PA9702-LR 990621 (3) REPORT OF DRILLEb PIER INSPECTION
89~1 Carpenter Frwy., SuRe #100
DalI~,; Texas 75247
Date of Service: 06/08/1999 Report No.: 9915788 Report Date
06/2111999
Client No.: COPPELL Project No.: 94991118
Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr
Attn: Bra~Reid
732 DeForest 300 Block of Parkway Blvd
Coppell TX 75019 Coppell, Texas/Ptj. #96051
Services: Drilled pier inspection.
on this date, an HBC Engineering technician arrived at the above referenced
jobsite as scheduled for drilled pier inspection. Pier drilling operations were
cancelled at the jobsite.
Trip Charge: 2 hours
Technician: Terracon ~ E~ring, Inc.
Report Distribution:
(I) City of Coppcll (1) City ofcoppell - Engineering
(1) BrinkIcy Sargent Architects (1) City ofCoppell- Bldg. Insp. Paul D. Smith, P.E.
(t) Turner Engineers (1) City ofCoppell - Leisure Scrv Dcpt Senior Project Engineer
(1) Hisaw & Associat~
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC En~gineel'ing, Inc,
998S PaRe 1 of 1