St Joseph-CS020612 (2)CENTEX
CONSTRUCTION COMPANY
Our Vision.* To be the Standard of Measure in the Markets we sera.'e.
Date:
To:
I From:
Project:
i Subject:
June 12, 2002 02:59:01 PM
Garreth Campbell
The City of Coppell
P. O. Box 9478
Coppell, TX 75019
Monica Moore
Project Engineer
St. Joseph Village
Coordination Meeting: City o£ Coppell
Telecopy (FAX) No:
972-304-3570
Hard Copy to Follow No
Remarks
Please find attached the minutes ~omthe coordination meeting atthc City of Coppellon
Jane iI, 2002.
Ifyou Do Not Receive 4 pages(includingthis one),Plcase call Sender at214-468-4546
Operator sending FAX message from FAX # 214-468-4340
t,O-'TO'cJ TT,SE ££2 ~L6 ~UG - NOI±DFi;d±SNOD X~±N~D G~:~T ~I210P~-UI-NffI£
TT6~ ££U EL6
Meeting Type
Meeting #
Location
St. Joseph Village
Coordination Meeting
Coordinataon Meeting Date 06/11/2002 at 01:00 PM
008
Ctty of Coppell
Attendees
AGUIRRE Corporation: Mikc Millican
Centex Construction Company: Anthony Lauchner
Centex Construction Company: Forrest Harmon
Centex Construction Company: Mopica Moorc
Centex Construction Company: Ryan Roberts
Cooper Excavation: Earl Cotton
File, AGUIR_Ri5 Corporation: Gary Roden
Utilities 06/1[1/2002
008,001 Centex
Constructl
on
Company
008.002
008.003
Oncor Energy Delivery: JeffCurry
The City of Coppell: Oarre/h Carapbcli
The City of Coppell: Lee Stose
Verizon: Robert Holland
C Con Services: Janes Scott
Jeff Curry (Oncor) stated that the power will ~e brought
into the project site in two separate lines and the gas is to
run down 5he south side of Star Leaf Rd.
Anthony 9tared that he would like to arrange a meeting
between Oncor, FOX, Aguirre, and Centex for later this week
Jeff Curry suggested that Rick Fielding (with Oncor Energy
Services} be invited in addition, because he i~ the designer
and estimator for the $~ Joseph Village Project.
AGUIRRE Telephones 06/11/2002
Corporati
Robert Holland (Verizon} stated that he has received the
preliminary plans, but he needs a final set of plans showing
the easements available for veriz0n, Mike Millican asked if
Verizon could share an easement with TXU. Verizon indicated
they could share an easement as long as TXU was in agreement
for the easement to be used by them in addition to TXU. Bob
Holland no:ed nhat the telephone lines need to be at least 2'
from the electric lines. Mike Millican will follow-up to
confirm approval o~ shared easements and make an amendment to
tho plat. Centex noted that AT&T ~roadband will need
easements also. In review Verizon will provide wiring from %he
property line to a wirin~ closet in each building pad. Centex
will provide conduits and pull boxes as needed for their
access. Centex to schedule a meeting in next few weeks with
Verizon to review telephone conduit layouts. Verizon also
pointed OUt that access from wirin~ closet in main building ~o
~uture additions would be required, wiring from cottage
wiring closet to all devices is by Centex.
Sehedulemnd Review of Plaes 0~11/2002
Constructi
Company
Pr3/UO'd II6E ££2 EL6 9~ - NOI±Dn~±SNOD ×BllqBJ ~2:~I 2002--~I ~ll-li
008.004
008.005
008.006
008.007
Cooper
Exeavatio
n
Anthony stated that the cottage MEP designs should be complete
in two weeks, at which point the city would be able to start
their permit review Per a meeting with the city a few months
ago the fire alarms, sprinklers, irrigation, and trusses may
be submittals af~e~ the permit review~ Centex will submit
everything available with the permit paekage, Lee Stone,
asked if he would have to review the plans all at once.
Anthony state that the permit package will include 30 cottages
and the site services for these, but that there are only three
separate floor plans. He then stated that Centex currently
has approximately 6 building Dads completed, Centex will be
ready to start underground MEP upon receipt of a building
permit and the east fire loop around the cottages will be
complete before framing of the initial cottages begins.
Centex noted that construction of the Phase 5A cottages,
design ~or Phase lB main apartment building would he submitted
for a foundation and underground permit, with ~he intent to
have the main building foundation complete prior to completion
of the cottages. Other that foundations, the main building
construction can ~ot start until the 30 cottages are complete.
Wate~Sanitarylssues 06/11/2002
Cooper
Exeavatio
B
AGUII~E
Corpuratl
Constructi
Company
Earl Cotto~ stated that all water and sewer will go in
simultaneously.
Garreth Campbell asked if Cooper was installing the Force
Main.
~arl Cotton replied that they are installing the Force Main,
but that the pipe was four weeks away, and they will start as
soo~ aa it arrives.
Garreth Campbell asked if there were any specifications for
the Force Main, because he has not seen any. Centex noted that
there specifications for the Force Main were provided by
Turner Collie and Braden and the spec. is for epoxy-lined
ductile iron.
Garreth Campbell questioned the depth o~ the water line st
Star Leaf connection to Sandy Lake, Forrest responded that the
valve stem is 3' below the exietin~ ground
Asphalt Paving 06/11/2002
Garre=h Campbell asked where the paving was to stop- Mike
Millican replied that there was to be temporary asphalt paving
approximately 186' from gandy Lake Road.
Complete Plans 06/11/2002 06/12/2002
Garreth Campbell asked Mike Millican how close Aguirre is t¢
completing the civil Drawings. Mike Millican stated that he
would have the completed set to the City of Coppell tomorrow
(June 12, 2002). centex inquired as to the review =ime
required, Garreth could not commit for additional people that
have to review but thou~h~ it would be reasonably quick due to
the previous reviews.
Raw Material Movement 06/11/2002
008.008
008.009
008.010
Cooper
Excavatio
Cooper
Excavatio
Cooper
Excavatio
Forrest asked Garreth Campbell if he could move ~he raw
materials (Pipe) to the site immediately, and Mr. Campbell
responded that he could begin anytime he was ready.
Garreth Campbell then questioned Cooper (Earl Cotton) as to
when he was planning on moving his equipment to the site.
Earl Cotton responded ~hat they would mobilize imme~iately~
Anthony stated that he anticipates beginning the laying of
pipe by Friday if documents were approved. Garreth indicated
no pipe could be laid until approval was provided.
WaterLine Testing 06/11/2002
Garreth Campbell stated that Cooper should keep in mind
that they must flush, chlorinate, and sample all lines by
means of pumping. Coppell does not allow the testing/flushing
of the systems through the valves.
Dirt~lovement 06/11/2002
Anthony asked Garreth Campbell as ~o whether it is Okay for
Cooper to begin moving dirt for the box culvert immediately.
Ear Cotton stated that, since the box culverts will not arrive
until early August, they will ensure that the ditch for the
box culvert will drain. Cooper also stated that if needed,
they will add rock at the end of the ditch for storm water
pollution. Garreth Campbell agreed , as long as no pipe is
laid until the Civil Drawings are permitted by the City of
Coppell.
%Vater Detail 06/12/2002
Mike Millican stated that he did not include a detail in the
plans, refer To city standard detail. Garreth Campbell added
that ~4 gauge blue Tracing wire was required and should be
loeped up the os=side of the valve boxes, sand is required
over and 12" under pipe. Earl Cotton wan=ed to know whether
the %racing wire should be inside the val~e boxes where the
boxes are ~n pavement. Garreth indicated the city does
want the wire inside the valve boxes. Garreth also added
that green insulated tracing wire is to be used on the sewer
lines.
Thc above constitutes the writer's undcrstanding of the ilerns discussed and the decisions made, If there arc any
errors or omassionz, please contact Ccntex iu writing within five business days.