Loading...
ST9502-LR 960529CONCRETE COMPRL.,SIVE STRENGTH TES 4747 Irving Blvd., Suite 0206 Dalla_a~ Texas 75247 Date of Service: Client No.: Client: Services: 05/29/1996 79543000 Site Concrete, Inc. Ms. Jean Boney P.O. Box 140096 Irving TX 75014-0096 Report No.: 964184 Project No.: 43-1222-96 Project: Town Center Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Site Concrete e~a~r: On-Site SPECIFICATION REQUIREMENTS STRENGTH: 3600 psi ~ 28 Days 2" - 3" 3 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inche~) TESTED 1 1 2.5 06/26/1996 1 2 2.5 06/26/1996 PROJECT DATA CONCRETE CLASS: N/A PLACEMENT DATE: 05/29/1996 TIME SAMPLED: 7:23 am BY: Zach Howard WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 72 F CONCRETE: 79 F TRUCK NO: N/A AIR CONTENT (%): 5.5% PLACEMENT LOCATION: BATCH TIME: N/A TICKET NO: N/A uNIT w~ia~iT (pc0: N/A Paving on Town Center Boulevard SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS MAXIMUM Station 0+85 500 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE AGE LOAD (days) Ohs. force) 28 119940 4240 28 119800 4240 Refer to Report No. 964185 for time. Technician: Zach Howard Report Distribution: (1) Site Concrete, Inc. (1) City of Coppell Started: Finished: Vice President OIAS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering Inc. CONCRETE COMPRLoSIVE STRENGTH TES. 4747 Irving Blvd., Suite #206 Dallas, Texa~ 75247 Date of Service: Client No.: Client: Services: 05/29/1996 79543000 Site Concrete, Inc. Ms. Jean Boney P.O. Box 140096 Irving TX 75014-0096 Report No.: 964184 Project No.: 43-1222-96 Project: Town Center Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Site Concrete PtANT: On-Site SPECIFICATION REQUIREMENTS STRENGTH: 3600 psi ~ 28 Days 2" - 3" 3 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 2 1 3.25 06/26/1996 2 2 3.25 06/26/1996 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 9:25 am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCKNO: N/A AIR CONTENT (%): 5.2% PLACEaMENT LOCATION: SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS MAXIMUM AGE LOAD (days) Obs. force) N/A 05/29/1996 BATCH TIME: N/A BY: Zach Howard Clear 77 F CONCRETE: 78 F TICKET NO: N/A UNIT WEIGHT (pcf): N/A Paving on Town Center Boulevard Station 3+75 50O COMPRESSTVE STRENGTH (vsl) 28 126650 4480 28 121860 4310 FRACTURE TYPE Refer to Report No. 964185 for time. Technician: Zach Howard Report Distribution: (1) Site Concrete, Inc. (1) City of Coppell Started: Finished:  ing, Inc. Eugene Harbour Vice President 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. CONCRETE COMPRLJSIVE STRENGTH TES l 4747 Irving Blvd., Suite #206 Dalla% Texas 75247 Date of Service: 05/29/1996 Report No.: Client No.: 79543000 Project No.: Client: Site Concrete, Inc. Project: Ms. Jean Boney P.O. Box 140096 Irving TX 75014-0096' Services: 964184 43-1222-96 Town Center Copp~l, Texas Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** SLUMP: AIR: TEST METHOD: corerRAcroa: Site Concrete CONCRETE SUPPLIER: Site Concrete PXaUer: On-Site SPECIFICATION REQUIREMENTS grmv~t~TH: 3600 psi ~ 28 Days 2" - 3" 3 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 3 1 3.0 06/26/1996 3 2 3.0 06/26/1996 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 10:30 am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: N/A AIR CONTENT (%): 3.8% PLACEMENT LOCATION: SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS AGE LOAD (days) Ohs. force) N/A 05/29/1996 BATCHTIME: N/A BY: Zach Howard Clear 83 ~* CONCRETE: 81 F TICKET NO: N/A UNIT wmGIrr 0,c0: N/A Paving for Town Center Boulevard Station 5+50 500 COMPRESSIVE STRENGTH (!,~) 28 118080 4180 28 121010 4280 FRACTURE TYPE Refer to Report No. 964185 for time. Technician: Zach Howard Report Distribution: (1) Site Concrete, Inc. ( 1 ) City of Coppell Started: Finished: I"~~ Inc. Eugene Harbour Vice President 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineeri~ Inc. CONCRETE COMPRLJSIVE STRENGTH TES l 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Date of Service: 05/29/1996 Report No.: 964184 Client No.: 79543000 Project No.: 43-1222-96 Client: Services: Site Concrete, Inc. Project: Town Center Ms. Jean Boney Coppell, Texas P.O. Box 140096 Irving TX 75014-0096 Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Site Concrete PLANT: On-Site SPECIFICATION REQUIREMENTS STRENOTH: 3600 psi ~ 28 Days 2" - 3" 3 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 4 1 2.5 06/26/1996 4 2 2.5 06/26/1996 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SaMPLED: 12:10 pm WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: N/A AIR CONTENT (%): 3.8% PLACEMENT LOCATION: N/A 05/29/1996 BATCH TIME: N/A BY: Zach Howard Clear 81 F CONCRETE: 82 F TICKET NO: N/A uNrr w~mIrr (~c0: N/A Paving on Town Center Boulevard Station 7+75 500 COMPRESSIVE STRENGTH (psi) SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS MAXIMUM AGE LOAD (days) Obs. force) 28 12O9OO 4280 28 117950 4170 FRACTURE TYPE Refer to Report No. 964185 for time. Technician: Zach Howard Report Distribution: (1) Site Concrete, Inc. (1) City of CoppelI Started: Finished: Eugene Harbour Vice President 01AS Ttfis report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering Inc. CONCRETE COMPRL ,SIVE STRENGTH TEL. Date of Service: 05/29/1996 Report No.: Client No.: 79543000 Project No.: Client: Site Concrete, Inc. Project: Ms. Jean Boney P.O. Box 140096 Irving TX 75014-0096 Services: 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 964184 43-1222-96 Town Center CoppeR, Texas Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Site Concrete Pt.~rr: On-Site SPECIFICATION REQUIREMENTS STRENGTH: 3600 psi ~ 28 Days 2" - 3" 3 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED 5 1 3.0 06/26/1996 5 2 3.0 06/26/1996 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 2:45 pm WEATHER CONDITIONS: TRUCK NO: N/A AIR CONTENT (0/0): 4.7% PLACEMENT LOCATION: SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS MAXIMUM AGE LOAD (days) Obs. force) N/A 05/29/1996 BATCH TIME: N/A EY: Zach Howard Clear 87 F CONCRETE: 83 F TICKET NO: N/A UNIT WEIGHT (pcf): N/A Paving for Town Center Boulevard Station 11+50 500 COMPRESSIVE STRENGTH 28 116940 4140 28 114190 4040 FRACTURE TYPE Refer to Report No. 964185 for time. Technician: Zach Howard Report Distribution: (1) Site Concrete, Inc. (1) City of Coppell Started: Finished: I-~~Inc. Eugene Harbour Vice President 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering Inc.