Loading...
SS0201-LR040714ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 IN-PLACE DENSITY TESTING Client: Project: City of Coppell Ms. Suzan Taylor PO Box 9478 Coppell TX 75019 Service Center Sanitary Sewer Project SS 02-01 Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA Report No.: 213020 Project No.: 049073 Date of Service: 07/07/2004 Report Date: 07/14/2004 CONTRACTOR: Fox Contractors Test Methods: ASTM D-2922 ASTM D-30! 7 No. Description Dark Brown Clay Brown Tan Silty Sandy Clay Gauge: Troxler 3430 Moisture Gauge Serial No: 25249 Current: 664 Test Mode: DT Previous: 642 MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf 22.5 Standard Counts Density Current: 2474 Previous: 2458 Project Requirements Moisture Density 96.5 Optimum +4 95 min 12.5 117.0 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE NO TEST LOCATION DEPTH M/n MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (poi) (pc0 (% max) Utility Trench Backfill 1 18" sewer, Station 16+50, 9' below grade 6" 1 Utility Trench Backfill 2 18" sewer, Station 16+45, 7' below grade 6" 1 Utility Trench Backfill 3 18" sewer, Station 16+40, 5' beow grade 6" 1 Utility Trench Backfill 4 18" sewer, Station 16+40, 3' below grade 6" 1 Utility Trench Backfill 5 18" sewer, Station 16+40, 1' below grade 6" I Utility Trench Backfill 6 18" sewer, Station I6+35, final 6" 1 24.6 120.2 96.5 100 23.3 119.4 96.8 100 26. ! 118.4 93.9 97 23.0 119.6 97.2 101 24.7 120.3 96.5 100 25.5 121.4 96.7 100 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We zssumc no responsibility for variation in quality (compost on, appearance performance, etc.) or any other feature of similar subject matter provided by pemons or conditions over which we have no control. O~r letters ~and reports are for the exclusive use of the clients to whom they are addressed and shal not be reproduced except in full without the wriilen approval of Rone Eng ricers, Lta. 07DD Page I of 2 ineers Report No.: 213020 ll Project No.: 049073 Client: City of Coppell Technician: Dan Rogers Report Distribution: (1) City of Coppell (1) City of Coppell Test results on this report meet project specification. Ron~ Started: 2:45pm Finished: 4:45pm Stark Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc ) or any other feaedre of similar, sub. j e. ct ,.rnatt~,r provide, d by, personis..or ~c ,o,n.d. !..t.i, .o~n.s.` o~ e~r..w~h.i ?. aWne~oaVvealnoOf~on~eo~nOe~nr elee~.e~t~d 07DD Page 2 of 2