Loading...
ST0102-LR021226Ro gineers ', ~ Dallas, Texas 75247-4510 (214) 63{I-9745 {214) 630-9819 (fax) MOISTURE DENSITY RELATIONS Client: City of Coppell Attn: Ms. Suzan Taylor PO Box 478 Coppell TX 75019 Project: Ruby Road (ST 01-02) Coppell, TX Services: Report No.: 166818 Project No.: 027176 Date of Service: 12/19/2002 Report Date: 12/26/2002 Obtain a sample of material from the jobsitc, bring the sample back to the laboratory and perform a moisture density relationship test in accordance with ASTM Standards. PROJECT DATA CONTRAC1 OR: Tiseo Paving TEST EOR: General Fill MATERIAE: Dark Brown Clay CLASSIFICATION: General Fill TEST METIIOD: ASTM D-698 Method A ASTM D-4318 DATE SAMPLED: ! 2/19/2002 MATERIAL PREPARATION: Moist RAMMER TYPE: Mechanical SAMPLED BY: Joe Jemigan SAMPEE LOCATION: West end of Ruby Rd. REPORT OF TEST MAXIMUM DRY DENSITY, pek 98.5 OPTIMUM MOISTURE CONTENT, %: IAQUID EIMIT: 59 PEASTIC LIMIT: 20 PLASTICITY INDEX: 39 21.5 Dry Densiiy (pcO MOISTURE DENSITY RELATIONS 103 99 17 19 21 23 25 27 29 MOISTURE CONTENT (%) Technician: Joe Jernigan Report Distribution: (1) City of Coppell (1) Tiseo Paving Company (1) Pacheco Koch (I) Wright Construction Company //~R0~ne Engineers, Inc. /f~'/' /// "- John Moody ,~' Project Manager 06 Page I of 1