Loading...
SS9901-CS040817 " SJ. LOUIS CONSTRUCTION OF TEXAS LTD. 520 South 6th Ave., P.O. Box 834 817/477-0320 Office · 817/477-0552 Fax Mansfield, Texas 76063 Equal Opportunity Employer / Contractor August 17. 2004 City of Coppell, Texas Public Works Department P.O. Box 9478 Coppelk Texas 75019 Attn: Mr. Kenneth M. Griffin, P.E. Director of Engineering/Public Works Via Fax: (972) 304-3673 (3 pages total) Re: Deforest Road Lift Station Improvements Forcc Main Lincs "A" & "B" City of Coppell, Texas During the review of our project file for the above referenced project, we noticed that we've not received any kind of acknowledgement from the City of Coppell regarding the acceptance of the change from D.I.P. installed by bore & open-cut to HDPE pipe installed by directional drill. At your earliest convenience, please acknowledge your agreement with your consultant Engineer's response to R.F.I. No. 1 and that the no additional cost change is acceptable and that the HDPE pipe sections will be paid for as if the ductile iron pipe was installed. A copy of your Engineer's response is attached for your reference. Should you have any questions or require additional information, please do not hesitate to call. Regards S.J. LOUIS CONSTRUCTION OF TEXAS LTD. Estimator/Project Coordinator Cc: Erika Cooper, P.E., Turner, Collie, & Bradcn, Inc., Via Fax: (972) 735-3001 S.]. Lou{s CG~s~c~On ' to f,o~n~ d~ec~ianal , ..... ,~, ~e~ ~ ~hich :he pmj~t c~ be co~lem~. ~oa ~ be ~a~cd ~ ~D usin~ (480~. ~ 3] STA 32~ to gTA rcqn~ ~ d~ (~50 ~. 2] STA 21+20 to ST~ 26+~ . · X~, ~ ~°~ %e a~ ~" c~e, u S3. Louis Co~t~ wo~ ..-.~aa~e ~ ~ for ~.~ ~_,~ is m~ I~s txpcnsL~= ~ ~ to t~ace ~poil m~al production use ~11~ ~ ~--~'~' o~r ;~pa~y ~m 3]0 LF ef ~6" ~ter st~] c~ng be cf 36" ~e~ c~ ~r 2a= ~Y 55 pFC ~ ~ ~ ~]e:, c~ be co~l~ D~ (~5 ~ . - -~" ~ di~ ~r the d~ m Jif' in ~e~ f~ ~ 2O'~i~ ~1 ~ing ~e ~o~~ m ~ ~ 88 ~ cf ¢8" A.?" ofcl~ ~ace ~m edge of pipe bell co r~ ~n~}' ~:1 c~m6 '~ still ~1o~ ~e 3~' di~ett~ ' 6.0" of~ ~e ~om ~0" D~. ~ ~eal ¢:qiu~ would a~ ~ltow .. of pip~ ~lt . . .___,{~ ~,,.,.~ ~ 't ~ O~~ Tot~ sm~ ........ ' ' ~11 ~ ~ pro;te~,,~- . ,'- :- ,h~ for v~u~ cn~ ..... ~ s~mr ~t~ $a,~ .33 ~v~. ~d S3. [~02 ' ~--~'/ ~e: DeFo~t and Sandy LakeWastewa~r Lift S~fions and Fore ~m Improvements TCB Pmje~ No. 052.1311~.0001,04000.A123 This RFI response ~cludes th~ following.:/ · Conversion 0fthree location_s,t0..hgdzgntal directional drilling (HDD), and · Downsizing of bored steel casing diameter. Horizontal Dirertional Drilling It is TCB's opinion the reque~ tbr ~he proposed alternate construction method of HDPE by directional drilling for the thr~e sections is technically acceptable provided the following conditions are met: ' ' ·This proposed alternate construe'don melted results ih hO additional contract time or cost to the Owner .... :2:; .... ~~,.~..:;!. :i;;:; -' ~. · The Contractor shall prepare proposed plans showing the horizontal and vertical alignments Cot these three sections. These shall be in the form of marks on the plans. Clearly show where the DLP transitions to HDPE. Show thrust anchors at each end of the I'[DPE. Thc details for the thrust reslxainr anchors are included in Attachment A to this response. These plans shall be reviewed with. TCB and the City's Inspector prior t° beginning directional drilling. Required clearance of the new force main :utilitFs'~hall be'10 feet ilesired;"8 TfiL-t minimum. minimum bend radius t'otZthe 20nineh DR 17 HDFE piping is 27 times the pipe, otitsid~ diameter for piping'and 100 times the PiPe outside diameter at flange adaptersf These' }~-}I minimum radii shall be maintained at all times. Air r~lea~e valves must be high points · Once di~ect/onal drilling of a section is complete, the Contractor shall provide ~{~li dam for the actual horizontal and ~6rtical al!gnmenm installed. This data shall be in the form of marks on the plans. T(~ will use these marks in draffing '~reeord ch-awing" plans for the City at thc completion of the project. 'Survey data (coordinates and bearings) will be requirsd. · TCB has not reviewed the experience, qualificatinn~, or equipment of the proposed horizontal drilling sul>-eontrac~or Downsizing of Bored Steel..Casin~.lD.iameter/ I ~ ]'CB has nO object/on to dox, msiz/ng &the bored steel casing diameter as proposed by 'axe: Contractor, with the understanding that the Contractor assumes thll respons~ility for thc more diflicult installation in smaller casing. The total amount of the savings, as calculated by S.J. Louis, is $13,420. The proposed split of 1/3 of r. he total savings to the City, 1/3 to S.J. Louis, and l/3 to the subcontractor is not acceptable. The City should receive one-half of the total savings ($6,710), or the diameters of the steel casings shall remain 36-inches and 48-inches. Please acknowledge acceptance of the revised savings. If you have any further questions, please feel free to contact George Cisnems at 97~73573074. CC; Rick O'Dell, Project Inspector - City of Coppell Ted Sugg - TCB Erika Cooper- TCB