Loading...
Brighton Manor-CS040816To: Rodney @ Dowdy Anderson From: Suzan Taylor City of Coppell Fax: 972-931-6787 The letter generally needs to state the following and not necessarily in the order that they are presented. In lieu of a maintenance bond the owner wants to provide an escrow fund for the installation of erosion control devices. Explain how the amount of the check was determined. 2. That a TPDES General Permit for Construction has been submitted to the TCEQ for the construction of this project. 3. is the owner of the development.located at the intersection of Samuel and MacArthur in Coppell, Texas. Brighton Manor is classified as a 'Common Plan of Development' under the TPDES General Permit for construction. There are 26 lots in the subdivision that will be developed, and a common area, sidewalk and screening wall that will be constructed simultaneously or on different schedules that are part of the common plan of development. Erosion control best management practices shall be maintained within the development until such time that final stabilization as defined in the construction permit is attained. 6. Inspection reports for the erosion control devices as set forth in the construction permit shall be made available to this office on a bi-monthly basis.