1) Pacheco Koch (1) Wright Construction Company Started: 12:15P Finished: 2:00PM~.~/~ngineers~ Ltd. // / --John Moody y / Project Manager LIMITATIONS: Thc test results presented herein were prepared based upon thc specific samples provided tbr testing. We assume no responsibility Ibr variation in quality (composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except m thll without the written approval of Rone Engineers, Ltd 07DF Page 2 of 2 Ro gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214} 630-9819 (fax} IN-PLACE DENSITY TESTING Client: City of Coppell Atto: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Report No.: 168670 Project No.: 027176 Date of Service: 01/14/2003 Report Date: 01/22/2003 Services: Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Test Methods: ASTM D-2922 ASTM D-3017 Standard Counts Density Current: 2285 Previous: 2291 Gauge: Troxler-3430 Moisture Gauge Serial No: 24324 Current: 586 Test Mode: DT Previous: 589 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Dark Brown Clay 21.5 98.5 Optimum +4 95 min 2 Medium Brown Sandy Clay w/Gravel 15.5 112.0 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE NO TEST LOCATION DEPTH M/D MOISTURE WET DENSITY DRYDENSITY DENSITY No. (%) (pc0 (pef) (% max) Paving Fill 1 Station 11+00, 8' below grade 6" 1 22.9 119.7 97.4 99 Paving Fill 2 Station 10+60, 7' below grade 6" 2 17.2 128.0 109.2 98 Paving Fill 3 Station 9+90, 6' below grade 6" 2 18.3 130.7 110.5 99 Test results on this report meet project specification. Technician: Jason Astiz Report Distribution: (1) City of Coppell (1) Tiseo Paving Company (1) Pacheco Koch (1) Wright Construction Company Started: ll:15a Finished: 1:00p/~/~ngineers' /// // Jolm Moody ~' ~/ Project Manager Ltd. LIMITATIONS: The test results presented heroin were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject maaer provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fall without the written approval of Rone Engineers, Ltd. 07CM Page 1 of I