Loading...
SS0201-LR040721Professional Inline Services, Inc. P.O. Box 118095 Carrollton, TX 75011-8095 Office 972-939-2600 Fax 214-731-0535 CONTRACTORS NAME: PROJECT: CITY OF: INSPECTOR: L~'c'q ..)'~)~xt ;.% INSPECTION FIRM: Professional Inline Services, Inc. OPERATOR: P.O. Box 118095 Carrollton, TX 75011-8095 PROFESSIONAL INL!NE SERVICES, INC, Office 972~939-2600 Fax 214-731-0535 Mobile 214-534-9942 Beeper 214-249-2309 LOW PRESSURE AIR TEST FOR GRAV~FY SANITARY SEWER Test Procedure: Each section of sewer shall be tested between sucessive manholes. Air shall be introduced into the pipeline until 4.0 psi gauge pressure has been reached. Al mat time the Ilow of air shall be reduced and the internal air pressure shall be maintained oetween 3.5 and 4.5 psi gauge for al leas~ two(2) minutes to allow the air temperature to come to equilibrium with the temperature of the pipe wall~. Pressure in the pipe shall be constantly mon[lored by a gauge and hose arrangement separate from 1he hose used to introduce air inlo the line Pressure in the pipe shall nol be allowed to exceed 5 psi. After the temperature has stabilized and no air leaks at the plugs have been found, the air pressure shail be used to determine the time lapse required for the air pressure to drop to 2.5 psi gauge. If Ihe time lapse required for the air pressure to decrease from 3.5 to 2.5 psi exceeds Ihat shown in '~he following table, line pipe shall be presumed to be within acceptable limits for leakage it me lime lapsed is less than that shown in the table, the contractor shall make corrections Id reduce the leakage lo acceptable limits. Linemfom at,o, I I I tTes'Result IAir.Test IMa'dre' Line Station to Station Pipe Size L.F.Tested Time Passed? Passed? Cocation~ (~//~. ~,,~ ~,,~ inspectors Full Name ~:~(' -- Date Job# RO. Box 118095 Carrollton, TX 75011-8095 PROFESSIONAL INLINE SERVICES, INC, Office 972-939-2600 Fax 2 t4-731-0535 Mobile 214-534-9942 Beeper 214-249-2309 MANHOT,R VACLFu-M TEST REPORT TEST PROCED%~RE Plug all m_~_nhole entrances and exits other than the m~J~hole top access using suitably sized pneumatic or mechanical pipeline plugs. Install the vacuum tester head ass-mhly at the top access of manhole. Attach vacuum pump to test head and start p~ml~. O~en inlet/outlet ball valve and evacuate the mmnhole to 10" Hg. (approximately negative 5PSIG, 0.3 bar) Close vacuum inlet/outlet ball valve and monitor vacuum for specified test period. Manhole # Hg.. PSIG TimePassed