Loading...
Four Seasons 2R-CS040816From: To: Date: Subject: Keith, Hardy McCullah <hardyl@airmail.net> Keith Marvin <kmarvin@ci.coppeEtx.us> 8/16/2004 5:30:42 PM Re: BCE Specialties - Sandy Lake @ Royal Lane Find herein, the meeting minutes by Beth Cunningham. We would like to go over them in our meeting with you. Also, please let us know the meeting room and address. Thanks, Norman csm NOTES FROM MEETING: Present: Kyle, Hardy, Beth, Marcy and Matt 1) Royal Lane. Question from Owner: Any additional road impact fees, etc for improving this site as it relates to Royal Lane? Response from Matt: No, No additional anticipated 2) Sandy Lake: Same Question: No, Both roads are on Capital ,,-'~ Improvement Schedule 3) Storm impact fee's No further fees are expected. A schedule was produced depicting the schedule for the Road improvements along Sandy Lake/Royal. Schedule was used to coincide construction documents (tie-in's to city drainage plans, and schedule of construction ~ to coincide with city's) -'/Median opening discussed. Only one allowed between N Point and Royal. 500-600 feet for Median. Matt discussed allowing for plat of fire lane FURTHER DISCUSSION OF STORM DRAINAGE: -Sandy lake city plans include storm drainage for both Sandy Lake and Royal. Drainage at Sandy to include Large Drainage on north side of road. Royal drainage on West side of street. Matt discussed the 7x3 drainage must be contiued to connect to Royal Owner asked if there would be an owner fee for this, and Matt responded he did not believe there would be a fee, however the owner would need to tie into city planned drainage at the Royal side by either going under Royal, otherwise current drainage (exposed ditch) running across property would need to tie into the city planned drainage at Sandy Lake. ~.~"" Owners choices are: divert drainage to West side of Royal, or locate drainage to tie into City planned Sandy Lake drainage on South Side. Option to keep open ditch drainage discussed. City proposing to keep open drainage at North Sandy Lake, so anticipated the city would accept open ditch if we were to propose Design of building per Matt must be a percent stone if more than 100 ft of articulation. Color board required Keith Marvin wrote: > Norman, > Please provide us a copy of the meeting minutes that you would like to > discuss. > Consider this a confirmation of the meeting scheduled for the 18th. > Keith R. Marvin, P.E. > City of Coppell > (972) 304-7044 > kmarvin@ci.coppelLtx.us > > >>> Hardy McCullah <hardyl@airmail.net> 8/13/2004 9:44:33 AM >>> > We would like to confirm a meeting scheduled for 9:00 AM, Wednesday, > August 18, 2004. > > We would like to discuss the following items: > * Meeting Minutes of March 11, 2004 > o persons present at that meeting - Keith Marvin and Marcie > Diamond > * Current Sandy Lake Road Improvement Schedule > * If Sandy Lake Improvements do not take place, what are the City > requirements for development drainage issues. > * Review "Owner Bank"lSpecific impact fees eligible for credits. > Thanks, > Norman Coates > csm > Hardy McCu[lah/MLM Architects, Inc. > 12221 Merit Drive - #280 > Dallas, Texas 75251 > 972.385.1900 > 972.385.1937 CC: Marcie Diamond <mdiamond@ci.coppell.tx. us>