SW0001-EM040204APPLICATION AND CERTIFICATION FOR PAYMEN I TO: CiB'ofCoppell PO Box 9478 Coppel, TX 75019 FROM: Green Sc, aping 8o17 Card(no Lane N Richlm~d Hills. TX 76180 AIA DOCU^.tENT G702 APPLICATION NO: 5 Final Application Date: 2/4/04 PERIOD TO: 1/31/04 PAGE ONE OF 1 of 2 Distribution to 1~'-} OWNER [-'~ ARCHITECT ~ CONTRACTOR CONTRACT FOR: Ri,,erchase Sidewalk CONTRACTOR'S APPLICATION FOR PAYMENT Application is madc for payment, as shown belmv, m connection with lite Contract. Continuation Sheet. AIA Document G703, is attached. 1. ORIGINAL CONTRACT SUM 2. Net clkange by Change Orders 3. CON3IL~CT SUM TO DATE (Line I ± 2) 4. TOTAL CON'FPLETED & STORED TO DATE (Column G on G703) 5. RETAFNAGE: a. 0 % of Completed Work (Column D + E on G703) b~ % of Stored Material ~ (Colmnn F on G703) Z: Total Retainagc (Lines 5a + 5b or 0. Total in Column I of G703) · 6, TOTAL EARNED LESS RETAiNAGE t~ (Linc 4 Less Line 5 Total) 7. LESS pREVIOUS CERTUFICATES FOR Z: PAYMENT (Line 6 from prior Certificate) ~ CURRENT pAYMENT DUE 8. $ $ $ 135,737.00 $ 6,906,00 $ 142,643.00 $ 142,343.00 0.00 0.00 $ 0.00 $ 142,343.00 9. BALANCE TO FINISH. INCLUDING RETAINAGE (Line 3 less Line 6) 128,108.70 14,234.30 300.00 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months by Owner Total approved this Month 6,906,00 TOTALS 6,906 00 NET CHANGES by Change Order $6,90600 The tmdersigned Contractor certifies that to tho best of(be Conlractor's kno/~ledge, infonnafion and belief the Work covered by this Application for Pa3'menl has been completed in accordance with the Contract Documents, that all amounts have boon paid by the Contractor for Work for wkich previous Ccrtitlcates for Payment x~ere issued and payments received front the Owner, and that current payment shown herein is now due. CONTRACIOR: Green Scaping State of: Texas Sobscribed and sworn Io before me fids Notary Public: My Commission expires: County of: Tm'rant day of ARCHITECT'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on-silo observalions and the data comprising the application, the Amhitect certifies to the Owner thai to the besl of the Arci-fitect's knowledge, information }md belief the Work has progressed as indicated, file quality of rite Work is in accordance w/th tho Contract Docmnems, and the Contractor is enlilled to payment of the AIVlOUNT CERTIFIED, AMOUNT CERTIFIED ....... $ fl It(ach explanation if amount certified differs from the amount applied lnithd all figurex on this Application end on(he Contimtation ,Sheet that are changed to conform **ith lite amount certified) ARCHITECT: By: Date: , ,, This Cer6ficate is not negot ab e Thc Pd,,IOUNT CERTPFIED is payable onh' to the prejud cc to any fights of the O~* nor or Contractor under lhis Contract. CONTINUATION SHEET Subcontractor Green Scaping 8917 Cardinal Lane N. RichJand Hills, TX 76180 AM DOCUMENT (7703 APPLICATION NO: APPLICATION DATE: PEI/JOD TO: 5 Final 2/4/2004 1/31/2004 CONTRACT FOR: Riverchase Sidewalk A B C D ] E F O H I TEM I)ESCRIPHON OF WORK SCHEDULED WORK COMPLETED MA I'ERIAI,S fOTAL 5',; BALANCE REiAINAGF NO. VALUE FROM PREVIOI IS THIS PERIOD PRESENTLY COMPI,ETED (G + C'~ it) FINISH 10% APPLICATION S [ORED AND STORFD (C - O) RATE) (D + E) (NOT IN TO DATE D DR E) (I)+E+F) [-1 Earth&Borrow 20,310.0C $20,31000 $20,31000 100.00% $0.00 $2,03100 I-2 Silt Fence 294.0( $29400 $294.00 100.00% $0.00 $2940 I-3 H%' Bale Check Dam 300.0( $0.00 0.00% $300.0C $0.00 I4 Concrete Sew Cut 36000 $360.00 $360.00 10000% $00C $36.00 I-5 4" Concrete Sidewalk $10,188.00 $10,188.00 $10,188.00 I00.00~ $00C $1.018 80 I-6 Barrier Free Ramp $2,400.00 $2,400.00 $2,400.00 lO0.O0°A $0.0~ $240.00 I-7 g' Elevated Sidewalk $101,885.00 $I01,885.00 $101,885.00 100,00% $0.0( $10,188.50 CHANGE ORDERS I Earth & Bonow $1,560.00 $1,560.00 $1,560.0C 100.00~ $0.00 $156.00 Concrete Saw Cut $150.00 $150.00 $150.0C 100.00°g $0.00 $15.00 4" Concrete Sidewalk $3,996.00 $3,996.00 $3,996.0( 100.00%' $0.00 $399.6~ lamer Free Ramp $1,200.00 $1,200.00 $1,200.0( 100.00% $0.00 $120.00 GRAND TOTALS $142,643.0( $142,343.0( $0.00 $0.00 $142,343.00 9939% $300.00 $14,23430