Loading...
Jefferson-LR 950808ALPHA TESTING, INC. 2209 Wisconsin St,, Sulle 10o Dallas, Texas 75229 (214) 620-8911 0S. 14, 1995 16:44 MECHANICAL LIME STABILIZATION REPORT FINAL MIX TESTED fOR JPl TEXAS DEVELOPMENT, INC IRVING, TEXAS ' DATE 08/08/95 JEFFERSON ~ RIVER CHASE PROJECT COPPELL, TEXAS OUR REPORT NO, 94534-75A Area of Work: NEW TURN LANE, AND SOU'iH APPROACH OFF NORTH BOUND MacARTHUR BLVD. Date lime Inllially applied 08/05/95 Average final compacted depth: _ 6_~__~_ inches. Date of final mixing TEST DATA Sample Location S. APPROACH, 50' N. & 50' W. FROM __N.W. CORNER OF BL_DG. fl1 S. APPROACH, 50' N. & 100' W. FROM N.W. CORNER OF 8LDG. #1 TURN LANE, 50' $. & 1ID' W. FROM I~ ' N.W. CORNER OF BLDG. #1 % Passing % Passing I 1/2" Sieve ~4 Sieve lO0 62 100 64 100 63 Remarks: POst It "h - ,~rand fax transmittalmemo 7671 #ofp~g~s, ko. . -~A.'"--. ~ I-''"' J~-_ ALPHA TESTING, INC. 2209 Wisconsin SI., Suile 100 Dallas, Texas 75229 (214) 620-8911 DAILY FIELD REPORT TESTED FOR JPI TEXAS DEVELOPMENT~ INC. IRVING, TEXAS DATE 08/08/95 PROJECT JEFFERSON 8 RIVER CHASE COPPELL, TEXAS OUR REPORT NO, 94534-75 WEATHER: PARTLY CLOUDY TEMPERATURE RANGE: BO DATE: TO: 93 THE ALPHA TECHNICIAN TRAVELED TO THE PROJECT SITE AS REQUESTED BY THE CLIENT'S REPRESENTATIVE TO PERFORM CONCRETE TESTING, FIELD GRADATIONS, AND PRE-POUR INSPECTION. THE 1ECHNICIAN CAST THREE SETS OF FOR SLAB AT BUILDING NUHBER 15. PROJECT SPECIFICATIONS. A TOTAL OF SUBGRADE. FOUR TEST CYLINDERS FROM CONCRETE PLACED FIELD TESTING APPEARED TO COMPLY WITH TECHNICIAN TECHNICIAN REINFORCEMENT, AND POST TENSION CABLE LAYOUT. WITH PROJECT PLANS AND SPECIFICATIONS. THE DON JR. REPRESENTATIVE NAS INFORMED OF ALL TECHNICIAN RETURNED TO THE LABORATORY AND INSPECTION. THREE FIELD GRADATION TESTS WERE PERFORMED ON LIME STABILIZED SEE ATTACHED REPORT FOR ]'EST LOCATIONS AND RESULTS. PERFORMED A PRE-POUR INSPECTION OF BUILDING NUMBER 28. INSPECTED PAD FOR PROPER VAPOR BARRIER, FOOTING SIZE, STEEL ALL ITEMS APPEARED TO COMPLY TEST RESULTS. UPON COMPLETION OF SCHEDULED TESlING REPORT DISTRIBUTION: JPI Construction (2): Tim Rodgers, Steve Wilkens AECC, Inc. (1): David Oattom Henkle Engineering, Inc. (I): Terry Henkle Fu$ch Serold & Partners (1): Mark Sero]d INC. P.