Loading...
SS9901-PR040402 iqPF:-132-2gk34 14: 53 Comtructloa Materials Testing ~d ~n~nmental Comul~ng Texas CMT, Inc. t0044 Monroe Drive Dallas, TJ:xas 75229 ' (214) 352-6957 Fax (214) 352-6972 www .texascmt.com EXHIBIT "B" April 2, 2004 Ms, Suzan C. Taylor C.I.P. Coordinator The City of Coppcli P. O. Box 9478 Coppell. Texas 75019 Via Fax: 972-304-3673 Proposal No. 240402 Construction Materials Testing DeForest Road Lift Station Improvements Force Main Lines "A" & "B' SS 99-01 Fax Note Dear Ms_ Taylor: In accordance with your request, we are pleased to submit the following proposal for materials testing and observation services for the above referenced project, Types of services are based on our April 2, 2004 telephone conversation with Mr. Rick O'Dell of The City of Coppell. We estimate the fees will be as follows: L_ABORATORY TESTING Moisture Density Relationships 6 tests (~ $170.00 per test .............................. $1,020.00 Atterberg Limits Test 6 tests (W~ $48.00 per test ................................. $288.00 Percent Material Finer than No. 200 Sieve 6 tests ~ $25.00 per test ................................. $150.00 Total Laboratory Testing ................................ $1,458.00 ,qPF,'-02-28(~4 14: 3,4 The City of Coppell P. (32 April 2, 2004. II. A. FIE! ,D TESTING AND OBSERVATION _E_arthwprk Testing Sampling Subgrade Soils 4 Hrs. ~ $40.00 per hour ................................. $160.00 In-Place Moisture Density Tests (assumes 70 tests, 15 trips) 70 tests ~ $38.00 per test .............................. $2,660.00 Trip Charges 17 trips ~ $25.00 per trip (4 hours or less) .................... $425.00 Total of Earthwork Testing .............................. $3,245.00 Portland Cement Concrete Testin~ Periodic Observation of Concrete Placement (based on 10 concrete placements) 30 Hrs ~ $40 00 per hour .............................. $1,200.00 Compressive Strength Concrete Cylinders (with Observation) (Based on 1 set of 4 cylinders per day) 40 tests (~ $20.00 per test ................................ $800.00 Trip Charges i0 trips ~ $25.00 per trip (4 hours or less) .................... $250.00 Total of Concrete Testing .............................. $2,250.00 Total of Field Earthwork and Concrete Testing .............. $5,495.00 TOTAL OF ALL OBSERVATION AND TESTING SERVICES ..... $6,953.00 Based on the assumptions our total estimated fee to perform the aforementioned tests and services is $6,953.00. It should be noted that this proposal is based on the estimated number of tests and quantities mentioned in this proposal and not a lump sum price. The construction sequence or job conditions may' require more or fewer testing or observation. Only work which is actually performed wilt be charged Ibr and all charges will be in accordance with the corresponding unit fees quoted in this proposal or our Schedule of Fees. Texas CMT, Inc. Proposal No. 24040?, Page 2 ~1PP-02-2004 14:34 P.03 The City of Coppell April 2, We understand we have been selected tbr this project and therefore, when providing this estimate, vve are not in violation of the engineering laws governing procttrement of professional engineering contract with pablic entities. If this proposal is acceptable to you, please sign the enclosed copy, along with the Agreement for Materials Eng~neermg and Related Constructto Observation and Materials Testing Services, and mail it to us at your earhest convenience. We trust the information provided herein is sufficient for your ase. Should you have any comments and/or questions, please do not hesitate to contact us. We are looking forward to working with you. Sincerely, Texas CMT, Inc, Construction Materials Engineering Division Richard W. Gee, P.E. President AS:RWG/dwe Enclosure cc: Mr. R/ck O'Dell - The City. of Coppell Texas CMT, lne. Proposal No. 240402 Page 3 AGREEMENT FOR MATERIALS ENGINEEP, YNG AND RELATED CONSTRUCTION OBSERVATION AND MATERIALS TESTING SERVICES THIS AGREEMENT is by and between: MS- Su~an C. Taylor C.I.P- Coordinator. The Cit of Co ell P. O. Box 9478 CoDpell, Texas 75019. hereinafter called CLIENT and Texas CMT, Inc.. a Tex~ corporation, hereinafter called Texas CMT, who agree ~ follows: 1. DECLARATIONS. CLIENT desires to engage Texas CMT to provide Materials Engineering and feinted construction observation and materials testing services in connection with CLIENT's project ("THE pROJECT") described as follows: Construcgion Materials D~eForest Road Lift Station Im~orvementS. Force _I~.m{n Lines ~*A" & s_s 99-0x Texas CMT has submitted a fee schedule to CLIENT, a copy of which is attached hereto and made a part hereof as Exhibit "A', for Materials Engineering and related construction observation and materials tes6ng services, which fee schedule is acceptable to CLIENT. 2. SCOPE OF WORK. Texas CMT shall provide Materials Engineering and related construction observation and materials testing serVices for TI-I~ PROJECT in accord~mce with the accompanying - ~ ' ' de proposal scopeotservccs ma aparthereofasExhibitBandthe"termsandconditions"$etforth on the back of and made a part of'~his Agreement. P. 04 EXECUTED TI-IlS __ day of CLIENT By: Title: ., 2004. By: t_-/~$'~r' ~ ~-'r'--~ Title: President Date: ~',]¢¢"~l' TO BE COMPLETED BY CLIETNT FOR pAYME-NT OF SERVICES: City_ , State Attention; Title: Zip Code: ~ Phone No. FOR APPROVAl. OF ff4VOICE($): Address: _Zip Codc: -- Phone No. PERSON OI~ FIRM TO ACT A.S CLIENT'S REPRESENTATIVE WI'D; RESPECT TO Texa~ CMT'S SERVICES PERSONS OR FIRMS All'f HORIZED TO RECEDdE COPiES OF T~xas CMT'S OBSERVATION AND TEST R£PORTS: Ri~LAT£D CONSTRUCTION OBSERVATION AND MATERIALS TESTING SERVIC]SS ARflCLE I SERVICES: Texas CMT w/Il I [ Att tbr C LENT in a professional manner, using that degree of care and skill ord nar v exercised b~, and cons s~cnt wi~h the slal~datds of thc profession I 2 ?rovid¢ anl¥ tho ~.c services that, in thc opinion of Tex~ CMT, lie width ARTICLE 2 CLIENTS RESPONSIBILITIES: CLIENT er his ~TIC[ E 30ENE~I. CONDII'ION$: 3 [ Tcx~ CMT, by thc perforlnanc~ ofsc~ce~, covered hereunder, d~ ~ot in 3 3 T~a~ CMT ia not authori~d ~ r~ok~ alit. r~{~, ~rgc or P. [55 34 35 3,6 a rove or accept any pon' on of thc work, untess specifically authorized jn PP~ ~ CLIENI' or his authorized r~prcs~ta ye. Texas CMT ~h~ll ~ nation da~ ~d ~ e CLIE~ shall be p~Med w~ a ~p~ ~ in Aflicle 1. I above. No o~¢r w~TY, expr¢ss~d 0r implied, Is Tcx~ C~ sh~l secu~ ~d maln~in throu[hout thc &il period of d~k~ o[ ~ d~ge as may ~lse flora ~e perforce of $~s under · is A~t. Tc~ CM'I' will. ~pon ~qucsg file ~mfi~tion in~mn ~ 'l~s CMT for any loss, ~am~e or abiliW arising from any b i~ ~d <y c aim ~s~ed against Te~ CMT unless it ~ll be d~ned vet kind or c, which may b~ ca~i~ by T~m CMT. 42 No msu~c~, ofwha~ ~ ..... ~ to bc considered m in any way h~tln~ ~e con~C~r?r~t~7~ ~w~rk resvons bili~' for dmgcs resulting worn OlS opcratlOn~ or t~r AR~CLE 5 PAYMENT: 5,1 CLIENT will pay TeXM CMT for so.ices md ex~ns~s in ~coM~ 5 2 We~ CMT shall be paid in ~H for all services und*r~e ~e CLIENT's obligation m pay t~r ~¢ work co~gd B M no plcfion of~e proJect ~TICLE 6. E~ENT OF AG~EMENT CMT. ~TlCLE 7 ~pLIC~LE LAW: TOTAL P.05