SS0201-CS040726cOPPE L
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To:
From:
FOX CONTRACTORS, INC. fax ~/723-6007
RONE ENGINEERS fax 214-630-9819
Larry Davis, Construction Inspectg~~
Office Phone: (972) 304-3684
Fax: (972) 304-3570
Date: July 26, 2004
RE: WALK-THRU for Project #SS 02-01
Coppell Rd/Service Center Sewer Main
A final walk-thru for the referenced project has been scheduled for
Thursday, July 29th at 10:00 a.m.
Please let me know if I can be of further assistance.
CC:
Ken Griffin, Director of Engineering
Glenn Hollowell, Asst. Director of Public Works
Keith Marvin, Civil Engineer
Scott Latta, Engineering Tech
Suzan Taylor, CIP Coordinator
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"