From: Suzan Taylor
To: Infosys
Date: 8/13/2004 9:41 AM
Subject: Re: Fwd: Sandy Lake Rd.
Hr. Gordon:
The original contractor for Sandy Lake Road, from Denton Tap to Kimbel Kourt, is correcting deficiencies in the
construction of the roadway that were identified in the punch list. These corrections include bringing the
sidewalk, ramps and crosswalks into compliance with the Texas Accessibility Standards and correcting base and
concrete paving failures. Should you have any more questions or need any additional information, please let me
know.
Suzan Taylor
CIP Coordinator
Engineering Department
972-304-7019