Loading...
ST9302-CS 940728dallas wa/er u/ill/les City Hall · Dallas, Texas 75277 · 214/670-3146 July 28, 1994 Steven G. Goram Director of Public Works City of Coppell P.O. Box 478 Coppell, Texas 75019 Dear Steve: Dallas Water Utilities has reviewed the paving and drainage design plans for Sandy Lake Road (from Old Denton Tap to MacArthur) provided on June 28 by the City of Coppell's engineering consultant Greg D. Saunders, Rady & Associates. A copy of the project report indicating the review comm.~ents is attached. Please consider these comments in your design and contact me if you have any questions or comments. Dallas Water Utilities' primary concern is the estimated 3 months time required to construct the proposed 30' water main relocation in the same alignment as the existing main. Following this'Scenario, it appears that a 3 month shutdown of supply through the 30' main to the Town of Flower Mound would be required. We are currently looking at the anticipated water demands that we would expect Flower Mound to have during the winter months, with the idea that Flower Mound could possibly be supplied for this time through a connection to the Lewisville system. However, this is a very precadous~ to place one of Dallas Water Utilities' wholesale customers in, and operation~~ are not in favor of it. Please detail your intentions re(~ardin.q maintain;~'' ~f through the 30' main while it is t(~ be placed out of service. Of course, the possibility still exists that the Lewisville supply will prove to be inadequate. If this is the case, then other alternatives, such as realignment of the relocation, must be considered. I will let you know the results of our evaluation of Flower Mound's winter-time demands and the supply available from Lewisville as soon as it is completed. A city utility providing Dallas with water purification and distribution, waste water collection and treatment July 28, 1994 Steven G. Goram Page 2 Dallas Water Utilities' engineering review staff is available to provide more detailed information and discuss and resolve the review comments with Coppell's engineering design consultant. Please feel free to call me or Phil Boyd to make the arrangements. Sincerely, W. David Rybum Manager Wholesale Services pb attachment C: Greg Randy Nelson, Dallas Water Utilities PROJECT REPORT DALLAS WATER UTILITIES DEPARTMENT WATER AND WASTEWATER INVOLVEMENT IDATE: July 21, 1994 TO:DAVID RYBURN, MANAGER - WHOLESALE SERVICES DIVISION THRU DANIEL V. SALDANA, P.E., MANAGER - PIPELINE RELOCATIONS PROGRAM PROJECT DESCRIPTION: Sandy Lake Road from Old Denton Tap to MacArthur Boulevard REFERS TO FILE NUMBERS: Job No. 93021.00 Sheets 34 - 55 RECEIVED OR STAMPED: July 1, 1994 REQUIRED WORK: 1. Routine adjustments of DWU facilities are required in advance of paving construction. m Appurtenance adjustments of DWUfacilities are required in conjunction with paving construction. Replace approximately 5370 linear feet of existing 30" water transmission main at seven different locations to clear the proposed paving. REMARKS: The proposed T.U. Electric transmission poles appear to be in conflict with DWU's existing/proposed 30" water transmission main at the following locations: SHEET # STATION 35 5+40~ 42 40+16~ 43 46+28~ 45 58+45~ 47 65+33~ The proposed street lights appear to be in conflict with DWU's existing/proposed 30" transmission main at the following locations: SHEET ~ STATION 35 6+28~ 35 8+78~ 37 16+44~ 40 34+97~ 42 41+25~ 42 44+23~ 43 45+82~ 43 47+52~ 44 50+90~ 44 54+28± 45 59+25~ 46 62+50~ 47 67+60~ PAGE I OF ,.3 10.04(g30~) CONTINUATION WATER AND WASTEWATER INVOLVEMENT July 21, 1994 PROJECT DESCRIPTION: Sandy Lake Road from Old Denton Tap to MacArthur Boulevard ~REET # STATION 48 72+80~ 48 74+30~ 50 80+60~ 54 104+38± 55 105+90~ 3. The proposed storm sewer laterals are in conflict vertically with DWU's existing 30" water transmission main at the following locations: PIPE SIZE SREET # STATION 21" RCP 43 46+12~ 21" RCP 47 65+25~ Please re-design the proposed 21" storm sewers to clear our existing 30" water main by 1.0' vertically. SUMMARY: 1. Ail items such as, closure sections, test fittings, etc., must be called out and drawn on the design plans for DWU's 30" water main. 2. Include a manhole with blowoff and flap valve at low points of the proposed 30" water main. ® Ail appurtenance notes pertaining to the proposed 30" water main need to be referenced to DWU's Drawings, Details and Standard Appurtenances for Water and Wastewater Pipe Construction Methods, dated March, 1991. The plans indicate that the proposed 30" water main will be constructed in the same alignment as that of the existing 30" water main. I estimate a three month shutdown of the 30" water main in order to accomodate this type of construction. Will the City of Flower Mound have sufficient water supply for its residents during the construction period? Please coordinate with T.U. Electric in order to alleviate conflicts between their proposed transmission poles and DWU's existing/proposed 30" water main. 6. Please contact the proper agency regarding conflicts between the proposed street lights and DWU's existing/proposed 30" water main. PAGE 2 OF 3 10.04(93o;) PROJECT REPORT CONTINUATION DALLAS WATER UTILITIES DEPARTMENT WATER AND WASTEWATER INVOLVEMENT DATE: July 21, 1994 PROJECT DESCRIPTION: Sandy Lake Road from Old Denton Tap to MacArthur Boulevard 7. If you have any questions, please contact me at 948-4590. Section Manager Relocations XC '- G. Woodson M. Rickman ~/-~ ~ PAGE 3 OF 3 10.04(~o~) 'TI '