Jefferson-LR 950808ALPHA TESTING, INC.
2209 Wisconsin St,, Sulle 10o
Dallas, Texas 75229
(214) 620-8911
0S. 14, 1995 16:44
MECHANICAL LIME
STABILIZATION REPORT
FINAL MIX
TESTED fOR JPl TEXAS DEVELOPMENT, INC
IRVING, TEXAS ' DATE 08/08/95
JEFFERSON ~ RIVER CHASE
PROJECT COPPELL, TEXAS
OUR REPORT NO, 94534-75A
Area of Work: NEW TURN LANE, AND SOU'iH APPROACH OFF NORTH
BOUND MacARTHUR BLVD.
Date lime Inllially applied 08/05/95 Average final compacted depth: _ 6_~__~_ inches.
Date of final mixing
TEST DATA
Sample Location
S. APPROACH, 50' N. & 50' W. FROM
__N.W. CORNER OF BL_DG. fl1
S. APPROACH, 50' N. & 100' W. FROM
N.W. CORNER OF 8LDG. #1
TURN LANE, 50' $. & 1ID' W. FROM
I~ ' N.W. CORNER OF BLDG. #1
% Passing % Passing
I 1/2" Sieve ~4 Sieve
lO0 62
100 64
100 63
Remarks:
POst It "h
- ,~rand fax transmittalmemo 7671 #ofp~g~s,
ko. . -~A.'"--. ~ I-''"' J~-_
ALPHA TESTING, INC.
2209 Wisconsin SI., Suile 100
Dallas, Texas 75229
(214) 620-8911
DAILY FIELD REPORT
TESTED FOR
JPI TEXAS DEVELOPMENT~ INC.
IRVING, TEXAS
DATE 08/08/95
PROJECT
JEFFERSON 8 RIVER CHASE
COPPELL, TEXAS
OUR REPORT NO,
94534-75
WEATHER: PARTLY CLOUDY
TEMPERATURE RANGE: BO
DATE:
TO: 93
THE ALPHA TECHNICIAN TRAVELED TO THE PROJECT SITE AS REQUESTED BY THE
CLIENT'S REPRESENTATIVE TO PERFORM CONCRETE TESTING, FIELD GRADATIONS, AND
PRE-POUR INSPECTION.
THE 1ECHNICIAN CAST THREE SETS OF
FOR SLAB AT BUILDING NUHBER 15.
PROJECT SPECIFICATIONS.
A TOTAL OF
SUBGRADE.
FOUR TEST CYLINDERS FROM CONCRETE PLACED
FIELD TESTING APPEARED TO COMPLY WITH
TECHNICIAN
TECHNICIAN
REINFORCEMENT, AND POST TENSION CABLE LAYOUT.
WITH PROJECT PLANS AND SPECIFICATIONS.
THE DON JR. REPRESENTATIVE NAS INFORMED OF ALL
TECHNICIAN RETURNED TO THE LABORATORY
AND INSPECTION.
THREE FIELD GRADATION TESTS WERE PERFORMED ON LIME STABILIZED
SEE ATTACHED REPORT FOR ]'EST LOCATIONS AND RESULTS.
PERFORMED A PRE-POUR INSPECTION OF BUILDING NUMBER 28.
INSPECTED PAD FOR PROPER VAPOR BARRIER, FOOTING SIZE, STEEL
ALL ITEMS APPEARED TO COMPLY
TEST RESULTS.
UPON COMPLETION OF SCHEDULED TESlING
REPORT DISTRIBUTION:
JPI Construction (2): Tim Rodgers, Steve Wilkens
AECC, Inc. (1): David Oattom
Henkle Engineering, Inc. (I): Terry Henkle
Fu$ch Serold & Partners (1): Mark Sero]d
INC.
P.