Loading...
WA0101-CS040720 (2)BIRKHOFF, HENDRICKS & CONWAY, L.L.P. CONSULTING ENGINEERS 7502 Greenville Ave., #220 JOHN W. BIRKHOFF, P.E RONALD V. CONVJAY, PE. GARY C. HENDRICKS, PE. JOE R CARTER, PE. PAUL A. CARLINE, MATT HICKEY, P.E. DOUGLAS K SHOWERS, P.E Dallas, Texas 75231 Fax (214) 361-0204 July 20, 2004 Phone (214) 361-7900 Ms. Suzan C. Taylor, C.I.P. Coordinator City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: State Highway 121 Water Line (Coppell Road to Denton Tap Road) WA 01-01 100% Plans and Specifications Dear Ms. Taylor: We are enclosing two sets each of final construction plans and specifications for the S.H. 121 Water Line project from North Coppell Road to Denton Tap Road (Project WA 01-01). We believe that this project is ready to proceed to the bidding phase. The only piece missing from the Specifications is the Bid Number and the structure of dates for the pre-bid meeting and for the receipt of the contractors bid proposal at the offices of the City of Coppell. We have also included our Opinion of Probable Construction Cost. As you will notice, we have included a contingency item for the potential relocation of Grande Communications' fiber optic cable between Sta. 36+25 and 37+00. Although we have contacted Grande, we do not have a formal proposal for relocation costs associated with this portion of the project. At this time we are estimating $100.00 per linear foot. Once we have received communications regarding this contingency, we will recalculate the Opinion of Construction Cost and forward this to your attention. Please review these documents and advise if there are any issues requiring our attention. We are ready to proceed, with your approval. ~~~Sincerely, Douglas K. Sh'rfwers, P.. Enclosure C.C. Mr. Ken Griffin, P.E. i~r. Keith Marvin, P.E.