ST0102-CS030507T H E · C I T Y ' 0 F
P.O. Box 478
255 Parkway Blvd
Coppell, TX 75019
Phone: (972)304-3679
Fax: (972)304-7041
ENGINEERING DEPARTMENT
FAX COVER SHEET
To: Lou~,Tiseo / Rober~ Caudill From: Larry Davis
Fax: 972-216-5637 Date: May7, 2003
~h~,~: Pages: 2 (including cover sheet)
Re: Ruby Road ST 01-02 cc:
[] Urgent [] For Review [] Please Comment [] Please Reply [] As Requested
,Comments:
It appears that the subcontractor is using a different joint gasket material for the 24"
storm drain lateral line that connects to the 36" storm drain. The joint material
connecting the 36" to the 24" is omniflex, however it appears that the joint material on
the 24' is ram neck. Please contact me at 972-304-3684 to discuss.
IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679
"City of Coppell Engineering - Excellence By Destg
Measurement and Payment shall be made on the basis of the bid quantity and contract price
per square yard (SY), and will be total compensation for furnishing all labor, materials
(including watering) and equipment necessary to complete the work. In other words, 8032 SY
is the exact quantity that will be paid for this item (unless the City reduces the area to be
hydromulched prior to the work commencing). Any areas disturbed outside the areas shown
on the plans shall be hydromulched at the contractors expense.
2.18. Pay Items #18 Compacted Fill:
This item will include the placement and compaction of fill required for this project. Fill will
be placed and compacted (minimum 95% of maximum dry density) in accordance with
geotechnical report, City of Coppell, and NTCOG standards and recommendations.
Measurement and Payment shall be made on the basis of the price per cubic yard (CY) and
will be total compensation for furnishing all labor, materials and equipment necessary to
complete the work.
2.19. Pay Items #19, 20, 21, 22, 23, 24 & 25 Various sizes of Class III & IV RCP's:
This work shall include the placement of all Class III and Class IV RCP, embedment, and
required connections. Joint omniflex material shall be used for all joints and all fittings shall
be prefab stabilized sand shall be used for embedment and backfill to the top of the pipe for
all Class IV RCP. Pipe will be placed in accordance with City of Coppell standards, and
NTCOG standards.
Measurement and Payment shall be made on the basis of the price per linear foot (LF) and
shall be total compensation for furnishing all labor, materials, and equipment necessary to
complete the work.
2.20. Pay Items #26 48" Type "B" Headwall:
This work shall include the placement of two 48" Type "B" headwalls. Said headwalls will
be placed in accordance with City of Coppell standards, and NTCOG standards.
Measurement and Payment shall be made on the basis of the price per each (EA) and shall be
total compensation for furnishing ail labor, materials, and equipment necessmy to complete
the work.
2.21. Pay Items #27 Double 12" Type "C" Headwall:
This work shall include the placement of a Type "C" headwall at both ends of the double 12"
RCP at Coppell Road. Said headwalls will be placed in accordance with City of Coppell
standards, and NTCOG standards.
Measurement and payment shall be made on the basis of the price per each (EA) and shall be
total compensation for furnishing all labor, materials, and equipment necessary to complete
the work.
2.22. Pay Items # 28 Grouted Rock-Rip-Rap:
5-6 Description of Pay lten~