ST9302-CS040705Ken Griffin - Sandy Lake Page 1 ~
'5 o k
From: Ken Griffin
To: Orlando Domingo
Date: 7/5/2004 10:39:03 AM
Subject: Sandy Lake
Mr. Domingo
Thank you for your email concerning Sandy Lake. The contractor is still on the project, he's the one
making the changes to the ramps, and we are preparing a punch list for him. We have not accepted the
improvements nor finaled the contract for the construction of Sandy Lake. My inspector and I have walked
the project and noted several locations where the paving needs to be corrected. Most notably there is an
area west bound near where Cici's used to be and an area west bound near Woodcrest that need to be
removed and replaced.
The contractors intent is to resolve all issues on Sandy Lake at this time so the project can be accepted by
the City.
Ken Griffin
Director of Engineering
CMO- sandy Lake Road
From:
To:
Date:
Subject:
<Bgdomingo@aol.com>
<kg riffin@coppell.tx.us>
Fri, Jun 25, 2004 10:34 PM
Sandy Lake Road
i noticed that the newly paved sandy lake road has a lot of cracks and
potholes, i hope y'all can patch it or repave a section in order to smoothen it.
orlando domingo
CC: <cmo@ci.coppell.tx. us>