Deforest Road Lift Station Improvements Forcc Main Lincs "A" & "B"
City of Coppell, Texas
During the review of our project file for the above referenced project, we noticed that
we've not received any kind of acknowledgement from the City of Coppell regarding the
acceptance of the change from D.I.P. installed by bore & open-cut to HDPE pipe
installed by directional drill. At your earliest convenience, please acknowledge your
agreement with your consultant Engineer's response to R.F.I. No. 1 and that the no
additional cost change is acceptable and that the HDPE pipe sections will be paid for as if
the ductile iron pipe was installed. A copy of your Engineer's response is attached for
your reference.
Should you have any questions or require additional information, please do not hesitate to
call.
Regards
S.J. LOUIS CONSTRUCTION OF TEXAS LTD.
Estimator/Project Coordinator
Cc: Erika Cooper, P.E., Turner, Collie, & Bradcn, Inc., Via Fax: (972) 735-3001
S.]. Lou{s CG~s~c~On ' to f,o~n~ d~ec~ianal
, ..... ,~, ~e~ ~ ~hich :he pmj~t c~ be co~lem~.
~oa ~ be ~a~cd ~ ~D usin~ (480~. ~ 3] STA 32~ to gTA
rcqn~ ~ d~ (~50 ~. 2] STA 21+20 to ST~ 26+~ . ·
X~, ~ ~°~ %e a~ ~" c~e, u S3. Louis Co~t~ wo~
..-.~aa~e ~ ~ for ~.~ ~_,~ is m~ I~s txpcnsL~= ~ ~
to t~ace ~poil m~al production
use ~11~ ~ ~--~'~' o~r ;~pa~y ~m 3]0 LF ef ~6" ~ter st~] c~ng be
cf 36" ~e~ c~ ~r 2a= ~Y 55 pFC
~ ~ ~ ~]e:, c~ be co~l~ D~ (~5 ~ . - -~" ~ di~ ~r the
d~ m Jif' in ~e~ f~ ~ 2O'~i~ ~1 ~ing ~e ~o~~ m ~
~ 88 ~ cf ¢8" A.?" ofcl~ ~ace ~m edge of pipe bell co
r~ ~n~}' ~:1 c~m6 '~ still ~1o~
~e 3~' di~ett~ ' 6.0" of~ ~e ~om
~0" D~. ~ ~eal ¢:qiu~ would a~ ~ltow ..
of pip~ ~lt . . .___,{~ ~,,.,.~ ~
't ~ O~~ Tot~ sm~ ........ ' '
~11 ~ ~ pro;te~,,~- . ,'- :- ,h~ for v~u~ cn~ ..... ~
s~mr ~t~ $a,~ .33 ~v~. ~d S3.
[~02
' ~--~'/ ~e: DeFo~t and Sandy LakeWastewa~r Lift S~fions and Fore ~m Improvements
TCB Pmje~ No. 052.1311~.0001,04000.A123
This RFI response ~cludes th~ following.:/ · Conversion 0fthree location_s,t0..hgdzgntal directional drilling (HDD), and
· Downsizing of bored steel casing diameter.
Horizontal Dirertional Drilling
It is TCB's opinion the reque~ tbr ~he proposed alternate construction method of HDPE by
directional drilling for the thr~e sections is technically acceptable provided the following conditions
are met: ' '
·This proposed alternate construe'don melted results ih hO additional contract time or cost
to the Owner .... :2:; .... ~~,.~..:;!. :i;;:; -' ~.
· The Contractor shall prepare proposed plans showing the horizontal and vertical
alignments Cot these three sections. These shall be in the form of marks on the plans.
Clearly show where the DLP transitions to HDPE. Show thrust anchors at each end of the
I'[DPE. Thc details for the thrust reslxainr anchors are included in Attachment A to this
response. These plans shall be reviewed with. TCB and the City's Inspector prior t°
beginning directional drilling. Required clearance of the new force main
:utilitFs'~hall be'10 feet ilesired;"8 TfiL-t minimum.
minimum bend radius t'otZthe 20nineh DR 17 HDFE piping is 27 times the pipe, otitsid~
diameter for piping'and 100 times the PiPe outside diameter at flange adaptersf These' }~-}I
minimum radii shall be maintained at all times. Air r~lea~e valves must be
high points
· Once di~ect/onal drilling of a section is complete, the Contractor shall provide ~{~li
dam for the actual horizontal and ~6rtical al!gnmenm installed. This data shall be in the
form of marks on the plans. T(~ will use these marks in draffing '~reeord ch-awing" plans
for the City at thc completion of the project. 'Survey data (coordinates and bearings) will
be requirsd.
· TCB has not reviewed the experience, qualificatinn~, or equipment of the proposed
horizontal drilling sul>-eontrac~or
Downsizing of Bored Steel..Casin~.lD.iameter/ I ~
]'CB has nO object/on to dox, msiz/ng &the bored steel casing diameter as proposed by 'axe:
Contractor, with the understanding that the Contractor assumes thll respons~ility for thc more
diflicult installation in smaller casing.
The total amount of the savings, as calculated by S.J. Louis, is $13,420. The proposed split of 1/3 of
r. he total savings to the City, 1/3 to S.J. Louis, and l/3 to the subcontractor is not acceptable. The
City should receive one-half of the total savings ($6,710), or the diameters of the steel casings shall
remain 36-inches and 48-inches. Please acknowledge acceptance of the revised savings.
If you have any further questions, please feel free to contact George Cisnems at 97~73573074.