Loading...
ST9502-LR 960424CONCRETE COMPREoSIVE STRENGTH TES' , 4747 Irving Blvd., Suite #206 Dnllan, Texas 7S247 Date of Service: 04/24/1996 Report No.: 962978 Client No.: 48345000 Project No.: 43-1059-96 Client: Services: Kauffinan & Broad of Texas, Inc. Project: Garden Oak Estates Phase IV c/o Midcrest Properties, Inc. 1721 W. Plane Parkway, Suite 131 Dallas TX 75075. Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Site Concrete PLANT: On-Site SPECIFICATION REQUIREMENTS 3500 psi ~ 28 Days 3" Max 3 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) · PROJECT DATA CONCRETE CLASS: 6 SK PLACEMENT DATE: 04/24/1996 TIME SAMPLED: 8:00 am BY: Charlie Shurtleff WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 53 F CONCRETE: 64 F TRUCKNO: 90-6 TICI~T NO: N/A AIR CONTENT (%): 2.7% vNrr WEIGHT (pet'): N/A PLACEMENT LOCATION: Paving for Valley Ridge SAMPLE LOCATION: Station 6+55 ACCUMULATIVE YARDS: 1016 REPORT OF TESTS MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH TESTED (days) Obs. force) (psi) 1 1 5.0' 05/01/1996 7 111950 3960 1 2 5.0* 05/01/1996 7 113360 4010 1 3 5.0* 05/22/1996 28 149550 5290 1 4 5.0' 05/22/1996. 28 153510 5430 BATCH TIME: 7:50 am FRACTURE TYPE Note: *Contractor was notified that the concrete placed exceeded the specified slump. Technician: Charlie Shurtleff Report Distribution: (I) Kauflinan & Broad &Texas, Inc. (1) City ofLewisvilte/Bldg. Insp. Started: 6:00 am Finished: 7:00 pm Engineering, Inc. Eugene Harbour Vice President 01AS This report is exclusively lbr the use oftbe client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. CONCRETE COMPRE ,SIVE STRENGTH TESta 4747 Irving Blvd., Suite #206 Dallaa, Texas 75247 Date of Service: 04/24/1996 Report No.: 962978 Client No.: Client: Services: 48345000 Project No.: 43-1059-96 Kauffinan & Broad of Texas, Inc. Project: Garden Oak Estates Phase IV c/o Midcrest Properties, Inc. 1721 W. Piano Parkway, Suite 131 Dallas TX 75075 Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Site Concrete PLA~T: On-Site SPECIFICATION REQUIREMENTS 3500 psi ~ 28 Days 3" Max 3 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MARKED SET NO. PROJECT DATA CONCRETE CLASS: 6 SK PLACEMENT DATE: 04/24/1996 BATCHTIME: 8:50 am TIMESAMPLEO: 9:00 am BY: Charlie Shurtleff WEATHER CONDITIONS: Clear TEMPERATURE (F)- AIR 56 r CONCm*~TE: 65 F TRUCKNO: 91-3 TICKET NO: N/A AIRCONTENT (%): 3.5% UNIT WEIGHT (pc0: N/A PLACEMENT LOCATION: Paving for Valley Ridge SAMPLE LOCATION: ACCUMULATIVE YARDS: 1016 REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD ('roches) TESTED (days) Obs. force) 05/01/1996 7 117320 05/01/1996 7 116470 05/22/1996 28 155770 05/22/1996 28 158310 2 1 3.0 2 2 3.0 2 3 3.0 2 4 3.0 Station 5+00 COMPRESSIVE STRENGTH 4150 4120 5510 5600 FRACTURE TYPE Technician: Charlie Shurtleff Report Distribution: (1) Kauffman & Broad &Texas, Inc. (1) City of Lewisville/Bldg. Insp. Started: 6:00 m~ Finished: 7:00 pm Engineering, Inc. Eugene Harbour Vice President 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. CONCRETE COMPREo$IVE STRENGTH TES' 4747 Irving Blvd., Suite 0206 Dallas, Texas 75247 Date of Service: Client No.: Client': Services: 04/24/1996 48345000 Report No.: 962978 Project No.: 43-1059-96 Project: Garden Oak Estates Phase IV Kauffinan & Broad of Texas, Inc. c/o Midcrest Properties, Inc. 1721 W. Piano Parkway, Suite 131 Dallas TX 75075 Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. ** STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Site Concrete et~rr: On-Site SPECIFICATION REQUIREMENTS 3500 psi ~ 28 Days 3" Max 3 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 3 1 3.5 3 2 3.5 3 3 3.5 3 4 3.5 DATE TESTED 05/01/1996 05/01/1996 05/22/1996 05/22/1996 PROJECT DATA CONCRETE CLASS: 6 sm PLACEMENT DATE: 04/24/1996 TIraESAMPLED: 10:00 am EY: Charlie Shurtleff WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 63 ~' CONCRETE: 68 F TRUCK NO: 90-6 TICKET NO: N/A AIR CONTENT (%): 3.5% UNIT V~IGHT ~c0: N/A PLACEMENT LOCATION: Paving for Valley Ridge SAMPLE LOCATION: Station 3+50 ACCUMULATIVE YARDS: 1016 REPORT OF TESTS MAXIMUM AGE LOAD (days) (lbs. force) BATCHTIME: 9:50 am COMPRESSIVE STRENGTH (.psi) 7 115620 4O90 7 114490 4050 28 149830 5300 28 145590 5150 FRACTURE TYPE Technician: Charlie Shurtleff Report Distribution: (1) Kauffinan & Broad of Texas, Inc. (1) City of Lewisville/Bldg. Insp. Started: 6:00 am Finished: 7:00 pm Engineering, Inc. Eugene Harbour Vice President 01AS This report is exclusively tbr the use. of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering Inc. CONCRETE COMPRE ,SIVE STRENGTH TES'. 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Report No.: 962978 Date of Service: 04/24/1996 Client No.: 48345000 Client: Services: Project No.: 43-1059-96 Kauffman & Broad of Texas, Inc. Project: Garden Oak Estates Phase IV c/o Midcrest Properties, Inc. 1721 W. Plm~o Parkway, Suite 131 Dallas TX 75075 Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength smnples.** STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Site Concrete PLANT: On-Site SPECIFICATION REQUIREMENTS 3500 psi ~ 28 Days 3" Max 3 - 6% ASTM C-39 ASTM C- 172 ASTM C-143 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 4 1 4.0 4 2 4.0 4 3 4.0 4 4 4.0 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 1 l:00 am WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 87-14 AIR CONTENT (%): 3.6% PLACEMENT LOCATION: SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS 6 SK 04/24/1996 BATCH TIME: 10:50 am BY: Charlie Shurtleff Clear 70 v CONCRETE: 70 g TICKET NO: N/A UNIT WEIGHT (pcf): N/A Paving for Valley Ridge Station 2+00 1016 COMPRESSIVE STRENGTH FRACTURE (ps0 TYPE 4080 4070 5000 5040 MAXIMUM DATE AGE LOAD TESTED (days) Obs. for~e) 05/01/1996 7 115340 05/01/1996 7 115060 05/22/1996 28 141350 05/22/1996 28 142480 Technician: Charlie Shurtleff Report Distribution: (1) Kauffman & Broad of Texans, Inc. (1) City o£Lewisville/Bldg. Insp. Started: 6:00 am Finished: 7:00 pm H~ Engineering, Inc. Eugene Harbour Vice President 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in thll without the written approval of HBC Engineering, Inc. CONCRETE COMPREb31VE STRENGTH TESrl 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Date of Service: 04/24/1996 Report No.: 962978 Client No.: 48345000 Project No.: 43-1059-96 Client: Services: Kauffrnan & Broad of Texas, Inc. Project: Garden Oak Estates Phase 1V c/o Midcrest Properties, Inc. 1721 W. Piano Parkway, Suite 131 Dallas TX 75075 Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength sam p les. ** STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Site Concrete PLANT: On-Site SPECIFICATION REQUIREMENTS 3500 psi ~ 28 Days 3" Max 3 - 6% ASTM C-39 ASTM C- 172 ASTM C-143 CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 5 1 2.0 5 2 2.0 5 3 2.0 5 4 2.0 PROJECT DATA CONCRETE CLASS: 6 SK PLACEMENT DATE: 04/24/1996 BATCH TIME: TIMESA~PLED: 12:00 pm BY: Charlie Shurtleff WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 90-7 AIR CONTENT (%): 3.4% PLACEMENT LOCATION: SAMPLE LOCATION: Clear 78 F CONCRETE: 74 TICKET NO: N/A UNIT WEIGHT (pc0: N/A Paving for Valley Ridge Station 0+25 ACCUMULATIVE YARDS: 1016 REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) 05/01/1996 7 122130 05/01/1996 7 124670 05/22/1996 28 155490 05/22/1996 28 153790 COMPRESSIVE STRENGTH 4320 4410 5500 5440 11:50 am FRACTURE TYPE Technician: Charlie Shurtleff Report Distribution: (1) Kauffman & Broad of Texas,.Inc. (i) City of Lewisville/Bldg. Insp. Started: 6:00 am Finished: 7:00 pm I-~ Engineering, Inc. Eugene Harbour Vice President 01AS This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in fidl without the written approval of HBC Engineering, Inc. CONCRETE COMPREb 4IVE STRENGTH TESrl 4747 Irving Blvd., Suite/t206 Dallas, Texas 75247 Date of Service: 04/24/1996 Report No.: 962978 Client No.: 48345000 Project No.: 43-1059-96 Client: Services: Kauffinan & Broad of Texas, Inc. Project: Garden Oak Estates Phase IV c/o Midcrest Properties, Inc. 1721 W. Piano Parkway, Suite'131 Dallas TX 75075 Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Site Concrete pI~X'T: On-Site SPECIFICATION REQUIREMENTS 3500 psi ~ 28 Days 3" Max 3 - 6% ASTM C-39 ASTM C- 172 ASTM C-143 CYLINDER MEASURED MARKED SLUMP SET NO. ('mches) 6 1 6.0* 6 2 6.0' 6 3 6.0' 6 4 6.0* PROJECT DATA CONCRETE CLASS: 6 sm PLACEMENTOATE: 04/24/1996 BATCHTIME: 12:50 pm TIME SnMPLED: 1:00 pm BY: Charlie Shurtleff WEATHER CONDITIONS: Clear TEMPERATURE Oh') - AIR 82 F CONCRETE: 75 F TRUCK NO: 91-3 AIR CONTENT (%): 3.6% PLACEMENT LOCATION: TICKET NO: N/A UNIT WEIGHT (pc0: N/A Paving for Yellowstone Avenue SAMPLE LOCATION: Station 9+50 ACCUMUlaTIVE YARDS: 1016 REPORT OF TESTS MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH FRACTURE TESTED (days) (Ihs. force) (ps0 TYPE 05/01/1996 7 106860 05/01/1996 7 109690 05/22/1996 28 135980 05/22/1996 28 134000 378O 3880 4810 4740 Technician: Charlie Shurtleff Report Distribution: (1) Kauffinan & Broad of Texas, lnc. (1) City of Lewisville/Bldg. Insp. Started: 6:00 am Finished: 7:00 pm Engineering, Inc. Eugene Harbour Vice President 01AS This report is exclusively tbr the use of the client indicated above and shall not be reproduced except in flail without the written approval of HBC Engineering, Inc. I r ]1-' ][ ~ T cONCRETE COMPREb SIVE STRENGTH TES _ 4747 Irving Blvd., Suite #206 l)alln~ Texas 75247 Date of Service: 04/24/1996 Report No.: 962978 Client No.: 48345000 Project No.: 43-1059-96 Client: Services: Kauffinan & Broad of Texas, Inc. Project: Garden Oak Estates Phase 1V c/o Midcrest Properties, Inc. 1721 W. Plano Parkway, Suite 131 Dallas TX 75075 Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength s amp les.* * STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Site Concrete PLANT: On-Site SPECIFICATION REQUIREMENTS 3500 psi ~ 28 Days 3" Max 3 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MARKED SET NO. PROJECT DATA CONCRETE CLASS: 6 SK PLACEMENT DATE: 04/24/1996 TIME SAMPLED: 2:00 pm BY: Charlie Shurtleff WEATHER CONDITIONS: Clear TEMPERATURE (F) - AIR 83 F CONCRETE: 76 F TRUCK NO: 87-14 AIR CONTENT (%): 3.8% PLACEMENT LOCATION: BATCHTIME: 1:50 pm TICKET NO: N/A UNIT WEIGHT (pci): N/A Paving for Yellowstone Avenue SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS MEASURED MAXIMUM SLUMP DATE AGE LOAD (inches) TESTED (days) (lbs. force) 7 1 3.5 7 2 3.5 7 3 3.5 7 4 3.5 Station 8+00 1016 COMPRESSIVE STRENGTH (~si) 3650 3690 4800 5000 05/01/1996 7 103190 05/01/1996 7 104320 05/22/1996 28 135700 05/22/1996 28 141350 FRACTURE TYPE Technician: Charlie Shurtleff Report Distribution: (1) Kaufthaan & Broad of Texas, Inc. (1) City of Lewisville/Bldg. Insp. Started: 6:00 am Finished: 7:00 pm H~ Engineering, Inc. Eugene Harbour Vice President 01AS This report is exclusively for lhe use of the client indicated above and shall not be reproduced except in full without the writlen approval of HBC Engineering, Inc. I ¥ ]]' ][ '[ CONCRETE COMPRE . IVE STRENGTH TES 4747 Irving Blvd., Suite 0206 Dallas, Texas 75247 Date of Service: 04/24/1996 Client No.: 48345000 Client: Kauffman & Broad of Texas, Inc. c/o Midcrest Properties, Inc. 1721 W. Piano Parkway, Suite 131 Dallas TX 75075 Services: Report No.: 962978 Project No.: 43-1059-96 Project: Garden Oak Estates Phase IV Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength smnples.** STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Site Concrete PLANT: On-Site SPECIFICATION REQUIREMENTS 3500 psi ~ 28 Days 3" Max 3 - 6% ASTM C-39 ASTM C- 172 ASTM C-143 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 8 1 1.5 8 2 1.5 8 3 1.5 8 4 1.5 DATE TESTED PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 3:00 pm WEATHER CONDITIONS: TEMPERATURE (F)- AIR TRUC~<NO: 90-7 AIRCONTENT (%): 3.5% PLACEMENT LOCATION: 6 SK 04/24/1996 BATCH TIME: 2:50 pm BY: Charlie Shurtleff Clear 83 F CONCRETE: 76 TICKET NO: N/A UNIT WEIGHT (pcf): N/A Paving for Yellowstone Avenue SAMPLE LOCATION: Station 6+50 ACCUMULATIVE YARDS: 1016 REPORT OF TESTS MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (aays) Ob~ for~e) (vsi) 7 125240 4430 7 124950 4420 28 147000 5200 28 150400 5320 05/01/1996 05/01/1996 05/22/1996 05/22/1996 FRACTURE TYPE Technician: Charlie Shurtleff Report Distribution: (1) Kauffrnan & Broad of Texas, Inc. (1) City of Lewisville/Bldg. Insp. Started: 6:00 am Finished: 7:00 pm H~ Engineering, Inc. Eugene Harbour Vice President (}lAS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. CONCRETE CoMPRESolVE STRENGTH TES I 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Date of Service: 04/24/1996 Report No.: Client No.: 48345000 Project No.: Client: Kauffinan & Broad of Texas, Inc. Project: c/o Midcrest Properties, Inc. 1721 W. Plano Parkway, Suite 131 Dallas TX 75075 Services: 962978 43-1059-96 Garden Oak Estates PhaseIV Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples.** SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Site Concrete' PLANT: On-Site SPECIFICATION REQUIREMENTS STRENGTH: 3500 psi ~ 28 Days 3" Max 3 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MARKED SET NO. MEASURED SLUMP (inches) 9 1 1.0 9 2 1.0 9 3 1.0 9 4 1.0 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 4:00 pm WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 90-6 AIRCONTENT ('/.): 3.7% PLACEMENT LOCATION: SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) Obs. force) 05/01 / 1996 7 121840 05/01/1996 7 125240 05/22/1996 28 141350 05/22/1996 28 144460 6SK 04/24/1996 BATCH TIME: 3:50 pm BY: Charlie Shurtleff Clear 83 F CONCRETE: 76 TICKET NO: N/A UNIT WEIGHT (pet): N/A Paving for Yellowstone Avenue COMPRESSIVE STRENGTH (psi) Station 4+75 1016 4310 4430 5000 5110 FRACTURE TYPE Technician: Charlie Shurtleff Report Distribution: (1) Kauffinan & Broad of Texas, lnc. (1) City ofLewisville/Bldg. Insp. Started: 6:00 am Finished: 7:00 pm H~ Engineering, Inc. Eugene Harbour Vice President 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. I 'r Il -' 1[ '[ coNCRETE COMPRESoIVE STRENGTH TEKI 4747 Irving Blvd., Suite #206 Dallas, Texas 75247 Date of Service: Client No.: Client: Services: 04/24/1996 48345000 Report No.: 962978 Project No.: 43-1059-96 Project: Garden Oak Estates Phase IV Kauffman & Broad of Texas, Inc. c/o Midcrest Properties, Inc. 1721 W. Piano Parkway, Suite 131 Dallas TX 75075 Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength smnples.** STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Site Concrete CONCRETE SUPPLIER: Site Concrete pL.~rr: On-Site SPECIFICATION REQUIREMENTS 3500 psi ~ 28 Days 3" Max 3 - 6% ASTM C-39 ASTM C-172 ASTM C-143 CYLINDER MEASURED MARKED SLUMP SET NO. (incites) 10 1 4.5 10 2 4.5 10 3 4.5 10 4 4.5 PROJECT DATA CONCRETE CLASS: PLACEMENT DATE: TIME SAMPLED: 5.'00 pm WEATHER CONDITIONS: TEMPERATURE (F) - AIR TRUCK NO: 91-3 AIR CONTENT (%): N/A PLACEMENT LOCATION: SAMPLE LOCATION: ACCUMULATIVE YARDS: REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (day~) Obs. force) 05/01/1996 7 114210 05/01/199(~ 7 112510 05/22/1996 28 140780 05/22/1996 28 144740 6 SK 04/24/1996 BATCH TIME: 4:50 pm BY: Charlie Shurtleff Clear 82 g CONCRETE: 77 TICKET NO: N/A UNIT WEIGHT (pd): N/A Paving for Yellowstone Avenue COMPRESSIVE STRENGTH (psi) Station 2+75 1016 4040 3980 4980 5120 FRACTURE TYPE Technician: Charlie Shurtleff Report Distribution: (l) Kauttinan & Broad of Texas, Inc. (1) City of LewisvilledBldg. Imp. Started: 6:00 am Finished: 7:00 pm Engineering, Inc. Eugene Harbour Vice President 01AS This report is exclusively for the use of the client indicated above and shall not be reproduced except in flail without the written approval of HBC Engineering, Inc.