Loading...
ST9302-CS040813Suzan Taylor - Re: Fwd: Sandy Lake Rd. Page 1 of 1 q .-0'2__ From: Suzan Taylor To: Infosys Date: 8/13/2004 9:41 AM Subject: Re: Fwd: Sandy Lake Rd. Hr. Gordon: The original contractor for Sandy Lake Road, from Denton Tap to Kimbel Kourt, is correcting deficiencies in the construction of the roadway that were identified in the punch list. These corrections include bringing the sidewalk, ramps and crosswalks into compliance with the Texas Accessibility Standards and correcting base and concrete paving failures. Should you have any more questions or need any additional information, please let me know. Suzan Taylor CIP Coordinator Engineering Department 972-304-7019 >>> Infosys 8/13/2004 8:59:07 AM >>> >>> "Greg Gordon" <fiashg@comcast.net> 08/12/2004 8:56:51 plVl >>> What on earth are they doing to Sancty Lake and why? Best regards; Greg Gordon 745 Eagle Dr. 972-393-0393 file://C:kDocuments%20and%20SettingsXstaylorkLocal%20Settings\Temp\GW}00001.HTM 8/13/2004