Loading...
ST0102-LR030106RoneEngineers 8908 Ambassador Row Dallas, Texas 7524%4510 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: City of Coppell Attn: Ms. Suzan Taylor PO Box 47g Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Services: Perform In-Place Density Test in accordance with ASTM Standards. Report No.: 167021 Project No.: 027176 Date of Service: 12/27/2002 Report Date: 01/06/2003 PROJECT DATA CONTRACTOR: Tiseo Paving Test Methods: ASTM D-2922 ASTM D-3017 M/D No. Description Gauge: Troxler 3430 Moisture Gauge Serial No: 32719 Current: 642 Test Mode: DT Previous: 640 MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Standard Counts Density Current: 2962 Previous: 2980 Project Requirements Moisture Density 1 Medium Brown Sandy Clay w/Gravel 15.5 112.0 Optimum +4 95 min FIEI,D DENSITY TESTS TEST NO TEST LOCATION PROBE DEPTH M~ MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) OeO ~c~ (% mad Backfill 1 Sanitary sewer, Line SS-l, Station 5+50, 2' below grade Backfill 2 Sanitary sewer, Line SSrl, Station 5+50, final Backfill 3 Sanitary sewer, Line SS-l, Station 7+00, 2' below grade Backfill 4 Sanitary sewer, Line SS-l, Station 7+00, final Technician: David Putman, AET Report Distribution: (1) City of Coppell (l) Tiseo Paving Company (l) Pacheco Koch (t) Wright Construction Company 6" 1 16.4 131.0 112.5 6" 1 16.2 129.8 111.7 6" 1 19.2 128.3 107.6 6" 1 19.0 128.9 108.3 100 100 96 97 Started: 9:30am Finished: ll:30a Ro rs John Moody Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of sirnilar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 07DK Page 1 of 1