Loading...
ST9902-CS040803August3,2004 Mr. John F. Kellen 103 Oakbend Drive Coppell, Texas 75019 COP?ELL Sandy Lake Road / ST 99-02A Lot 82, Block A, Oakbend Addition Right-of-Way / Sidewalk & Utility Easement Dear Mr. Kellen: The City of Coppell is currently working with the engineering firm of Teaguc Nail and Perkins on the design of improvements for Sandy Lake Road (west City limits to North Coppell Road) and Royal Lane (Sandy Lake Road to Northpoint). The existing two-lane asphalt roads ~vill be replaced with four-lane divided, concrete roadways with improved drainage. An eight-foot hike and bike trail will bc constructed along the south side of Sandy Lake Road, from State Road eastward to North Coppcll Road. Thc project is in the final design phase and the City is in the process of obtaining the right-of-way and easements necessary to construct the project. It will be necessary to obtain right-of-way and a sidewalk and utility easemcnt on property that is owned by you. The right-of-way will provide the parkway area behind the back-of-curb that is necessary for thc construction of a curb inlet and the hike and bike trail. Thc proposed improvements will not impact the existing seven-foot brick fence located on your property. A 35'x 35' visibility triangle bas platted as a part of Lot 82, Block A, Oakbend Addition. The Ci~, needs to obtain sidewalk and utility easement rights within the visibility triangle. The eight- foot hike and bike trail will have an accessibility ramp at the southwest comer of the Oakbend Drive/Sandy Lake Road intersection. The construction of the trail and accessibility ramp will require additional area outside of thc existing right-of-way. Thc 35'x35' triangle will also provide additional area for the construction or relocation of utilities. With this letter 1 am providing a copy of the right-of-way and the sidewalk and utility easement documcnts necessa%' for thc construction of Sandy Lake Road. Please review the enclosed documents and let me know if you have any questions or if you wish to vicw thc construction plans. Your consideration of this matter is appreciated. Sincerely, Suzar~ylor CIP C4~o.~inator / 972-304-7019 Enclosures 255 PARi~WAY ~ PO BOX 3478 ,k CO[,PELL TX 75019 ~- IE~. 972/,3t, 2 {)o22 ~i, FAX ~72/30~1 3673 Mr. Duke Clark Coppell Bible Fellox~ship P.O. Box 2352 Coppcll, Texas 75019 CO??ELL August 3, 2004 Sand5, Lake Road / ST 99-02A Sidewalk & Utility Easement / Temporary Construction Easement Dear Mr. Clark: The City of Coppell is currently working with the engineering firm of Teague Nail and Perkins on the design of improvements for Sand)' Lake Road (west City limits to North Copp¢ll Road) and Royal Lane (Sandy Lake Road to Northpoint). The existing two-lane asphalt roads will be replaced with four-lane divided, concrete roadways with improved drainage. An eight-foot hike and bike trail will be constructed along the south side of Sandy Lake Road, from State Road eastward to North Coppell Road The project is in the final design phase and the City is in the process of obtaining the right-of-way and easements necessary to construct the project. It will be necessary to obtain a sidewalk and utility easement, and a temporary construction easement on property that is owned by the Coppcll Bible Fellowship. There is a 12- and a 14-foot curb inlet that will bc constructed on the south side of the roadway in front of the Coppell Bible Fellowship property. Thcrc is insufficient ama between thc back of the inlets and the right-of-way to construct the proposed 8-foot hike and bike trail. A 10-foot sidewalk easement contiguous with the south right-of-way line will allow for the meandering of the trail away from the inlets and the back of the curb. It will also provide additional area for the installation or relocation of utilities. The City will also need to obtain a temporary construction casement in order to reconstruct a portion of the existing access drive. Approximately 100 foot of the drive, along with the curb inlet, will be removed and a new drive with improved drainage will be constructed. The temporary construction easement will not be filed with Dallas County, and will expire upon completion of the project With this letter, I am providing a copy of the sidewalk and utiliW casement, and the temporary construction easement documents necessary for the construction of Sandy Lake Road. Please review thc enclosed documents and let me know if you have any questions or if you wish to view thc construction plans. Your considcration of this mattcr is appreciated. Sincerely, Suzan~ T~ylor CIP Coo~inator / 972-304-7019 Enclosures August 3, 2004 Mr. Richard Anderson 101 Branchwood Trail Coppell, Texas 75019 T H E C I T Y 0 F COPPELE Sandy Lake Road / ST 99-02A Lot 1, Block B, Oakbend Addition Sidewalk & Utility Easement Dear Mr. Anderson: The City of Coppell is currently working with the engineering firm of Teague Nail and Perkins on the design of improvements for Sandy Lake Road (west City limits to Notth Coppcll Road) and Royal Lane (Sandy Lake Road to Northpoint). The existing two-lane asphalt roads will bc replaced with four-lane divided, concrete roadways with improved drainage. An eight-foot hike and bike trail will be constructed along the south side of Sandy Lake Road, from State Road eastward to North Coppell Road. The project is in the final design phase and the City is in the process of obtaining the right-of-way and casements necessary to construct the project. It will be necessary to obtain a sidewalk and utility easemcnt on property that is owned by you. A 35'x 35' visibility triangle was platted as a part of Lot 1, Block B, Oakbend Addition. The City needs to obtain sidewalk and utility easement rights within the visibility triangle. The eight- foot hike and bike trail will have an accessibility ramp at the southwest comer of the Branchwood Trail/Sandy Lake Road intersection. The construction of the trail and accessibility ramp will require additional area outsidc of the existing right-of-way The 35'x35' triangle will also provide additional arca for the construction or relocation of utilities. With this letter I am providing a copy of the sidewalk and utility easement necessary for the construction of Sandy Lake Road. Please revicw the enclosed document and let me know if you have any questions or if you wish to view the construction plans. Your consideration of this matter is appreciated. Sincerely, Suzan/~ylor CIPC'oOdinator 972-304-7019 Enclosures ML Julio E. Lcn 102 Oakbend Drive Coppell, Texas 75019 T H E C I T Y O F COPPEE£ August3,2004 RE: Sandy Lake Road / ST 99-02A Lot 24, Block B, Oakbend Addition Sidewalk & Utility Easement / Temporary Slope Easement Dear Mr. Len: The City of Coppell is currently working with the engineering firm of Teague Nail and Perkins on the design of improvements for Sandy Lake Road (wcst City limits to North Coppell Road) and Royal Lane (Sandy Lake Road to Northpoint). The existing two-lane asphalt roads will be replaced with four-lane divided, concrete roadways with improved drainage. An eight-foot hike and bike trail will be constructed along the south side of Sandy Lake Road, from State Road eastward to North Coppell Road. The project is in the final design phase and the City is in the process of obtaining the right-of-way and casements necessary to construct the project. It will be necessary to obtain a sidewalk and utility casement, and a tempora~ slope easement on propcrty that is owned by you. A 35'x 35' visibility triangle was platted as a part of Lot 24, Block B, Oakbend Addition. The City needs to obtain sidewalk and utility easement rights within the visibility triangle. The eight- foot hike and bike trail will have an accessibility ramp at the southeast comer of the Oakbend Drive/Sandy Lake Road intersection. The construction of the trail and accessibility ramp will require additional area outside of the existing right-of-way. The 35'x35' triangle will also provide additional area for the construction or relocation of utilities. The City will also need to obtain a temporary slope easement on a portion of your property. The proposed roadway ground elevations will not tie into the existing ground elevations within the limits of the right-of-way in this area. The slope grading will not impact the existing seven-foot brick wall located on your property. The temporao' slope easement will not be filed with Dallas County, and will expire upon completion of thc project. With this lcttcr I am providing a copy of the sidewalk and utility easement, and temporary slope easement documents necessary, for the construction of Sandy Lake Road. Please review the enclosed documents and lct me know if you have any questions or if you wish to view the construction plans~ Your consideration of this matter is appreciated. Sincerely, Suza~hylor CIP C0ofdinator / 972-304-7019 Enclosures 255 PA}~KWAy ,Ct pO 8OX 9z178 ~- COPPELL q X 75019 ~ TEL 972/402 0022 ~ FAX 972/304 3673 Mr. Abraham Varughese 100 Branchwood Trail Coppell, Texas 75019 T H £ . C I T Y · 0 F' COPFELL August 3, 2004 Sandy Lake Road / ST 99-02A Lot 1, Block A, Oakbend Addition Right-of-Way / Sidewalk & Utility Easement / Temporary Slope Easement Dear Mr. Vamghese: The City of Coppell is currently working with the engineering firm of Teague Nail and Perkins on the design of improvements for Sandy Lake Road (west City limits to North Coppell Road) and Royal Lane (Sandy Lake Road to Northpoint). The existing two-lane asphalt roads will be replaced with four-lane divided, concrete roadways with improved drainage. An eight-foot hike and bike trail will be constructed along the south side of Sandy Lake Road, from State Road eastward to North Coppell Road. The project is in the final design phase and the City is in the process of obtaining the right-of-way and cascments necessary to construct the project. It will be necessary to obtain fight-of-way, a sidewalk and utility easement, and a temporary slope easement on property that is owned by you. The right-of-way is necessary for the construction of a retaining wall along the south side of the eight-foot hike and bike trail. The proposed roadway and trail are located further to the south and closcr to the existing eight-foot brick wall than the existing road. The bottom elevation of thc brick wall is approximately six foot higher than thc elevation of the proposed trail. The retaining wall will allow the proposed ground elevations to be tied into the existing ground elevations at the required grade without impacting the cxisting eight-foot bhck wall. A temporary slope casement will be required for the slope grading between the retaining wall and existing brick wall. The temporary slope easement will not be filed with Dallas Count', and will expire upon completion of the project. A 35'x 35' visibility triangle was platted as a part of Lot 1, Block A, Oakbend Addition. The City needs to obtain sidewalk and utility easement rights within the visibility triangle~ The eight- foot hike and bike trail will have an accessibility ramp at the southeast comer of the Branchwood Trail/Sandy Lake Road intersection. Thc construction of the trail and accessibility ramp will require additional area outside of thc existing right-of-way~ The 35'x35' triangle will also provide additional area for the construction or rclocation of utilities. With this letter I am providing a copy of the right-of-way, sidewalk and utility easement, and temporary slope easement necessary for the construction of Sandy Lake Road. Please review the enclosed documents and let mc know if you have any questions or if you wish to view the construction plans. Your consideration of this matter is appreciated. ~S.~cerely, i Suza~Faylor C1P 17aabrdinator / 972-304-7019 Enclosures