Loading...
DR0301-LR040812RoneEn ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Roth-nay, StP. 150, ltouston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Ms. Suzan C. Taylor PO Box 9478 Coppell TX 75019 Project: Shadow Ridge Estates Retaining Wall Services: Report No.: 213207 Project No.: 048967 Date of Service: 07/09/2004 Report Date: 08/12/2004 Coppell, Texas Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA MEASURED STRENGTII: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Craig Olden, Inc. CONCRETE SUPPLIER: Lattimore PL.~qT: 3 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 5" maximum NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-I064 ASTM C-1231 ASTM C-39 except 9 ] 2 MIX DESIGN I.D.: 9065 PLACEMENT DATE: 07/09/2004 WEATHER CONDITIONS: Clear TIMESAMI'LED: 5:15pm BATCHTIME: 4:13pm TEMPERATURE (F)- AIR 91 F CONCRETE: 89 F TRVCKNO: 972 TIC~d~TNO: 3179908 AIR CONTENT (%): 5.2 UNIT WE1GHT (pcl): NA OVERALL PLACEMENT LOCATION: Gabion reinforcing beam SAMPLE LOCATION: REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" Between piers 15 & 16 SLUMP (inches) 4.5 MAXIM UM COMPRESSIVE CYLINDER MARKED DATE AGE DEatMETER AREA LOAD STRENGTH FRACTURE ' SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYI~E 1 1 07/16/2004 7 6.00 28.26 119350 4220 Unbonded Cap 1 2 08/06/2004 28 5.99 28.17 150320 5330 Unbonded Cap 1 3 08/06/2004 28 5.99 28.17 151980 5390 Unbonded Cap Average 5360 1 4 Hold Water added at site: 5 gallons O~'~ Technician: Dan Rogers Started: 2:30pm Finished: 5:00pm R Report Distribution: ( ) C tv of Coppell C]~ (I) Cit3' of Coppell ;tark Project Manager LIMITATIONS: The test results presented herein were prepared ba.~ed upon the specific samples provided for testing. We assume no responsibilit3' for variation in quality (composition, appearance, performance, etc ) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Lid Page 1 of I ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Roth'n ay, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: SeN'ices: City of Coppell Ms. Suzan C. Taylor PO Box 9478 Coppell TX 75019 Shadow Ridge Estates Retaining Wall Coppell, Texas Report No.: Project No.: Date of Service: Report Date: 213319 048967 07/12/2004 08/12/2004 Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA MEASURED STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTIL~,CTOR: Craig Olden, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 5" maximum NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-1231 ASTM C-39 excepl 9 I 2 MIX DESIGN I.D.: 9065 SLUMP PLACEMENT DATE: 07/12/2004 (inches) WEATHER CONDITIONS: Partly cloudy 6.0 TIME SAMPLED: 2:40pm BATCHTIME: l:49pm TEMPERATURE (F}- AIR 93 F CONCRETE: 94 t~ TRUCKNO: 1125 TICKETNO: 7142148 AIR CONTENT (%): 4.1 [~;IT WEIGHT (peri: NA OVERALL PLACEMENT LOCATION: Gabion erosion wall beam, row I starting at approximately 70' north of south end of beam, north to end of beara, 252 plantation Drive SAMPLE LOCATION: 80' north of south end of beam REPORT OF TESTS Concrete Compressive Cyl nder 6 CYLI'NDER NLt~XIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 07/19/2004 7 5.99 28.17 121680 4320 Unbonded Cap 1 2 08/09/2004 28 6.00 28.26 150310 5320 Unbonded Cap I 3 08/09/2004 28 6.00 28.26 146890 5190 Unbonded Cap Average 5260 1 4 Hold No station numbers on plans Technician: Shawn Deal Report Distribution: (1) City of Coppell (1) City. of Coppell Started: 1: 15pm Finished: 3:45pm Ron~ffg~~- k~ay~tark Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for tesfing We assume no responsibility for variation in quality (composition, appearance, performance, etc ) or any other feature of similar subjecl matter provided by persons or conditions over which we have no control Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd n~nn Page I ofl