Loading...
SS9901-CS040707TurnerCollie( Braden Inc. Engineers · Planners · Projec! Managers July 7, 2004 TC&B Project No. 052131124.0001 David Holland Senior Vice President Mastec North America, ]nc. 4747 Irving Blvd., Suite 221 Dallas, Texas 75247 Re: City of Coppell Deforest Road Lift Station Improvements Force Main Line D Project No. SS 99-01 Dear Mr. Holland: This letter is in response to your letter of June 24, 2004, regarding concerns related to performance of the SDR 17 high density polyethylene (HDPE) pipe specified for this project. We have reviewed the proposed pipeline profile based on the approximate access pit locations provided with your bid and have verified our calculations for pipe performance under the following conditions: · Construction / pipe installation (short-term condition) · Normalpipeline operation (long-term condition) · Pipeline repair/maintenance (short-term condition) The pipe must be filled with water prior to installation in accordance with the project specifications, and deep portions of the bored sections need to be kept full of water during construction. However, the more shallow sections at the access pits (at the beginning and ending of each bored section) can be empty during construction without adversely impacting pipe performance. Calculations for normal pipeline operation and short-term repairs/maintenance indicate the pipeline will perform as designed under these conditions. If you have questions or require additional information, please call me at 972-735-3056. Sincerely, Erika K. Cooper, P.E. Project Engineer cc: Ken Griffin, P.E. - City of Coppell