GROUNDWATER INVESTIGATION
FOR
BRIGHTON MANOR (FALLS @ WESTMONT)
MACARTHUR BOULEVARD AND SAMUEL BOULEVARD
COPPELL, TEXAS
REPORT NO. S-104-0172
REPORT
to
STREET CUSTOM HOMES
COPPELL, TEXAS
by
GEE CONSULTANTS, INC.
GEOTECHNICAL, CONSTRUCTION MATERIALS
AND ENVIRONMENTAL CONSULTANTS
DALLAS, TEXAS
July 12, 2004
Jul ~8 04 08:4Sa DOSJDEY. RHDERSOH&RSSOC. XHC {97;J]93! 8787 I:.4
· GEOTECHNICAL ENGINEERING
· ENVIRONMENTAL CONSULTING
· CONSTRUCTION MATERIALS TESTING
GEE Consultants, inc.
10046 Monroe Drive
Dallas, lexas 75229
July 12, 2004
Street Custom Homes
c/o Mr. Rodney Louvicrc
Dowdey, Anderson & Associates. Inc.
5225 Village Creek Drive, #200
Piano, Texas 75093
RE:
Report No. S-104-0172
Groundwater Investigation
Brighton Manor (Falls @ Westmont)
MacArthur Boulevard and Samuel Boulewtrd
Coppell, Texas
(214) 352-5433
Fax (214) 352-6972
Dear Mr. Louviere:
This report transmits th~ lindings of the~groundwater investigation performed at the above
referenced location. ~lhe objective of"i~is i~ion was to determine the general
strangraphy of tile subsurface formations and groundwater present at the boring location.
Results of the field program were analyzed to provide engineering rccommendalions for
surthce groundwater removal as requested.
This study consisted of drilling one,,~exploratory hand auger boring to explore the
subsurface ctmditions. The location of this test boring~d on the P/an c~'Bodng
included in the Appendix of this report.
Jul 28 04 08:47a
DOWDEY.R~DE~SO~RSSOC, IMC (872(831 6787
Street
July 12. 2004
I. Site Location and Observations
The groundwater investigation concentrated on the area located between Lots 8 and
9, Block B, of Brighton Manor (The Falls at Westmont) in Coppell, Texas,
The regional topographic gradient in the area of Lots 8 and 9, Block B, was gently
sloping downward toward the northeast toward Denton Creek. At the time of our
site investigation, surface groundwater was noted flowing along a swale between
Lots 8 and 9, Block B, in an east-southeast direction toward Duncan Drive. Upon
exiting the swale at the road cut for future Duncan Drive, the surface groundwater
flowed in a northerly direction along the east property line of Lot 8, Block B, During
current field operations, flowing groundwater was noted at a depth of approximately
ouc (i.0) foot below existing grade after a small excavation was made along the side
of the swale using a hm~d held shovel.
1I.
Field Exploration
Thc subsurface exploration consisted of one (1)..~, er boring drilled on June
4, 2004 to a depth of four (4.0) feet. The boring was advanced at ~e approximate
location shown on the Plan of Boring included herein.
p.5
IlL Subsurface Soil Description
The subsurface materials encountered at the test boring locations consisted of clayey
sands with large gravel. The clayey sands and gravel were very loose. Auger refusal
was encountered at a depth of four (4.0) feet at what was opined to be shale.
Detailed descriptions of the various strata encountered are p~csented Oll the
individual Log of Bm'i,g in lhe Appendix of this report.
[V. Subsurface Water Conditions
At the time of field exploration, groundwater or seepage was encountered at a depth
of one (l.0~foot at the hand auger boring. The subsurface water regime is subject
to change with variations in climatic conditions. If there is a noticeable change from
the conditions repot(ed herein, GEE Consultants, inc. should immediately be
notified to review the el'feet it may have on the enclosed analysis and
recommendations. It is not possible to accurately predict the magnitude of
subsurface water fluctuations that mighl occur based upon short-tm~m observations.
GEE Consultants, Inc. Report No. S-104-0172
Page 2
04 08:47a
DOWDEY.RMDERSOM&RSSOC. IMC
~97~J931 8787
Street CIz~;tom Home~
July 12. 2004
V. Limitations
The professional engineering services performed, findings obtained, and
recommendations prepared were accomplished in accordance with currently accepted
geotechnical engineering principles and practices. The possibility always exists that
the subsurface conditions at the site may vary from those enconntered at the
borehole. If there are any unusual conditions differing significantly from those
described herein, GEE Consnltants, Inc. should inunediately be notified to determine
thc effects on the performance of the designed surface groundwater removal system.
The recommendations given in this report were prepared exclusively for the use of
Street Custom Homes and/or their consultants. The information supplied herein is
applicable only for thc design of the surtgce groundwater removal system. This
information should not be used for any other purpose. GEE Consnltants, Inc. is not
responsible for the conclusions, opinions, or recommendations made by others based
on this information. Also, this firm is not responsible for danaages caused by the
workmanship of the contractors. The quality of all phases of the consu'uction of the
proposed surface groundwater removal system should be checked by qualified
persomlel to insure that the work is done in the field in accordance with the accepted
plans and spccifications.
VI,
Analysis and Recommendations
A. Groundwater Observations Analysis
,\s previously discussed, tile regional topo~aphic gradient is sloping
downward to the northeast. Lo,.~sts 8 and 9 of Block B, are located in northeast
portion of the site. It is not anconunon to note shallow groundwater itl the
lower areas of a site.
Shale was noted at shallow depths at numerous locations in the original
geotechnicat investigation. Based oil the current auger boring, the shale is
believed to be at a depth of tour (4.0) ~Eet between Lots 8 and 9 of Block B.
Overburden soils encountered at the current boring location fi'om the sm'face
to tile top of the shale consisted of highly permeable loosc clayey sand and
gravel. It is our opinion that shallow water is being trapped on top of the
shale formation. The groundwater is Oran traveling horizontally through the
highly permeable clayey sand and gravel to the nearest point of relief.
~dwater was encountered at only one (1) boring location at eight
~ dmSng the original geotechnical in~esugation (July, 2003), the
appearance of shallow groundwater may occur only on an intermittent or
seasonal basis and at limited locations. Prior to advancing the current test
boring, total rainfall for year 2004 was well above average.
GEE Consultants, Inc.
Report No. S.104-0172
Page 3
Jul 28
DOWDEY.RMOERSOM&RSSOC. IMC
Street Custom Homg?i
July 12. 2004
B. Surface Groundwater Removal System
To improve the drainage 'along the swale between Lots 8 and 9, Block B, we
recomntend the upper three (3.0) feet of soil along the swale be removed. A
six (6) inch diameter slotted PVC or perforated pipe should be placed along
the bottom of the excavation. The removed soil should then be replaced wRb
three-fourths (3/4) inch to one (1) inch crushed stone to a depth of twelve
(12) inches below final grade. The crushed stone should surround the six (6)
inch pipe. The crushed stone will do a better job of supporting surface loads
than thc current wet clayey sand.
The pipe should consist ora six (6) inch diameter slotted PVC or perlbrated
pipe surrounded by four (4) to six (6) inches of three-fourths (3/4) inch to one
( 1 ) inch crushed stone cover. The crushed stone should be placed over, under
and around the pipe. A filter fabric material should be wrapped around the
crushed stone and pipe. All fabric laps should be a mi.imum of six (6)
inches. The closure (fabric overlap) should be stitched at minimum intervals
of five (5.0) feet. The installatiou of at least two (2) clean-outs is
recommended to keep the system free of debris and functioning properly.
The pipe should be sloped to drain downward at a minimum fall of one (1)
inch per ten dO.O) feet.
The remaining upper twelve (12) inches of near surface backfill should
consist of a clay cap. Clay cap material should have a minimum plasticity
index of twenty-five (25) and be compacted to a minimum of ninety-five (95)
percent of the maximum density as detcrlnined by ASTM D 698.
Based upon the current grading plan, the swale between Lots 8 and 9, Block
B slopes downward toward the east-southeast at a fall of approximately one
(I) inch lb~ every eight (8.0) f¢ct. It is recommended that the groundwater
collected by the drain pipe be allowed to accumulate in a sump pump and
pumped through the proposed curb onto Duncan Drive concrete pavement,
This would tend to improve the capture of groundwater traveling downhill
and lower the water table. Thc proposed drainage system pipe location is
indicated on the ?lat~ o,/'Boring,
If shallow grot}ndwater continues to be prevalent after installation of the
swale drainage system described above, consideration should also be given
to expanding tile drain line along the rear (west) side of Lot 9, Block It.
Due to thc cmTent level of groundwater noted along the swale, the potential
exists for groundwater to be present in adjacent lot residemial slab grade
beam excavations. If groundwater is present in grade beam excavations,
structural loads may need to be supported using pier foundation systems.
Expanding drain lines along the rear of Lot 9 and possibly Lot 8, Block B,
GEE Consultants, Inc.
p.?
Report No. S-104-0172
Page 4
I
I
I
i
]
!
i
i
I
i
04 08:48~
OOWDEY.RMDERSOM&RSSOC. IRC ~9721931-~787
Street Cmtom H~mes
.lulv 12. 2004
will help reduce the potential for ~oundwater being present in grade beam
excavations.
In lieu of a sump pump collection system, consideration could be given to a
solid drain pipe that travels from the end of the swale between Lots 8 and 9,
Block B, downward to the north-northeast via the existing easement along
Duncan Drive. The drain pipe would connect to the storm drain inlet located
along the south side of Hood Drive, adjacent to the eyebrow cul-de-sac near
the intersection of Hood Drive and Duncan Drive. If shallow groundwater
is encountered at any locations in Lots 7 and 8 of Block B, drainage sw~e
drain systems could be added and connected into the solid pipe and ultimately
the storm drain system.
Both the solid pipe gravity outtall system and/or the sump pump collection
system will need dcsign input from thc Civil Engineer and approval from the
City of Coppell.
Additional Recommendations and Discussion
To reduce potential for wet spots, we recommend ground cover or grass be
planted in current areas of wet spots and standing water. Vegetation will
promote transpiration and provide a better living surface for residents.
From up s~ope adjacent propellies, water should be prevented I¥om draining
into the area. This will reduce the potential for wct spots and standing water
on the subject site.
If water is pumped onto concrete pavement by way of a sump pump, the
potential for pavement distress due to water infiltrating cracks and pavement
joints increases. Joints and cracks should be properly scaled as required.
Drain construction should be completed at least three (3) months prior to any
foundation construction. This will reduce the potential for subgrade
shrinkage and groundwater beneath the foundation.
To ensure that the recommendations contained in this report are properly
implemented, we reconunend periodic inspections be conducted during drain
construction. Additionally, we recommend confirmation of all materials to
be used prior to construction.
It should be understood that groundwater levels and moisture are highly
variable and tricky. No guarantee or wmTanty is implied that the
recommendations outlined above will correct conditions observed, or that
p.8
GEE Consultants, Inc.
Report No. S-104-0172
Page 5
Jul ~8
O4
08:48a
DO~DEY.RMDERSOM&SSSOC. IMC
( 872 ) 931 -S787 p . 9
Street Custom Hom~
./ulv 12.
detrimental conditions may not occur in the future. Our recommendations
should be reviewed by your Civil and Structural Engineer.
We appreciate the opportunity to be of service to you on this project. We will be happy to
discuss any questions you may have concerning this report. We look forward to serving you
in the future.
Very truly yours,
GEE Consultants, Inc.
,, E,i.T.
Division Manager
Geotechnical Engineering Division
AJ A:RWG/js
Attachments
GEE Consultants, Inc.
Report No. S-104-0172
Page 6
3~1 28 04 08:48a DOWOE¥.BMDE~SOM&~SSOC. I~C ~972~931-6787 p. 10
o~
~ 0 .~
m<
MACARTHUR l~O ULE VAig, D
HOOD DRIVE
/
Jul 28 04 08:48a DO~DEY.RHDERSO~&RSSOC. I~C (972)~31-6787 p. 11
Log of_Boring_ _
Location
a-1 SEE PLAN OF BORING
_i
?RO~UNOW~ ~TER INVESTiGATiON, BRIGHTON MANOR, MACARTHUR BLVD., COPPELL, TEXAS
I. ~ L-___ CONTINUOUS AUG~R
, -ho e caved in from 1.Y to 4.0*
~ -ve~ hard (auger re~sal) ~ 4.0
S-104-0172 Page I of1
ompletion ~p'pth '
4.0'
Date j Water Observations
__ 6/4/2004 WATER ENCOUNTERED ~ 1.0,:
GEE Cnna,,~t..~ ~