Brighton Manor-CS040816 (3) MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To:
From:
Date:
RE:
Larry Davis, Construction Inspector Engineering
Cody Wildoner, Brent Adams, Streets Division Public Works
August I6, 2004
Walk-Thru Brighton Manor Friday, 8/13/04
PAVING:
2.
3.
4.
5.
6.
Rout & seal water tie-in at Hood/Samuel.
Rout & seal water tie-in at Duncan/Samuel.
Clean out drop inlets marked with paint.
Steel sticking out of concrete north of second median on Duncan.
Backfill drop inlet.
There are 3 medians in subdivision with no burtons. Buttons need to be installed by
contractor.
Post-R* Fax Note 7671 Date ~/~7//0 gflp~a~f~s · /
Co./Dept.~/~ ~ ~ rSOC Co.
Phone ~ Phone ff
/
Post-it® Fax Note 7671 Date~'//7/'/~ ~7~P~a~fes' /
*o ~co~&~evr74c-~ ~rom /~.~OZ~? PAY/
Phone ~ Phone ~
CIT}' OF COPPELL PUBLIC WORKS DEPARTMENT