Loading...
Freeport NIP(8.0)-CS040610DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Duke-Freeport Addition~ Lots 6 and 7~ Block AT Replat, being a replat of a portion of Lot 2, Block A, to allow the construction of a 140,000-square- foot building on Lot 6 and a 70,000-square-£oot building on Lot 7, totaling approximately 14.13 acres o£property located along the west side o£ Freeport Parkway, south of Creekview Drive, at the request of Duke Realty Corporation. STAFF REP.: Matt Steer PROJECT ID# RP-04-0036 DRC DA TE: May 27, 2004 and June 3, 2004 CONTACT: Kenneth M. Gri~n, P.E., Dir. o~Engineerin~/Public Works 972/304-3686 COMMENT STATUS: ~ FINAL Water & Sewer Plan - I. The fire line on Sheet C4.0 shows tying into the existing system on Lot 5 Block A. That is a privately owned and maintained system and as such needs to remain independent of this fire line. Loop your fire line exclusive of this property. 2. The same is true of the fire line on Lot 6 versus Lot 7 those also need to be independent of each other. 3. This is also true of the water and sewer service to these two buildings. You cannot combine the services, they must be independent which will require the extension of the existing 8" sanitary sewer onto Lot 7 and two service lines, one for Lot 7 and one for Lot 6. 4. Water service will need to be relocated from Lot 7 to Lot 6 to serve the Lot 6 building as well. Additional comments may be forthcoming during the full engineering review.