ABEL V. SALDAlqA, P.E., PROJECT MANAGER
DALLAS COUNTY PUBLIC WORKS DEPARTMENT
411 ELM STREET, 4rH FLOOR
DALLAS, TEXAS 75202
TELE. NO.: 214-653-6240
FAX NO.: 214-653-6445
EMAIL: ASaldana~dallascounty.org
FormaW~xCovet$h~-~O 1 [22004
DAI,LAS COUNTY
PUBLIC WORKS
August 23, 2004
Kenneth Oriflln, P.E., Dh'actor ofEngineerin8 and Public Works
City of Coppell
P,0, Box 9478
Coppell, TX 75019
Re: CI)BG Coppefi - FY 2002 Golden Trlan~le M]IP Water Main & Firt Hydrant~ Project
Water Line "W-~' - Flowable Fill Requirement~
Dea~ Ken,
The flowable RII mix tot the Wate~ Line "W-2" uti~ trench back~l of the referenced project is a 28-
day compressive streng/h 0£500 p.s.i. (see aUached batch design submittal from Nelson Bros. Ready
I~ Ltd., dated July 2, 2004). This till mix was pla~ed by the Contractor, North Texas Contras'ting,
Inc., on July 28, 2004, and August 2, 3, 4, and 5, 2004 (see attached batch tickets).
Samples by our testing lab, Team Consuhents, Ino., consisting ofthrse (3) cylinders were taken at
Station 2+00 on August 4, 2004 with the 7-Day Break ofl00 p.s.i, on August 11, 2004 (see attached
Team Reports). The 28-Day Breaks for the two (2) rema~ cylinde~ ate ached, led for Septemba'
1, 2004. Pa' Lany Davis, Coppell's Construction Inspector, a 2/3 strength of the minimum 500 p.s,i.
design compressive strength (maximum 1,200 p.s.i.) is required prior to the asphalt overlay work.
Per & site meetin8 on Tuesday, August 17, 2004, between North Texas Contracting the City of
Coppell, Team Consultants, and Dallas County, four (4) cores each were sampled same date ~om
tl~e (3) separate lotions with Average Cylinder Breaks taken ~ follows (see attached Team tests):
5+80 August 2, 2004 15-Day 270 p.s.i.
2+50 August 3, 2004 14-Day 240 p.a.i.
1+08 Augusl4, 2004 13-Day 940 p.a.i.
August 30, 2004
August 31, 2004
September 1, 2004
Per our discussion Friday, August 20, 2004, North Texas Contra~ng may proceed with the asphalt
overlay work (respective water line pressure and bacte~ological tests have passed / been accepted).
Continsent upon the flowable flips Average Cylinder Breaks meeting the minimum 28-Day
compreseive strength orS00 p.s.i., Dallas County shall either:
require an exlemion of the two (2) year Comractor's Performance Bond, or
negotiate with the Contractor a reduction in the Total Unit Price for Bid Item No. I-?,
Flowable Backfill.
attached are thc utility trench backfill Reports No. 1, 2, and 3 by Team for Water Line "W-I".
411 Elm Street, 4a' Floor Dallas, Texas 75202 214-653-7151 Fax 214-653-6445
Mr, G~f~-,
Augu,~ 23, 2004
P.ge Two
County looks forwerd to Sc succcss~l compl~on of the CDBG CoppeB FY 2002 W~,ter
& Fire Hydrants Project. Should you h~ve eay quc'stion~, please c~li me at 214-~$3-6240.