SS9901-CS040823 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: From: Jim Witt, City Manager Ken Griffin, P.E., Director of Engineering/Public Works Date: August 23, 2004 Force Main Line 'D' Project #ST 99-01 I spoke with Gregg Wood, Project Manager for Mastec, today concerning the progress of the force main directional drilling. Several things are working against the contractor in trying to get this section of the pipe in. One issue is the failures they have had in the subsoil going beneath the box culverts and some of the other utilities. They currently have the pilot hole and t~vo ream outs in. They will be doing two additional ream outs this week, with the potential to pull the pipe on Saturday, August 28th. They originally wanted to move their equipment south of Laguna and pull the pipe from north to the south. However, this would have placed the equipment next to the elementary school and potentially created a noise concern during the school day. After discussion with the contractor, they agreed to pull the pipe from the south to the north; however, this requires closing down the median opening of Village Parkway to string the pipe out. Obviously, the median opening at Village Parkway cam~ot be closed during the week because of school access. Therefore, this only leaves the contractor the option of pulling this section of pipe on Saturdays and/or Sundays. i did speak with the contractor concerning any complaints they might have received in the field given the fact that we have received no complaints in the office. He stated that they did receive one complaint from a resident on Mariners Court (this is slightly north of Parkway and west of MacArthur), but it was concerning a frac out that had happened in the person's backyard. During the course of discussing the frac out with this person, a neighbor came over and mentioned that there was some vibration felt in his house. I have strongly recommended to the contractor that they consider placing a seismograph at the limits of the right-of-way on both sides of the street to protect themselves given the recent concerns expressed about vibrations of foundations. I have also recommended to the contractor that they consider moving their equipment north, after this pull is complete, instead of turning around and drilling back to the north. "CITY OF COPPEI,E ENGINEERING - EXCEIA,ENCE BY DESIGN" Because the placement of the seismograph and/or the movement of the equipment to another bore location could involve financial considerations to the company, Mr. Wood stated that he would need to speak with his supervisors and get back with me later today. In summary, the current status is: 1. The schedule is to complete drilling from Parkway to Laguna this week and pull the pipe this weekend. 2. The only complaint on the project to date is a complaint concerning a frac out. 3. I have strongly suggested to the contractor to use seismographs adjacent to the right-of-way to monitor any movement. 4. I have strongly suggested to the contractor, given the fact it has taken so long to drill to the south, that consideration be given to moving the equipment location further north once this section of drilling and pipe placement is complete. I will update you further when I hear from Mastec concerning the seismograph and/or the relocation of the equipment for future directional drilling. "CITY OF COPPELI. ENGINEERING - EXCELLENCE BY DESIGN"