Loading...
Stringfellow Addn-CS040701DEVELOPMENT REVIEW CO L IITTEE ENGINEERING COMMENTS ITEM: ~oppell Florist Addition~ Lot 1~ Block A, Replat, being a replat of Lot 1, Block A, of' the Stringfellov, Additioo, to allow the construction of a florist shop and office uses on 0.42 of an acre of property located at the south'vest con,er of Dandy Lake and Moore Roads, at the request of JDJR Engineers. STAFF REP.: Matt Steer PROJECT ID# RP-04-0041 DRC DA TE: June24, 2004 and Jul3, 1, 2007 CONT/t CT: Kenneth ,~1. Griffin, P.E., Dir. of Engineering/Public Works 972/304-3686 COM34ENTSTATUS: ~ ~t r~ w~ J ......... 1 ..... ~ FF FL~4L P~SED Site Dimension Control Plan 1. Line 3'our proposed driveway up with the existing drivexvay on the east side of Moore Road. Grading & Pa~ing Plan 1. Sm face drainage should be pickccl up on-site and conveyed to tile stoma se;ver system. 2. Offsite water from the south and west dram tl~rough this site. Need to show offsite drainage area with contours. Draioage system should be extended to tile south to pick up offsite water. How do you propose for the oft~site drainage to reach either of tile inlets through the proposed masonU, walls'? NOTE: General Engineering Observations These comments do not constitute a detailed review of any Engineering submittals. Detailed review ',','ill be performed after approval by City'Council. 1. The "plans" submitted at DRC do not constitute a submittal for engineering review. Plans for engineering review ca~mot be submitted until there has been approval of the replat, etc, by City Council. 2 There ts no need to reproduce the City of CoppclI's standard details m the plan set. The contractor will be required to have a full set of details on site during construction. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM": PF-203-R, Coppell Florist, ×onmg change request from SF42 (Single Family-12) to PD-203-R Planned Development-203-Retail) to allow the construction of a florist shop and office uses on 0.42 of an acre of property located at the southwest comer of Sandv Lake and Moore Roads, at the request of Bob Anderson. STAFF REP.: Matt Steer PROJECT ID# PD-04-0040 DRC DA TE: June24, 2004 attd,hdy 1, 2004 CO~¥T~i CT: Kenneth 31. Griffin, P. Iz:, Dir. of Engineering~Public Works 972/304-3686 COM:14ENTSTATUS: o~,~ tn~r~v ~ . .~L ............ ~FINAL ~ See additional comments on plat case, I. The site plan shows a 20' drainage easement on lhe south side of the properly. That does not at)pear on the plat. Resolve this discrepancy. 2. Thc driveway on Moore Road should line up with the drive across the street.