Loading...
Vista Point II-CS040720COPP-EI2£ P.O. Box 9478 255 Park~vay Blvd Coppell, TX 75019 Phone:(972)304-3679 Fax:(972)304-7041 ENGINEERING DEPARTMENT FAX CO VER SHEET To: John McMillan. From: Keith R. Marvin, P.E. Fax: 972-233-9598 Date: 7-20-04 Phooe: 972-980-9810 Pages: 6 (including cover sheet) Re: Vista Point 1I cc: [] Urgent [-1For Review [] Please Comment [] Please Reply [] As Requested .Comments: I've enclosed the estimated fees and the breakdown for each item. These may be revised when final engineerin.q plans are submitted if there is s chsn.qe to the water and sewer connections~ These fees represent the development on Tract I only. Additional fees will be assessed as/// the other portions of the larger development are constructed. / / Feel free to call me to discuss any questions or comments you may have. // # of Post-it® Fax Note 7671 Date Ipagesl~ ~o,~,. g~l// co. Phone ~ :hone ~ IF YOU DO NOT RECEIVE ALL OF THE P,4GES PLEASE CALL (972) 304-3679 "Cio: q/'Coppell Engineering Excellence By Dex(gn" PRELIMINARY July 20, 2004 John McMillan Carlton Co. RE: Vista Pointe II Fee Assessment Letter Mr. McMillan Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $113,663.25 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance ora Building Permit. Please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to the scheduled pre-construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any qucstions, please contact me. Sincerely, PRELIMINARY Keith R. Marvin, P.E. Civil Engineer CC: Jennifer Armstrong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation DEVELOPMENT FEE TABLE Project: Vista Pointe H Date: 7/20/2004 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fcc $9,660.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $300.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $565.44 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $6,057.98 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $90.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $6,720.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $150.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $150.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $113,663.25 $113,663.25 (100% due prior to Council Approval) Street Light Fee Information not Available (I 00% due prior to Acceptance of Project) II Street Sign Fee Information not Available (100% due prior to Acceptance of Project) II Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $137,446.67 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $113,663.25 DEVELOPMENT FEE WORKSHEET PROJECT: Vista Pointe H DATE: 7/20/2004 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 3 - 2 inch = 24 ESU's 1 - 2 inch = 8 ESU's 0 0 ESU's 2 - 10 inch 2.5 ESU's Total#: 34.5 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 6 Connections @ $50.00 ea. (Single ~amily due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 3 Domestic Meter(s) @ $188.48 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $188.48 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 2 Fireline Meter(s) @ $2,934.75 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 24 (Due prior to issuance of building permit) @ $280.00 ea. Wastewater Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 3 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $9,660.00 $300.00 $565.44 $188.48 $o.oo $5,869,5o $90.00 $9o.oo $6,720.00 $15o.oo $150.00 Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) $0.00 $0.00 $113,663.25 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Vista Pointe H DATE: 7/20/2004 ROADWAY IMPACT FEE: gervice Area * 2 ~ategory ** Office Land Use ** Business Park Building Area (sf) 93,550 )evelopment Units ** 93.55 Vehicle Miles per Development Unit ** 4.05 Fee per Vehicle Mile *** $300 Roadway Impact Fee due (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) $113,663.25 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway hnpact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)