Loading...
SS9901-CS040820CO?PELL August 20, 2004 Adam Lunsford, Project Coordinator S.J. Louis Construction of Texas 520 S. Sixth Street P.O. Box 834 Mansfield, TX 76063 RE: Deforest Road Lift Station Improvements Forcc Mare Lines A & B Project #SS 99-01 Dear Mr. Lunsford: As recommended by Turner Collie & Braden Inc., our consultant for the referenced prc~iect, the City of Coppcll accepts the change from D.I.P. installed by bore and open-cut to HDPE pipe installed by directional drill. Thc contractor and the City understand and agree that no additional compensation will be provided and that the HDPE pipe sections will be paid lbr as if the ductile iron pipc was installed. if you have any questions please feel free to give Rick O'Del[, Construction Inspector, a call at 972/304-7090. Sincerely, Kenneth ~5~l~n f 5 ~, p~E. -- Director of Enginccring/Public Works Ofi~cc 972/304-3686 Fax 972/304-7041 E-mail kgri ffi n~'ci.coppell.tx.us