Loading...
PA9702-LR 990621 (4)CONCRETE COMPRES sIVE STRENGTH TES _ 8901 Carpenter Frwy., S~te ~1~ DnlI~ T~ 7~7 Date of Service: ~/03/1999 Repo~No.: 9915305 Re~rtDa~ 06/21/1999 Client No.: COPPELL Proj~t No.: 94991118 Client: City of Co poll Proj~t: Cop~ll Aquatic~ecrea~on ~ Attn: BradReid 732 ~Forest 3~ Bl~k of P~kway Blvd Cop~ll TX 75019 Cop~ll, Texa~. ~51 Service: Obtain samples of fresh concrete at ~e placement l~ations, ~o~ r~uir~ field test ~d cut compressive s~ength samples. PROJECT DATA CO~rrRACTOa: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRE~ESVrrLma: N/A pLACEMENTDATE: 06/03/1999 BATCH TIME: 10:25arn rLA~rr: N/A T~SAMP~En: ll:15am aV: ShaneSpinks SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Sullny, warm, windy STRENGTH: 3000 psi @ 28 Days TEMPERATURE (v) - Am N/A F CONCRETE: N/A r SLtrMP: 3-5" TaVCK NO: N/A TICKET sO: N/A AIR: 3-5% AreCONTENT(%): 3.1 UNrrWEIGHT(pci): N/A TEST METHOD: ASTM C- 143 eLAcD, l~rr LOCATION: Approach ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATn~ YARNS: xo CYLINDER MEASURED MAXIMUM COMPRESSlYE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTt/RE SET NO. (inr, hes) TESTED (days) (Ibs. force) (psi) TYPE I 1 4.75 06/10/1999 7 126720 4480 1 2 4.75 06/10/1999 7 130650 4620 Avenge 4550 1 3 4.75 07/01/1999 28 I 4 4.75 07/01/1999 28 Sample location: North approach 10' south x 5' west of northeast corner. Technician: Shane Spinks Started: 10:00arn Finished: l:00pm ~ ~ Engine nc. Report Distribution: (l) City of Coppelt (1) City ofCoppetl - Engineering ( I ) BrinkIcy SatSent Architects ( 1 ) City of Coppoll - Bldg. lnsp. Eug (I) Turner ~agincers (1) City of Coppoll - Leisure Serv Dept Vice President (I) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall no~ be reproduced except in full without die written approval of HBC Engineering, Inc. 0ILL Page I of I