Old Townhomes-CS040806Mr. Kurt Jones Carbon Landmark, LLC 1701 N Collins Blvd, Ste 1200 Richardson TX 75080-3586 RE: Old Coppell Townhomes COPPELL ~ August 6, 2004 Dear Mr. Jones: I have seen no activity on the referenced project for some time. For that reason I am including a list of items that must be addressed prior to the final walk-thru. 1. Grade the area around the outfall of the 33" storm drain. 2. Place rock riprap as per plans. 3. Remove spoils, broken limbs and stumps, construction debris and grade area over the outfall storm drain system. 4. Clean storm drain system. 5. Backfill curb and shape parkway to final grade. 6. Clean streets. 7. Turn the interior fire hydrant to face the street. 8. Set meter cans. 9. Pour concrete pads around sanitary sewer service clean-outs and water valves. 10. Backfill west of Coppell Road. 11. Remove existing utility pole from entrance and pour concrete. 12. Provide a permanent solution to the ponding on the north side of the site. 13. Provide permanent erosion control protection. 14. Grade the barrow ditch along the east side of Coppell Road. This is not a complete list of items that must be addressed prior to final acceptance. This list is provided to assist you in preparing for the final walk-thru. If you have any questions, please contact me at (972) 304-3685 at your earliest convenience. Sincerely, Garreth D. Campbell Construction Inspector # of Post-it* Fax Note 7671 °ate~//O/~'~ Ipagesl' ! Ken Griffin, P.E., Director of Engineering & Public Works Keith Marvin, P.E., Civil Engineer Glenn Hollowell, P.E., Asst. Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal T H E C I T Y O F CO?PELL Mr. Kurt Jones Carbon Landmark, LLC 1701 N Collins Blvd, Ste 1200 Richardson TX 75080-3586 August 6, 2004 RE: Old Coppell Townhomes Dear Mr. Jones: I have seen no activity on the referenced project for some time. For that reason 1 am including a list of items that must be addressed prior to the final walk-thru. 1. Grade the area around the outfall of the 33" storm drain. 2. Place rock riprap as per plans. 3. Remove spoils, broken limbs and stumps, construction debris and grade area over the outfall storm drain system. 4. Clean storm drain system. 5. Backfill curb and shape parkway to final grade. 6. Clean streets. 7. Turn the interior fire hydrant to face the street. 8. Set meter cans. 9. Pour concrete pads around sanitary sewer service clean-outs and water valves. 10. Backfill west of Coppell Road. 11. Remove existing utility pole from entrance and pour concrete. 12. Provide a permanent solution to the ponding on the north side of the site. 13. Provide permanent erosion control protection. 14. Grade the barrow ditch along the east side of Coppell Road. This is not a complete list of items that must be addressed prior to final acceptance. This list is provided to assist you in preparing for the final walk-thru. If you have any questions, please contact me at (972) 304-3685 at your earliest convenience. Sincerely, Garreth D. Campbell Construction Inspector CC: Ken Griffin, P.E., Director of Engineering & Public Works Keith Marvin, P.E., Civil Engineer Glenn Hollowell, P.E., Asst. Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal 255 PARKVVAy * P 0 80X 9478 * COPPELL TX 75019 * TEL D72,d62 0022 ~ FAX 972/304 3673