ST9502-LR 960529CONCRETE COMPRL.,SIVE STRENGTH TES
4747 Irving Blvd., Suite 0206
Dalla_a~ Texas 75247
Date of Service:
Client No.:
Client:
Services:
05/29/1996
79543000
Site Concrete, Inc.
Ms. Jean Boney
P.O. Box 140096
Irving TX 75014-0096
Report No.: 964184
Project No.: 43-1222-96
Project: Town Center
Coppell, Texas
Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive
strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Site Concrete
CONCRETE SUPPLIER: Site Concrete
e~a~r: On-Site
SPECIFICATION REQUIREMENTS
STRENGTH: 3600 psi ~ 28 Days
2" - 3"
3 - 6%
ASTM C-39
ASTM C-172
ASTM C-143
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inche~) TESTED
1 1 2.5 06/26/1996
1 2 2.5 06/26/1996
PROJECT DATA
CONCRETE CLASS: N/A
PLACEMENT DATE: 05/29/1996
TIME SAMPLED: 7:23 am BY: Zach Howard
WEATHER CONDITIONS: Clear
TEMPERATURE (F) - AIR 72 F CONCRETE: 79 F
TRUCK NO: N/A
AIR CONTENT (%): 5.5%
PLACEMENT LOCATION:
BATCH TIME: N/A
TICKET NO: N/A
uNIT w~ia~iT (pc0: N/A
Paving on Town Center Boulevard
SAMPLE LOCATION:
ACCUMULATIVE YARDS:
REPORT OF TESTS
MAXIMUM
Station 0+85
500
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
AGE LOAD
(days) Ohs. force)
28 119940 4240
28 119800 4240
Refer to Report No. 964185 for time.
Technician: Zach Howard
Report Distribution:
(1) Site Concrete, Inc.
(1) City of Coppell
Started: Finished:
Vice President
OIAS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering Inc.
CONCRETE COMPRLoSIVE STRENGTH TES.
4747 Irving Blvd., Suite #206
Dallas, Texa~ 75247
Date of Service:
Client No.:
Client:
Services:
05/29/1996
79543000
Site Concrete, Inc.
Ms. Jean Boney
P.O. Box 140096
Irving TX 75014-0096
Report No.: 964184
Project No.: 43-1222-96
Project: Town Center
Coppell, Texas
Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive
strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Site Concrete
CONCRETE SUPPLIER: Site Concrete
PtANT: On-Site
SPECIFICATION REQUIREMENTS
STRENGTH: 3600 psi ~ 28 Days
2" - 3"
3 - 6%
ASTM C-39
ASTM C-172
ASTM C-143
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
2 1 3.25 06/26/1996
2 2 3.25 06/26/1996
PROJECT DATA
CONCRETE CLASS:
PLACEMENT DATE:
TIME SAMPLED: 9:25 am
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCKNO: N/A
AIR CONTENT (%): 5.2%
PLACEaMENT LOCATION:
SAMPLE LOCATION:
ACCUMULATIVE YARDS:
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) Obs. force)
N/A
05/29/1996
BATCH TIME: N/A
BY: Zach Howard
Clear
77 F CONCRETE: 78 F
TICKET NO: N/A
UNIT WEIGHT (pcf): N/A
Paving on Town Center Boulevard
Station 3+75
50O
COMPRESSTVE
STRENGTH
(vsl)
28 126650 4480
28 121860 4310
FRACTURE
TYPE
Refer to Report No. 964185 for time.
Technician: Zach Howard
Report Distribution:
(1) Site Concrete, Inc.
(1) City of Coppell
Started: Finished:
ing, Inc.
Eugene Harbour
Vice President
01AS
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc.
CONCRETE COMPRLJSIVE STRENGTH TES l
4747 Irving Blvd., Suite #206
Dalla% Texas 75247
Date of Service: 05/29/1996 Report No.:
Client No.: 79543000 Project No.:
Client: Site Concrete, Inc. Project:
Ms. Jean Boney
P.O. Box 140096
Irving TX 75014-0096'
Services:
964184
43-1222-96
Town Center
Copp~l, Texas
Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive
strength samples.**
SLUMP:
AIR:
TEST METHOD:
corerRAcroa: Site Concrete
CONCRETE SUPPLIER: Site Concrete
PXaUer: On-Site
SPECIFICATION REQUIREMENTS
grmv~t~TH: 3600 psi ~ 28 Days
2" - 3"
3 - 6%
ASTM C-39
ASTM C-172
ASTM C-143
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
3 1 3.0 06/26/1996
3 2 3.0 06/26/1996
PROJECT DATA
CONCRETE CLASS:
PLACEMENT DATE:
TIME SAMPLED: 10:30 am
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: N/A
AIR CONTENT (%): 3.8%
PLACEMENT LOCATION:
SAMPLE LOCATION:
ACCUMULATIVE YARDS:
REPORT OF TESTS
AGE LOAD
(days) Ohs. force)
N/A
05/29/1996
BATCHTIME: N/A
BY: Zach Howard
Clear
83 ~* CONCRETE: 81 F
TICKET NO: N/A
UNIT wmGIrr 0,c0: N/A
Paving for Town Center Boulevard
Station 5+50
500
COMPRESSIVE
STRENGTH
(!,~)
28 118080 4180
28 121010 4280
FRACTURE
TYPE
Refer to Report No. 964185 for time.
Technician: Zach Howard
Report Distribution:
(1) Site Concrete, Inc.
( 1 ) City of Coppell
Started: Finished:
I"~~ Inc.
Eugene Harbour
Vice President
01AS
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineeri~ Inc.
CONCRETE COMPRLJSIVE STRENGTH TES l
4747 Irving Blvd., Suite #206
Dallas, Texas 75247
Date of Service: 05/29/1996
Report No.: 964184
Client No.: 79543000
Project No.: 43-1222-96
Client:
Services:
Site Concrete, Inc. Project: Town Center
Ms. Jean Boney Coppell, Texas
P.O. Box 140096
Irving TX 75014-0096
Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive
strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Site Concrete
CONCRETE SUPPLIER: Site Concrete
PLANT: On-Site
SPECIFICATION REQUIREMENTS
STRENOTH: 3600 psi ~ 28 Days
2" - 3"
3 - 6%
ASTM C-39
ASTM C-172
ASTM C-143
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
4 1 2.5 06/26/1996
4 2 2.5 06/26/1996
PROJECT DATA
CONCRETE CLASS:
PLACEMENT DATE:
TIME SaMPLED: 12:10 pm
WEATHER CONDITIONS:
TEMPERATURE (F) - AIR
TRUCK NO: N/A
AIR CONTENT (%): 3.8%
PLACEMENT LOCATION:
N/A
05/29/1996
BATCH TIME: N/A
BY: Zach Howard
Clear
81 F CONCRETE: 82 F
TICKET NO: N/A
uNrr w~mIrr (~c0: N/A
Paving on Town Center Boulevard
Station 7+75
500
COMPRESSIVE
STRENGTH
(psi)
SAMPLE LOCATION:
ACCUMULATIVE YARDS:
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) Obs. force)
28 12O9OO 4280
28 117950 4170
FRACTURE
TYPE
Refer to Report No. 964185 for time.
Technician: Zach Howard
Report Distribution:
(1) Site Concrete, Inc.
(1) City of CoppelI
Started: Finished:
Eugene Harbour
Vice President
01AS Ttfis report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering Inc.
CONCRETE COMPRL ,SIVE STRENGTH TEL.
Date of Service: 05/29/1996 Report No.:
Client No.: 79543000 Project No.:
Client: Site Concrete, Inc. Project:
Ms. Jean Boney
P.O. Box 140096
Irving TX 75014-0096
Services:
4747 Irving Blvd., Suite #206
Dallas, Texas 75247
964184
43-1222-96
Town Center
CoppeR, Texas
Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive
strength samples.**
SLUMP:
AIR:
TEST METHOD:
CONTRACTOR: Site Concrete
CONCRETE SUPPLIER: Site Concrete
Pt.~rr: On-Site
SPECIFICATION REQUIREMENTS
STRENGTH: 3600 psi ~ 28 Days
2" - 3"
3 - 6%
ASTM C-39
ASTM C-172
ASTM C-143
CYLINDER MEASURED
MARKED SLUMP DATE
SET NO. (inches) TESTED
5 1 3.0 06/26/1996
5 2 3.0 06/26/1996
PROJECT DATA
CONCRETE CLASS:
PLACEMENT DATE:
TIME SAMPLED: 2:45 pm
WEATHER CONDITIONS:
TRUCK NO: N/A
AIR CONTENT (0/0): 4.7%
PLACEMENT LOCATION:
SAMPLE LOCATION:
ACCUMULATIVE YARDS:
REPORT OF TESTS
MAXIMUM
AGE LOAD
(days) Obs. force)
N/A
05/29/1996
BATCH TIME: N/A
EY: Zach Howard
Clear
87 F CONCRETE: 83 F
TICKET NO: N/A
UNIT WEIGHT (pcf): N/A
Paving for Town Center Boulevard
Station 11+50
500
COMPRESSIVE
STRENGTH
28 116940 4140
28 114190 4040
FRACTURE
TYPE
Refer to Report No. 964185 for time.
Technician: Zach Howard
Report Distribution:
(1) Site Concrete, Inc.
(1) City of Coppell
Started: Finished:
I-~~Inc.
Eugene Harbour
Vice President
01AS
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering Inc.