Loading...
ST9902-CS040720Page 1 of 1 Suzan Taylor - Sandy Lake Road From: To: Date: Subject: Suzan Taylor .~Norman. RB_PO.Central@dallascounty.org 7/20/2004 2:23 PM Sandy Lake Road Janet: I have completed the scoping sheets. I had previously submitted these to David NcSwain, but there have been some changes that are reflected in the attached document. The engineer for the project submitted a cost estimate in April 2004. The estimated cost for the construction of this section of Sandy Lake is $5,538,725. Dallas County will participate in the construction cost in the amount of $1,300,000. Dallas County funds will not be available until October 2006. The construction of the project is scheduled to start in June 2007. file://C:~Documents%20and%20Settings\staylor~Local%20Settings\Temp\GW} 00001 .HTM 7/20/2004 ATTACHMENT A Supplemental Agreement to Master Agreement Governing Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B Date: 07-20-04 PROJECT LENGTH: _+5786' PAVEMENT AND ALIGNMENT TOPICS PAVEMENT SECTION PAV1NG DESIGN CRITERIA: City of Coppell Construction Design Standards North Central Texas Council of Governments Standard Specifications for Public Works ROW WIDTH: Existing: Varies from 55' to 120' Proposed: 90' Minimum PAVEMENT WIDTH: Existing: 24~' Proposed: 66' (4 lanes ~ 12.5' + 16' median) No. of lanes proposed: 4-Lane Divided PARKWAY: Proposed Width: 12' minimum Proposed Sidewalk Width: 5' sidewalks & 8' hike and bike trail Parkway cross fall slope maximum: 3" per foot GRADE REQUIREMENTS: Is TC 6" below adjacent ground criteria to be followed? N~o Any deep cuts, high fills ? Yes PAVEMENT CROSS FALL PROPOSED; ¼" per foot MiNIMUM: ¼" per foot MAXIMUM: ¼ "per foot 07/12/2004 draft 9 ATTACHMENT A Supplemental Agreement to Master Agreement Governing Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B VERTICAL GRADE: MINIMUM: 0.5% MAXIMUM: 5.13% CENTERL1NE ALIGNMENT POSITION: IN CENTER OF EXISTING ROW ? N~o OFFSET FROM CENTER: Varies ON BRAND NEW ALIGNMENT? N~o LEFT TURN LANES: 15 left turn lanes M1NIMUM LENGTH: 155.5' MIN1MUM STORAGE: 60_~' WIDTH: 11~' ANY DUAL LEFT TURN LANES? N~o ANY FREE RIGHT TURN LANES? Yes (Denton Tap/Sandy Lake Road Intersection) CRASH CUSHIONS / ATTENTUATORS INVOLVED: N~o RAILROAD CROSSINGS INVOLVED: No 07/12/2004dra~ 9 ATTACHMENT A Supplemental Agreement to Master Agreement Governing Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B PAVEMENT STRUCTURE DESIGN WHEEL LOAD: 18 kip single axle load BUS AND HEAVY TRUCK TRAFFIC: YES X NO ROADWAY CLASSIFICATION: Major arterial MINIMUM PAVEMENT STRUCTURE THICKNESS: 8'~' MINIMUM PAVEMENT BASE OR SUBGRADE THICKNESS: 8'-- DESIGN SPEED: S. intersection POSTED SPEED: 35 MPH MEDIANS MEDIAN WIDTH: 16~' ANY MID BLOCK OPENINGS TO CONSIDER? 50 MPH (40 MPH (& Coppell Road N. intersection and 45 MPH (&Coppell ANY SIDE STREETS TOO CLOSE FOR OPENING? (Oak Trail & Georgian Drive) YES NO YES NO 11' minimum & 12' maximum STANDARD TURN LANE WIDTH: X X STANDARD NOSE WIDTH: 6-- 07/12/2004 draft 9 ATTACHMENT A Supplemental Agreement to Master Agreement Governing Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B DRIVEWAYS: MAXIMIMUM RESIDENTIAL GRADE: 6% MAXIMIMUM COMMERCIAL GRADE: 6°__/o MINIMUM COMMERCIAL DRIVEWAY WIDTH: Width = 20' / 15' one-way Radius = 10' SIDE STREET CONSIDERATIONS: TURNING RADIUS MINIMUM: 35' major / 25' residential and minor streets PAVEMENT THICKNESS: g-- COMMERCIAL DRIVEWAY THICKNESS: 6'~' DRAINAGE TOPICS STORM SEWER DESIGN CRITERIA: TxDOT CITY City of Dallas Drainage Design Criteria HYDRO-35 X TP-40 iNLET DEPTHS (APPROPRIATE FOR PAVEMENT THICKNESS): MINIMUM COVER LATERALS: 2' below subgrade (Typical) BRIDGES/BOX CULVERTS INVOLVED 4.5' (Typical) YES X NO 100 YEAR FLOOD PLAIN CONSIDERATION yes / 2 FT FREEBOARD 07/12/2004 draft 9 ATTACHMENT A Supplemental Agreement to Master Agreement Governing Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B PERMITS COE404 PERMITS NEEDED YES may be required because of Cottonwood Cr. NO TNRCC 401 PERMIT YES may be required as part of the 404 permit NO CDC PERMIT YES NO X ElS YES __ NO X ADA PERMIT YES X NO ANY OTHER PERMITS FROM OTHER AGENCIES SUCH AS TXDOT, DFW AIRPORT, DART ETC.? YES Texas Historical Commission NO UTILITIES LIST OF ALL KNOWN UTILITIES 1. SBC Communications, 2. Oncor Electric Delivery, 3. TXU Gas, 4. Verizon, 5. Comcast, 6. AboveNet, 7. 360networks (USA) DOCUMENT KNOWN RISKS FOR OUR UTILITY PARTNERS: roadway alignment moved to the south to miss Oncor transmission towers ARE UTILITIES ON EXISTING STREET R.O.W.? Yes DO UTILITIES OWN THEIR R.O.W. OR HAVE PREVIOUS EASEMENTS ? Oncor has 40' utility easement HAS WORK ORDER BEEN ISSUED FOR SUE (Subsurface Utility Engineering) ? N~o ANY SPECIAL CONSIDERATIONS ? No 07/12/2004 draft 9 ATTACHMENT A Supplemental Agreement to Master Agreement Governing Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B R-O-W ACQUISITION RIGHT OF WAY CONSTRAiNTS, IF ANY, PROVIDE A LIST AND DESCRiPTION ALONG WITH DATA FOR RISK ASSESSMENT: Many of the newer residential developments have dedicated the right-of-way to accommodate the roadway widening. In addition, they have utility, landscape, and open space easements established beyond the right-of- way dedication. In the case of most older subdivisions, individual properties, and undeveloped tracts, the existing right-of-way is not sufficient for the proposed widening. There does not appear to be any right-of-way constraints. ANY NON-ROUTiNE, i.e., CEMETARY, JUNK YARD, OLD CHURCHES, SERVICE STATIONS, CONTAMiNATED SOILS, LANDFILLS, NOISE WALL CONSIDERATIONS, TRAILER PARKS, TREE ORDINANCES? YES __ NO X ANY NON-CONFORMiNG ISSUES ? YES NO X R-O-W MAP NEEDED YES completed NO FIELD NOTES NEEDED YES completed NO R-O-W PLATS NEEDED YES X NO RELOCATION ASSISTANCE iNVOLVED PARKING/LOSS OF PARKING CONSIDERATIONS HISTORICAL SITE CONSIDERATION YES NO X YES NO X YES NO X 07/12/2004 draft 9 ATTACHMENT A Supplemental Aereement to Master Agreement Governing Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B USUAL CITY TOPICS OF CONCERN DESIGN STANDARDS TO BE USED ? City of Coppell Construction Design Standards & NCTCOG Standard Specifications for Public Works Construction ORDER OF PRECEDENCE OF STANDARDS: (1) City of Coppell Standards (2) NCTCOG AUXILIARY LANES? None PROVISIONS FOR FUTURE WIDENING? N~o LANDSCAPING? Under separate contract Parks and Recreation Department EXPOSED AGGREGATE DRIVEWAYS, SIDEWALKS? N_po STAMPED/COLORED CONCRETE? Yes IRRIGATION? Yes - installation of the conduit is included in this project BRICK PAVERS? N~o STREET LIGHTING? Streetlights will be placed in the median - installation of the foundations and conduit will be included in this proiect. Oncor will install wiring and streetlights. TRAFFIC SIGNALS? Yes at the Coppell Road North and Coppell Road South intersections PAVEMENT MARKINGS? Yes BIKE LANES (EXTRA WIDTH)? N~o NEW SIDEWALKS ? Yes DART BUS TURNOUTS? N~o BUS STOPS OR BUS SHELTERS? N_9_o 07/12/2004 dra~ 9 ATTACHMENT A Supplemental Agreement Fo Master Aereement Governing Transportation Maior Capital Improvement Projects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B WATER UTILITY BETTERMENTS? Nc) WATER UTILITY RELOC.? Yes SAN. SEWER BETTERMENTS? Yes SAN. SEWER RELOC.? Yes RETAiNING WALLS? Decorative stacked-block retaining wall system (STONE, BLOCKS, GABIONS, PROPRIETARY TYPES) SOD, SEEDING, TOPSOIL? Yes DRAINAGE IMPROVEMENTS? Enclosed drainage system improvements and bridge RR CROSSING IMPROVEMENTS? No GRADE SEPARATIONS? Nc) RAMPS OR CONNECTORS TO TXDOT FACILITIES? No SPECIAL SCHOOL OR EMERGENCY VEHICLE CONSIDERATIONS ANY NEARBY OR ADJACENT SCHOOLS, CITY HALL, FIRE OR POLICE DEPARTMENT REQUIRING SPECIAL CONSIDERATION? N~o PUBLIC INVOLVEMENT CITY COUNCIL APPROVAL OF ALIGNMENT, REQUIRED ? YES X (approval of preliminary plans and award of construction contract) NO HAVE ALL NEIGHBOR GROUPS PROVIDED EARLY iNPUT? YES __ (citizen input will be solicited) NO X 07/12/2004 draft 9 ATTACHMENT A Supplemental Agreement to Master Aereement Governing Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B NEIGHBORHOOD MEETING, REQUIRED (not required but will be conducted) 1F REQUIRED WHO CONDUCTS, CITY OR COUNTY? City YES NO X CONSTRUCTIBILITY REPORT FROM INSPECTION STAFF, DOCUMENT ANY AND ALL ISSUES THAT MAY AFFECT PROJECT SCOPE, BUDGET, CONSTRUCTIBILTY, THE PROJECT SCHEDULE AND/OR THE SAFETY OF PROJECT ? Sandy Lake Road, from Coppell Road North to Denton Tap, is almost completely developed with residential subdivisions. Right-of-way will be required on both sides of the existing roadway. The existing irrigation and landscaping adjacent to the right-of-way, and currently maintained by an HOA, is an issue that will have to be addressed. Four of the smaller Oncor Electric transmission poles will need to be relocated. They are located within an exclusive Oncor easement and the relocation will be an expense of the City. There are overhead power lines on the south of Sandy Lake and five underground power line crossings that will need to be relocated. There is an overhead power line on the north side of the roadway that will need to be relocated. There are several underground lines that feed off of this line that will have to be evaluated. There is a high-pressure 24-inch gas line that crossed the roadway that may require lowering. There are gas distribution lines on both the north and south side of the roadway that will need to be relocated. Access across construction areas will need to be provided throughout all phases of construction. Temporary pavement will be needed to accommodate construction and to allow the existing roadway to remain in use. Most intersections will need to be constructed in phases to facilitate continuous access to and from Sandy Lake Road. Access to private drives will also have to be maintained. 07/12/2004dra~ 9 ATTACHMENT A Supplemental Agreement to Master Agreement Governing Transportation Maior Capital Improvement Proiects DESIGN AND CONSTRUCTION CRITERIA PROJECT NAME: W. Sandy Lake Road (Coppell Road N. to Denton Tap) ST 99-02B The interconnect system of the proposed traffic signals will need to be addressed. Tree removal will be a major issue. MASTER AGREEMENT FUNDING On October 17, 2000. Dallas County Commissioners Court approved participation in Transportation Major Capital Improvement Projects for the Program Years 2004, 2005, and a portion of 2006 by Court Order 2000-2117 with a list of proposed accepted projects attached to the Court Order. A MASTER AGREEMENT GOVERNING TRANSPORTATION MAJOR CAPITAL IMPROVEMENT PROJECTS was executed by the Town of Addison and Dallas County pursuant to Court Order No. 2002- 1375 dated July 30, 2002 which authorized transportation improvements TOTAL ESTIMATED PROJECT COSTS CITY AND/OR OTHERS PARTICIPATION DALLAS COUNTY PARTICIPATION $5,538,725 $4,238,725 $1,300,000 07/12/2004 draft 9