Loading...
Brighton Manor-CR040712Jul 28 04 08:50a DOWDEY.RMDERSOM&RSSOC.IMC (972)931-6787 .INSPECTION REPORT PROJECT: BRIGHTON MANOR (THE FALLS AT WESTMONT) OWNER:STREET REAL ESTATE~ LTD. CITY: COPPELL, TEXAS DATE: ?--/Z c¥ NPDES PERMIT NO. INSPECTOR: ~'. /~o.~,~.c,,~ I'ITLE: PURPOSE:,I~tWEEKLY [~-] STORM EVENT [_] INCHES EROSION AND i iN I EFFECTIVE SEDIMENTATION CONTROLS t C~-~onstruction Entrance Inlet Protection Interceptor Swales/Berms Silt Fence Straw/Flay Bales iVegetative Buffer Strips Other i COI~,','ORMAN(.'E 'LES NO NA YES NO NA .~ NO NA YES NO NA ~ NO NA YES -NO NA YES NO NA J L-~ NO NA YES NO NA ~'~3 NO NA YES NO NA NO NA NO NA [-YES NO NA ] cern fy under penal~ of law that this document and all attachments were prepared under my direcPon o~ supervision tn accordance ,,wth a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. ~ased on my mqmry of the person or person~ ,*,ho manage the system, or those persons directly responsible for gathering the information, the information submitted l, to the best of my knowledge and behef, true, accurate, and complete, f am ware that there are significant penalties tbr submitting false mform~tion, mclu~d~g the possibility of fine and ~mprisonment for knowing vlolarlons ' INSPECTOR: iz" DATE: (Signamre)