Loading...
ST9304-CS 960131 DALLAS COUNTY PUBLIC WORKS January 31, 1996 Mr. Michael A. Martin, E.I.T. Assistant City Engineer City of Coppell P. O. Box 478 255 Parkway Boulevard Coppell, TX 75019 Re: Belt Line Road -- Project No. 490-403.1 / 91-829 (Denton Tap Road to MacArthur Boulevard) Prelinfinary Grade Approval Dear Mr. Martin: Thank you for your review comments dated January 25, 1996. The comments are fairly minor in nature and the County's consultant will be directed to make the changes and additions that you requested. However, the letter did not provide the preliminary grade approval that the County has requested. It is necessary for your city to provide preliminary grade approval before the consultant can be released to begin preparation of the drainage plans. After the preliminary grade approval is given, minor grade revisions can still be requested due to unforseen future conditions. The steps following preliminary grade approval include preliminary drainage approval, right-of-way document preparation, and final plans and specifications. Please indicate, by letter, if the City of Coppell can provide the preliminary grade approval at this time. You may contact me at 653-7151 if you have any questions concerning this project. Sincerely, / Project Engineer  c.'~ Tom Knicker, P.E., Halff and Associates OVAL.L'fR 411 Elm Street Dallas, Texas 75202 653-7151